| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.1 CrAccepted-Finance | ₹1.1 Cr | L2 | Accepted-Finance L2 |
| 3 | L3₹1.2 CrAccepted-Finance | ₹1.2 Cr | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | D Murugan L1 | Kamalam Construction L2 | HARI CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B) | 786 | Cum | 81.49 ₹64,051.14 | 88.1 ₹69,246.60 | 90 ₹70,740 |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 606 | Cum | 3,071 ₹18.6 L | 3,308 ₹20.0 L | 3,500 ₹21.2 L |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 7,859 | Sqm | 77.42 ₹6.1 L | 83.7 ₹6.6 L | 85 ₹6.7 L |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 7,859 | Sqm | 15.34 ₹1.2 L | 16.58 ₹1.3 L | 20 ₹1.6 L |
| 5.00 | Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. | 393 | Cum | 9,899.35 ₹38.9 L | 10,702 ₹42.1 L | 10,702 ₹42.1 L |
| 6.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 with 46.28kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 236 | Cum | 10,001.56 ₹23.6 L | 10,812.5 ₹25.5 L | 10,812.5 ₹25.5 L |
| 7.00 | GST. 18% (CGST-9%, SGST-9%) | 1 | Nos | 16,02,880.32 ₹16.0 L | 17,31,533.58 ₹17.3 L | 17,59,422.78 ₹17.6 L |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
26 Nov 2025, 3:00 pmClosed
COMMISSIONER VILLUPURAM MUNICIPALITY
VILLUPURAM MUNICIPALITY
Providing Renewal of B.T. Road at East singapore nagar, Singapore nagar main road, Sriram nagar main, Sriram nagar, Durai arasan nagar main a, , Durai arasan nagar main, Durai arasan nagar main c in Villupuram Municipality PACKAGE 04
2025_MAWS_618966_4
8828/2025/E1
Open Tender
Civil Works
120 days
Villupuram Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.1 L
Villupuram Municipality
31 May 2026
1 Nov 2025
26 Nov 2025
1 Nov 2025
26 Nov 2025
1 Nov 2025
6 Nov 2025
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B)
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 with 46.28kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
GST. 18% (CGST-9%, SGST-9%)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
Document4.pdf
Tender Documents • 0.83 MB
BOQ_740309.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid