Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.9 LAdmitted-Finance | -34.66% | ₹10.9 L | L1 | Admitted-Finance |
| 2 | L2₹11.2 L+₹26,114.56 (2.39%)Admitted-Finance | -33.10% | ₹11.2 L+₹26,114.56 (2.39%) | L2 | Admitted-Finance |
| 3 | L3₹11.3 L+₹36,158.62 (3.31%)Admitted-Finance | -32.50% | ₹11.3 L+₹36,158.62 (3.31%) | L3 | Admitted-Finance |
| 4 | L4₹11.3 L+₹39,171.84 (3.58%)Admitted-Finance | -32.32% | ₹11.3 L+₹39,171.84 (3.58%) | L4 | Admitted-Finance |
| 5 | L5₹11.5 L+₹59,427.36 (5.43%)Admitted-Finance | -31.11% | ₹11.5 L+₹59,427.36 (5.43%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
18 May 2026, 2:00 pmClosed
CE
Nagar Nigam Ayodhya
Amaniganj ward ke mohalla pathan toliya me santosh ke makan tak cc road va nali nirman ka karya as per nit 01
2026_DOLBU_1142532_1
52/15va/NNA/2026
Open Tender
Civil Works
Percentage
30 days
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,350
MC
₹1.7 L
22 Jul 2026
27 Apr 2026
18 May 2026
27 Apr 2026
18 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old and damage cement Convrete etc all complete | 90 | Cum | 1,050 | ₹94,500 |
| 2 | E/W in excavation all complete. S.J.No 251 | 30 | Cum | 125 | ₹3,750 |
| 3 | P/L P.C.C. work in 1:5:10 with cement F/sand and 40mm brick ballast etc all complete. Work SI No 274 | 12 | Cum | 4,125 | ₹49,500 |
| 4 | Class 150 brick work in 1:4 C.sand all complete. SI No 305b | 28.92 | Cum | 5,390 | ₹1,55,878.8 |
| 5 | P/L P.C.C. work in 1:2:4 with cement, C/sand and stone etc all complete. Wark SI No 274 | 5.7 | Cum | 7,850 | ₹44,745 |
| 6 | 12 mm thick plaster in 1:3 with cement and c/sand etc all complete | 84 | sqm | 190 | ₹15,960 |
| 7 | Supply & Laying of G.S.B. etc all complete work | 72 | Cum | 3,866.86 | ₹2,78,413.92 |
| 8 | Providing and laying C.C. pavement of mix M-20 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator 10, vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-Incharge. | 90 | Cum | 9,070 | ₹8,16,300 |
| 9 | P/mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of 11 Engineer-In-charge complete in all respect NON METALLIC C.C HARDNER (@5 kg HARDNER per sqm of surface area SAME AS IN d.s.r. 26.31.1 | 600 | sqm | 96.25 | ₹57,750 |
| 10 | R.C.C work in 1:1.5: 3 with cement c/sand and 20mm stone grit etc all complete. | 11.25 | Cum | 8,650 | ₹97,312.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_2133754.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .