| 1 | L1₹232.6 CrAccepted-AOC PLAT NO 943 54TH STREET T V S COLONY ANNANAGAR WEST EXTENSION CHENNAI PIN 600 101 | CHENNAI | CHENNAI | TAMIL NADU | 600101 | ₹232.6 Cr Quoted ₹285.9 Cr | L1 | Accepted-AOC Plus Four Point Nine Nine Percentage excess over the Departmental value for the current year SoR |
| 2 | L2₹297.4 CrRejected-Finance 155 A KAIKATTIPUDUR TIRUPPUR ROAD AVINASHI 641654 | AVINASHI | TIRUPPUR | TAMIL NADU | 641654 | ₹297.4 Cr | L2 | Rejected-Finance Plus Thirty Four Point Two Seven percentage excess over the Departmental Value for the current Year SoR |
Tender Value
₹226 Cr
EMD Value
₹1.1 Cr
Closing Date
7 Mar 2023, 3:00 pmClosed
The Chief Engineer TWAD Board Coimbatore
Office of the Chief Engineer TWAD Board No 30 Siruvani Nagar Bharathipark Road Coimbatore 641 043
Combined Water Supply Scheme to Rasipuram Municipality 8 Town Panchayats and certain other rural habitations in Namakkal District Package 1 2nd Call Construction Period 18 months Trial Run 6 months and Paid Maintenance 60 months
2023_TWAD_289999_1
IFB25RasipuramPackage1_2ndcall
Open Tender
Civil Works
550 days
Rasipuram Municipality in Namakkal District
As per Bid Document 7.1 and 7.2
3 documents required · 3 mandatory
₹0
₹1.1 Cr
Yes
The Chief Engineer TWAD Board Coimbatore
8 Apr 2023
21 Feb 2023
8 Mar 2023
21 Feb 2023
7 Mar 2023
21 Feb 2023
21 Feb 2023 - 1 Mar 2023
1 Mar 2023
Head Works:
Construction of Coffer Dam arrangements in River Cauvery at Nadugulam
Construction of RCC Leading channel for 350 m length
Construction of Raw Water Collection well cum Pumphouse - Size is 20 m x 9 m x 9 m
Raw water Pumpsets with all accessories
Construction of LT HT Panel Room - Size 16 m x 7.5 m
Construction of Compressor Room - Size 5 m x 5 m
Construction of Office Room - Size 6.5 m x 4 m
Construction of SCADA Room -Size 7.5 m x 6 m
Construction of Compound Wall
Construction of Retaining Wall along and across the River
Construction of Security Room at Head Works - Size 1.50m x 2.0m
Mechanical Items at Headworks
Raw Water Pumping main with allied civil works
CONSTRUCTION OF 76.14 MLD FULL SCALE TREATMENT PLANT AT KARATTU PUDHUR
Aerator
Stilling chamber
Raw water measuring channel
Dividing chamber
Flashmixer -2Nos
Clarifloccultor-2Nos
Construction of Bye Pass channel Between Flow Measuring Channel to Filter House
Clarified water channel from Clariflocullator to Filter House
Construction of Filter house and Annexure Buildings For Chemical House, Chlorine House, Mechanical and office Rooms
Pipe connection works
Mechanical and Electrical and Mechanical Items for 76.14 MLD Plant
Construction of 7.50 LL Capacity Wash Water Tank at WTP @ 12.0 m Staging Height
Provision of laying of inside road, side drains, cross drainage works etc., complete
Developing Green Belt Around WTP and Providing Landscapping and Gardening
Construction of 'B' Type Quarters (TWIN TYPE)
Construction of 'C' Type Quarters (TWIN TYPE) in Treatment Plant Site
Construction of Compound Wall around Treatment Plant
Construction of Sludge Collection Well
SCADA arrangements
Construction of SCADA room
Construction of Control Room of size 7.50 m x 6.00 m
Construction of Security Room for 2.75 m x 2.25 m size.
Construction of Office Room of 6.50 m x 4.00 m size
Construction of LAB building
Construction of Bath cum Toilet of Size 3 m x 3 m x3 m at Water Treatment Plant Site
Clear Water Sump, Pumproom, Pumpsets and allied Mechanical and Civil works at Water Treatment Plant
Construction of Pump room cum Baby sump 8.40 LL Capacity - 20 m x 9 m x 9 m
Supply, Delivery ,Erection and Testing of Vertical Turbine Pumpsets at Clear Watrer and Filter House MCC and all accessories
Construction of HT LT Panel Room
Construction of Compressor room
Internal Mechanical works
Construction of Clear Water Sump at WTP 34.60 LL
Clear Water Pumping main from Kattur Water Treatment Plant to Erumaipatty booster station
Maintenance of the Scheme for a period of Five Years (60 months) (Paid maintenance)
VR WATER INFRA COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid