| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L | L1 | Accepted-AOC L1 Quoted Less than tender Value |
| 2 | L2₹8.5 LRejected-AOC | ₹8.5 L | L2 | Rejected-AOC L2 Quoted More than tender value |
| 3 | L3₹9.3 LRejected-AOC | ₹9.3 L | L3 | Rejected-AOC L3 Quoted More than tender value |
| Sl No | Description | Qty | Unit | DMBUILDERS L1 | P GUNASEKARAN L2 | D Rajendran Suppliers L3 |
|---|---|---|---|---|---|---|
| 1.00VELLORE DISTRICT CONSTRUCTION OF THRESHING FLOOR IN PADAVETTAN KOTTAI ROAD NEAR ARULMIGU SOOLAI VENDIYAN KOVIL IN KAMMASAMUTHIRAM PANCHAYAT KANIYAMBADI BLOCK PACKAGE NO 01 | ||||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 31.15 | cum | 200 ₹6,230 | 245.32 ₹7,641.72 | 268.42 ₹8,361.28 |
| 3.00 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete. | 53.9 | cum | 4,950 ₹2.7 L | 5,101.67 ₹2.7 L | 5,582.21 ₹3.0 L |
| 4.00 | Supply and Erecting Centering for all items including curing etc., complete complying with standard specifications. | 121.45 | Sqm | 415 ₹50,401.75 | 509.18 ₹61,839.91 | 557.14 ₹67,664.65 |
| 5.00 | Cement Concrete 1:3:6 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete. | 20.36 | cum | 5,900 ₹1.2 L | 5,834.1 ₹1.2 L | 6,383.63 ₹1.3 L |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including Cost and conveyance of all materials to site and all labour charges etc | 35.3 | Sqm | 6,750 ₹2.4 L | 6,404.2 ₹2.3 L | 7,007.44 ₹2.5 L |
| 7.00 | Provision for Bitumous Pad | 1 | cum | 1,000 ₹1,000 | 1,116 ₹1,116 | 1,221.12 ₹1,221.12 |
| 8.00 | Provision for Waiting Shed MS Tubular Pipes and Galvanue Sheets including cost and conveyence and labour charges, welding charges etc. complete | 1 | Sqm | 18,000 ₹18,000 | 27,900 ₹27,900 | 30,528 ₹30,528 |
| 9.00 | Provision For Nameboard Charges | 1 | no | 1,500 ₹1,500 | 930 ₹930 | 1,017.6 ₹1,017.60 |
| 154.00 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | Each | 1,26,420.44 ₹1.3 L | 1,29,466.47 ₹1.3 L | 1,41,661.28 ₹1.4 L |
Tender Value
Refer Docs
EMD Value
₹18,420
Closing Date
22 Jan 2026, 3:00 pmClosed
The Block Development Office kanyambadi
The Block Development Office kanyambadi
VELLORE DISTRICT CONSTRUCTION OF THRESHING FLOOR IN PADAVETTAN KOTTAI ROAD NEAR ARULMIGU SOOLAI VENDIYAN KOVIL IN KAMMASAMUTHIRAM PANCHAYAT KANIYAMBADI BLOCK PACKAGE NO 01
2026_RDTN_641209_1
B2/726/2025 KBI JAN 01-26
Open Tender
Civil Works
180 days
The Block Development Office kanyambadi
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹18,420
11 Mar 2026
9 Jan 2026
22 Jan 2026
9 Jan 2026
22 Jan 2026
9 Jan 2026
VELLORE DISTRICT CONSTRUCTION OF THRESHING FLOOR IN PADAVETTAN KOTTAI ROAD NEAR ARULMIGU SOOLAI VENDIYAN KOVIL IN KAMMASAMUTHIRAM PANCHAYAT KANIYAMBADI BLOCK PACKAGE NO 01
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete.
Supply and Erecting Centering for all items including curing etc., complete complying with standard specifications.
Cement Concrete 1:3:6 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including Cost and conveyance of all materials to site and all labour charges etc
Provision for Bitumous Pad
Provision for Waiting Shed MS Tubular Pipes and Galvanue Sheets including cost and conveyence and labour charges, welding charges etc. complete
Provision For Nameboard Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_767947.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
Tendernotice_2.pdf
PDF • 0.38 MB
BOQ_767947.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid