| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | L1 | Accepted-AOC L1 Accept | |
| 2 | L2₹7.7 L+₹14,871.23 (1.97%)Rejected-Finance | L2 | Rejected-Finance L2 Reject | |
| 3 | L3₹8.1 L+₹54,140.72 (7.16%)Rejected-Finance | L3 | Rejected-Finance L3 Reject | |
| 4 | L4₹8.4 L+₹87,890.67 (11.6%)Rejected-Finance | L4 | Rejected-Finance L4 Reject |
| Sl No | Description | Qty | Unit | T MANOGARAN L2 | R. KUMAR L1 | BALASUBRAMANIAN L4 | M SANTHI L3 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of Kitchen Shed Cum Store Room at Piranthani PUMS in Poovalur Panchayat. | |||||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in all clauses of soils such as as per S.S.20B for narrow foundation etc. complete. | 18.48 | Cum | 250 ₹4,620 | 240.04 ₹4,435.94 Lowest | 263.78 ₹4,874.65 | 253.23 ₹4,679.69 |
| 3.00 | Sand filling with filling sand including cost and conveyance of all materials to site and all labour charges etc., complete. | 5.32 | Cum | 2,100 ₹11,172 | 2,027.87 ₹10,788.27 | 2,019.28 ₹10,742.57 | 1,938.51 ₹10,312.87 Lowest |
| 4.00 | Supplying and filling of conveyed earth with a lead of 1Km for basement filling | 8.8 | Cum | 220 ₹1,936 | 210.01 ₹1,848.09 Lowest | 446.98 ₹3,933.42 | 429.1 ₹3,776.08 |
| 5.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 5.32 | Cum | 5,300 ₹28,196 | 5,219.09 ₹27,765.56 Lowest | 5,726.19 ₹30,463.33 | 5,497.14 ₹29,244.78 |
| 6.00 | R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete. | 14.59 | Cum | 8,900 ₹1,29,851 | 8,673.91 ₹1,26,552.35 Lowest | 9,504.91 ₹1,38,676.64 | 9,124.71 ₹1,33,129.52 |
| 7.00 | Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete. | 22.31 | Cum | 5,900 ₹1,31,629 | 5,800.69 ₹1,29,413.39 Lowest | 6,175.6 ₹1,37,777.64 | 5,928.58 ₹1,32,266.62 |
| 8.00 | Supplying and errecting Centering for sides and soffixs of all RCC works including cost and conveyance of all materials to site and all labour charges etc., complete. | 97.95 | Sqm | 1,000 ₹97,950 | 996.45 ₹97,602.28 Lowest | 1,095 ₹1,07,255.25 | 1,051.2 ₹1,02,965.04 |
| 9.00 | Cost and supply of steel with fabrication charges including cost of steel and binding wire complete with standard specification etc., complete | 0.67 | MT | 82,500 ₹55,275 | 81,840.87 ₹54,833.38 Lowest | 91,880.58 ₹61,559.99 | 88,205.36 ₹59,097.59 |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 29.33 | Sqm | 290 ₹8,505.7 | 281.05 ₹8,243.2 Lowest | 308.85 ₹9,058.57 | 296.5 ₹8,696.35 |
Tender Value
₹8.4 L
EMD Value
₹8,440
Closing Date
5 Dec 2025, 3:00 pmClosed
Bdo.Avudaiyarkoil
Pt.Union Office,Avudaiyarkoil
Construction of Kitchen Shed Cum Store Room at Piranthani PUMS in Poovalur Panchayat
2025_RDTN_627368_1
Avk/NPMDMS/Work
Open Tender
Civil Works
Item Rate
Avudaiyarkoil
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,440
17 Dec 2025
28 Nov 2025
5 Dec 2025
28 Nov 2025
5 Dec 2025
28 Nov 2025
Amount
Construction of Kitchen Shed Cum Store Room at Piranthani PUMS in Poovalur Panchayat.
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Sand filling with filling sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and filling of conveyed earth with a lead of 1Km for basement filling
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and errecting Centering for sides and soffixs of all RCC works including cost and conveyance of all materials to site and all labour charges etc., complete.
Cost and supply of steel with fabrication charges including cost of steel and binding wire complete with standard specification etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc.,
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc
Supply and fixing of STEEL DOOR including cost and conveyance of all materials and all labour charges etc., complete.
Supply and fixing of STEEL WINDOWs including cost and conveyance of all materials and all labour charges etc., complete.
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Painting in two coats with Distember including all cost and labour charges etc., complete
Painting in two coats with Emulsion including all cost and labour charges etc., complete
Painting in two coats with Over the new Iron work including all cost and labour charges etc., complete
Supply and Fixing of Cudappa Slab 20/30mm thick etc
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD 20
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC Plug Point etc
Supply and Fixing of W.T.Bulk head fittings with guard Suitable for lamp with 40w bulb with PVC unsheathed leads from terminal to the fittings
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 24 of Section 2 of Instruction to Bidders (ITB) of SBD)
T MANOGARAN (BID ID -1527801)
M SANTHI (BID ID -1527787)
BALASUBRAMANIAN (BID ID -1527803)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Avk-Doc.pdf
Tender Documents • 0.29 MB
BOQ_750075.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .