| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹16.6 L+₹23,816.23 (1.46%)Rejected-Finance | L2 | Rejected-Finance reject | |
| 3 | Rejected-Technical HIMACHAL PRADESH | - | Rejected-Technical They have requested withdrawal from the tender due to unavoidable circumstances, hence rejected. | |
| 4 | Rejected-Technical | - | Rejected-Technical They have requested withdrawal from the tender due to personal circumstances, hence rejected. |
Tender Value
₹15.9 L
EMD Value
₹31,760
Closing Date
4 Mar 2026, 9:30 amClosed
Executive Engineer HPPWD Shimla Division No. III
E. E. Shimla DIVISION NO. III, HPPWD, Shimla-3
C.O new Servant Quarter at Abber foile above Auckland Tunnel at Shimla. SH C.O 1 Room set with toilet and kitchen at Abberfoile along with type VI quarter
2026_PWD_129516_1
D-III_21985-99dt.23-02-2026
Open Tender
Civil Works - Buildings
Percentage
30 days
Auckland Tunnnel
As per SBD
10 documents required · 10 mandatory
₹500
₹31,760
2 Oct 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in all heights and depths or in foundation trenches etc. in all kinds of soil including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiesling and wedging out of rock (where blasting is prohibited and their intermediate classifications soils including dewatering where ever required, setting out to required lines, levels as shown on the drawing and directed by the Engineer-in-charge at site, according to the CPWD specification and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site including prescribed dumping charges to be arranged by the contractor himself to the satisfaction of Engineer-in-Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour machineries, tools equipments and safety measures and incidentals necessary to complete the work wise mechanical means and labour (if required) all useful material such as stones,shingles aggregate and slates shall be properly stacked at site to the meximum possible extent in all leads and lifts through all modes of transportation and used/removed as per the direction of Engineer-in-charge. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor including carriage of materials within all leads and lifts in all respect including all incidental charges:- All kinds of soil. | 36.8 | Per Cubic Metre | 850 | ₹31,280 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. including carriage of all labour equipments and materials to various location through all modes of transportation within all leads, lifts and other incidential charges. | 2.81 | Per Cubic Metre | 1,650 | ₹4,636.5 |
| 3 | Providing form work with steel plates 3.15 (Three point One Five ) millimeters thick welded with angle iron in frame 30*30*5 (Thirty into Thirty into Five ) millimeters, so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden/steel battens and ballies in all heights of propping and centering below supporting floor to ceiling and removal of the same in-situ-reinforced concrete and plain concrete work including carriage of all labour equipments and materials to various location through all modes of transportation within all leads, lifts and other incidental charges (i) Foundation footing and basis of columns, etc. and mass concrete. | 1.04 | Per cubic Metre | 270 | ₹280.8 |
| 4 | Vertical surfaces such as walls (any thicknes) partitions and the like including attached pillasters buttresses, plinth and string courses and the like. | 55.52 | Per Square Metre | 250 | ₹13,880 |
| 5 | (iii) Suspended floors, roofs, landings, balconies and access platform | 37.65 | Per Square Metre | 325 | ₹12,236.25 |
| 6 | (iv) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 13.73 | Per Square Metre | 350 | ₹4,805.5 |
| 7 | (v) Columns, Pillars, Piers, Abutments, Posts and Struts | 8.4 | Per Square Metre | 420 | ₹3,528 |
| 8 | (vii) Edges of slabs and break in floors and walls :- (a) | 29.98 | Per running Metre | 140 | ₹4,197.2 |
| 9 | Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand: 10graded stone aggregate 40 mm nominal size) mechnical mixed and curing complete excluding cost of centring and shuttering in Foundation and plinth as required complete including carriage of all labour equipments and materials to various location through all modes of transportation within all leads, lifts and other incidential charges. | 4.2 | Per cubic Metre | 3,450 | ₹14,490 |
| 10 | Providing and laying cement concrete 1:4:8 (1 Cement : 4 coarse sand : 8 gradedstone aggregate 40 mm nominal size) mechnical mixed and curing complete excluding cost of centring and shuttering in Foundation and plinthas required complete including carriage of all labour equipments and materials to various location through all modes of transportation within all leads, lifts and other incidential charges. | 2.14 | Per cubic Metre | 4,300 | ₹9,202 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
SBD1587751.pdf
Tender Documents • 2.14 MB
BOQ_191497.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .