| 1 | Admitted-Finance UTTAR PARA | Admitted-Finance |
| 2 | Rejected-Technical BALITIKURI KALITALA DAMODAR APARTMENT 2ND FLOOR HOWRAH 711113 WEST BENGAL | HOWRAH | HOWRAH | WEST BENGAL | 711113 | Rejected-Technical TECHNICALLY REJECTED |
| 3 | Rejected-Technical S N BANERJEE ROAD SODEPUR NORTH 24 PARGANAS KOLKATA 700110 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700110 | Rejected-Technical TECHNICALLY REJECTED |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
17 Sept 2024, 5:00 pmClosed
OFFICE OF THE SUPERINTENDING ENGINEER,SOUTH CIRCLE
Kausallya,OppositeKausallyaT.O.P.,Kharagpur,Dist-PaschimMedinipore
Sinking and Development of deep tube wells of size 300 mm X 200 mm dia by Direct Rotary rig method installation of pressure type Iron Elimination Plant laying of clear water rising main from tube wells to OHRs of Sonamukhi Municipality.
2024_MAD_736424_1
MED/SE(S)/373/W-6/06 Pt-III Dated-20/08/2024
Open Tender
CIVIL WORKS
180 days
Sonamukhi Municipality.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10 L
Yes
OFFICE OF THE SUPERINTENDING ENGINEER SOUTH CIRCLE
26 Oct 2024
20 Aug 2024
19 Sept 2024
20 Aug 2024
17 Sept 2024
20 Aug 2024
29 Aug 2024
Amount
Sinking of 300mm X 200mm dia. Deep tube well ,each of 110 m (more or less) deep by direct rotary Rig method using UPVC pipes (CD) and UPVC deep PIPE including Development (Min. 8 Hr. continuous) of tube well by using suitable air compressor (Min. Capacity: 600CFM & operating Pressure 14 Bar) followed by yield testing with BHT pump (Head :45 to 50mtr.,Discharge :1100 to 1000 LPM and 25 BHP engine) all complete including To & Fro Transportation cost and Cost of fuels, lubricants & Labour etc.
From 6 Mrt to 60 Mtr
From 60 Mrt to 90 Mtr
From 90 Mrt to 120 Mtr
Development (Min. 8 Hr. continuous) of tube well by using suitable air compressor (Min. Capacity: 600CFM & operating Pressure 14 Bar) followed by yield testing with BHT pump (Head :45 to 50mtr.,Discharge :1100 to 1000 LPM and 25 BHP engine) all complete including To & Fro Transportation cost and Cost of fuels, lubricants & Labour etc.
Construction of Pump House (6x4) mtr With Sanitary Arrangement at different Sites.
Supplying, Fabrication, Erection on suitable RCC foundation and Commissioning with 3 (three) months Trial Run (including cost of routine testing of water sample for performance evaluation) of pressure type Iron removal plant as per design norms of the P.H.E. Dte. with necessary accessories viz. MS fabricated shell with minimum 10 mm thick MS plate with 2 (two) coats of anticorrosive paint & minimum 12 mm thick MS media supporting plate fitted with required no. of pot strainer, MS fabricated oxidation chamber with minimum 10 mm thick plate with necessary pipe connection, valves, Gauges & other instruments as required as per departmental approved design & drawing including cost of filter media, Air Compressor & Air blower with motor, starter, main switch etc. of required capacity & approved specification including power connection from main line etc. all complete.
For Demand 79.58 cum/hr ( zone-1) (Two unit of 40 cum/hr)
For Demand 151.58 cum/hr ( zone-2) (Three unit of 50 cum/hr)
For Demand 95.66 cum/hr ( zone-3) (Two unit of 50 cum/hr)
Construction of Blower room of size 6mx4m (3 Nos)
Construction of Concrete platfrom
Construction of masonary Drain 300x300 mm (Each site 20 m)
Laying of D.I. (K-9) pipes with all D.I. Specials and valves including Supply and delivery at site ISI marked Socket and Spigot jointing system centrifugally cast DI (K9/K7) Pipes conforming to IS 8329-2000 (Third revision) in standard length 4 m, 5 m, 5.50 m, 6 m for push-on joint (rubber gasket) with internal cement mortar lining and external protection by metallic zinc coating with finish layer of bituminous /epoxy coating on outside as per IS: 8329-2000 specification with necessary jointing material rubber gasket (IS: 5382:1985) and M.S. Pipes including transportation, loading unloading and stacking at site including supply of polyethylene sleeves, including earth work in excavation in trenches, shoring (if necessary) of adequate width having minimum depth to keep the top surface of pipe 1.10 m below of the existing ground level in any kind of soil mixed with boulder, metal crust, concrete pavement, any road sub-grade and its flank etc., dewatering the trenches, preparing the bottom surface of the trenches for continuous bedding including sand filling (if necessary) Over-Ground installation to cross small ditches etc. supported with RCC pillars and fitting, fixing, jointing (all types of joints) valves, specials etc. as per requirement, in position, cutting, chamfering of pipes as required, carriage of materials from departmental store to work site (if any), constructing sluice valve chambers including supply and fitting in position sluice valve of different dia. & supply and fitting in position D.I. Specials ,Thrust Blocks as per requirement, filling of the trenches with excavated materials, consolidating the same in layers, guarding trenches with temporary bamboo railing for safety where necessary, emergency horizontal auger boring (for roads other than NH and Railway) where necessary, removing the surplus materials from the site as per municipal rules in vogue including all labour charges, tools and plants, hydraulic pressure testing, cleaning and disinfection of pipes etc. complete in all respect as per IS 12288¬1987 (latest edition) and Temporary Roads Restoration for vehicular movement as per instruction of the E.I.C.
100 mm dia. DI K9 Pipe
150 mm dia. DI K9 Pipe
200 mm dia. DI K9 Pipe
250 mm dia. DI K9 Pipe
100 mm dia. MS Pipe
150 mm dia. MS Pipe
200 mm dia. MS Pipe
Supplying fitting fixing of Sluice valves and construction of Sluice Valve Chamber as per specification and drawing
100 mm dia Sluice valve
150mm dia Sluice valve
200mm dia Sluice valve
250mm dia Sluice valve
Supplying fitting fixing of Air Release Valves as per specification and drawing
80 mm dia Air Release Valves
100mm dia Air Release Valves
Pipe carrying pipe for Rising main
Surveying, design, drawing, constructionof One no Pipe Carrying Bridge(In Clear Water Rising Main Line) over Canal For 200 mm DI K-9 Pipe in CWRM Line , In Zone -III, Ward- 09 ,Near Sonamukhi Boro Pukur Bagan (23°18'18.50"N, 87° 24'11.33"E) , Length -15 Mtr, Width-1.5 mtr within Sonamukhi Municipality under AMRUT 2.0
Electro Mechanical work
Electro Mechanical work for new 2 nos and existing 2 nos deep tube well and pump house in Zone I
Electro Mechanical work for new 5 nos and existing 2 nos deep tube well and pump house in Zone II
Electro Mechanical work for new 4 nos and existing 2 nos deep tube well and pump house in Zone III
Operation & Maintenance of the whole Installation for the period of five Years (after trial run) deploying adquate number of working personnel for round the clock operation and supply & delivery of Chlorine at site as per requirement, specification &direction of E.I.C.
Deploying (4+10+8=22 no Labour per month for 3 zones ) 22x12x5=1320 number of working personnel for 5 year for round the clock operation
Supply & delivery of Chlorine at site (Minimum 0.2 mg/l) for 5 year ( Water demand 4.079 mld) [4.079x 0.3x365x5=2233kg ]
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid