| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.6 CrAccepted-AOC | ₹91.6 Cr | L1 | Accepted-AOC OK |
| 2 | L2₹101.1 CrAccepted-AOC | ₹101.1 Cr | L2 | Accepted-AOC OK |
| 3 | L3₹113.9 CrAccepted-AOC | ₹113.9 Cr | L3 | Accepted-AOC OK |
| 4 | L4₹116.8 CrAccepted-AOC | ₹116.8 Cr | L4 | Accepted-AOC OK |
| 5 | Rejected-Technical | - | - | Rejected-Technical Required quantity not fulfill and required electrical document not submitted on given date |
| Sl No | Description | Qty | Unit | M/s. Vijay Construction L3 | M/s Super Construction Co Nagpur L4 | D. V. Patel and Company L1 | Dhansmruti Buildcon Pvt Ltd L2 |
|---|---|---|---|---|---|---|---|
| 1.00L | |||||||
| 1.10 | Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc. | 97.15 | One Cubic Metre | 350 ₹34,002.50 | 375 ₹36,431.25 | 327 ₹31,768.05 | 335 ₹32,545.25 |
| 1.20 | First Floor | 82.8 | One Cubic Metre | 350 ₹28,980 | 380 ₹31,464 | 327 ₹27,075.60 | 338.35 ₹28,015.38 |
| 2.00 | Dismantling stone masonry in lime or cement mortar including stacking the materils as directed with all leads, lifts etc. | 79.13 | One Cubic Metre | 400 ₹31,652 | 375 ₹29,673.75 | 371 ₹29,357.23 | 380 ₹30,069.40 |
| 2.10 | First Floor | 125.21 | One Cubic Metre | 400 ₹50,084 | 380 ₹47,579.80 | 371 ₹46,452.91 | 383.8 ₹48,055.60 |
| 3.00 | Removing lime or lean cement concrete including stacking the spoils as directedwith all leads, lifts etc, complete. | 37.74 | One Cubic Metre | 600 ₹22,644 | 375 ₹14,152.50 | 546 ₹20,606.04 | 558 ₹21,058.92 |
| 3.10 | First Floor | 152.94 | One Cubic Metre | 600 ₹91,764 | 380 ₹58,117.20 | 546 ₹83,505.24 | 563.58 ₹86,193.93 |
| 4.00 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete | 321.3 | One Square Metre | 50 ₹16,065 | 100 ₹32,130 | 44 ₹14,137.20 | 45 ₹14,458.50 |
| 4.10 | First Floor | 321.3 | One Square Metre | 50 ₹16,065 | 105 ₹33,736.50 | 44 ₹14,137.20 | 45.45 ₹14,603.09 |
| 5.00 | Removing doors and windows with frames and stacking the materials as directed
with all leads, lifts etc. complete. | 32 | One Number | 165 ₹5,280 | 200 ₹6,400 | 147 ₹4,704 | 156 ₹4,992 |
Tender Value
₹106.2 Cr
EMD Value
₹59 L
Closing Date
3 Jul 2025, 5:45 pmClosed
Ex.Engr. P.W.Dn. No.2, Civil Lines, Nagpur
Bandhkam Sankul Vibhag, Civil Lines, Nagpur
CONSTRUCTION AND DEVELOPMENT OF VITTAL RUKHAMANI TEMPLE PREMISES WITH ELECTRIFICATION AT DHAPEWADA TAHASIL KALMESHWAR AND DISTT. NAGPUR (Including Electrical Work)
2025_PWR_1183290_1
NGP/DN.2/04-01/SBD/2025-2026
Open Tender
Civil Works - Others
730 days
Tahasil Kalmeshwar Distt.Nagpur
Separately Attached
3 documents required · 3 mandatory
₹5,600
via Net Banking
₹59 L
Chief Engineer, Public Works Region, Nagpur
8 Nov 2025
23 May 2025
7 Jul 2025
23 May 2025
3 Jul 2025
23 May 2025
6 Jun 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 1.13 MB
Tenderdocument.pdf
Tender Documents • 5.44 MB
Tenderdocument_2.pdf
Tender Documents • 19.56 MB
Download all tender documents and submit your bid