Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical GURSARAI JHANSI UTTAR PRADESH | JHANSI | UTTAR PRADESH | 284001 | Accepted-Technical Accept |
| 3 | Accepted-Technical | Accepted-Technical Accept |
Tender Value
₹48.8 L
EMD Value
₹97,549
Closing Date
2 May 2026, 5:00 pmClosed
EO NP Todi Fatehpur
NP Todi Fatehpur
NP Todi Fatehpur Ke Ward No. 09 Mohalla Najarganj me Maira Talab ka nirman/ Saundaryakaran karya.
2026_DOLBU_1137871_1
1137/NP Todi-E-Tendering/2026-27 Date- 16.04.2026
Open Tender
Civil Works
NP Todi Fatehpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,755
Yes
EO NP Todi Fatehpur
₹97,549
Yes
11 May 2026
17 Apr 2026
4 May 2026
17 Apr 2026
2 May 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetations grass, bush, wood trees and saplings of girth upto 30 cm. Measured at a height of 1 metre above ground level & removal of rubbish upto a distance of 50 metres outside the periphery of area cleared. SI No. 259.Ch-4. | - | Sqm | - | - | 1 |
| 2 | Earth work in filling and cutting for embankment with mechanically compacted. | - | cum | - | - | 2 |
| 3 | Excavation in soil mixed with moorum/ shingle/ kankar requiring the use of special T&P such as pickaxes, subbals etc.including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches. S.I no - 252.Ch.4 | - | Cum | - | - | 3 |
| 4 | Sand filling in plinth including supply of necessary quantity of sand approved quarry from the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. (As per S.I. no.-255) | - | Cum | - | - | 4 |
| 5 | Cement concrete with 4 cm (1.5") gauge approved stone ballast, approved coarse sand and cement in the proportion of 8 : 4 : I including supply of all materials, labour and T & P etc. required for proper completion of the work. SI No. 281 | - | Cum | - | - | 5 |
| 6 | Brick Work with non modular fly ash lime bricks (FALG Bricks) conforming to IS:12894, class designation 10 average compressive strength in foundation Cement mortar 1:6 (1 cement : 6 coarse sand) as per sor S.I. No. DSR 6.34.Ch-6. | - | Cum | - | - | 6 |
| 7 | RCC work with cement approved coarse sand, and 2cm (3/4") gauge, approved stone ballast in the proportion 1:1.5:3 in Slab, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. S.I. No.284 (1) Ch-5. | - | Cum | - | - | 7 |
| 8 | 12 mm thick plaster on brick work minimum thickness not less than 10 mm with cement mortar in proportion of 1:6 cement and fine sand of 1.25 fineness modulus including supply of all materials, labour and tools and plants etc required for proper completion of the work.SI No.17.58(III) | - | Sqm | - | - | 8 |
| 9 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | - | Cum | - | - | 9 |
| 10 | Providing and laying of 80mm Interlocking concrete block pavement laid in stone dust base and fill joint with fine sand. Joint filled after labling and dressing base including supply of all material, labour, T&P etc required for proper completion of the work.SI. No. New Item-3 Ch.-14. | - | Sqm | - | - | 10 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_2124641.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid