Loading…
Loading…
Tender Value
₹12.7 Cr
EMD Value
₹9.6 L
Closing Date
17 Aug 2026, 6:00 pm
Chief Engineer Jabalpur Zone
HQ Chief Engineer Jabalpur Zone Ridge Road Jabalpur
PROVN OF OTM ACCN AGNIVEER AT ARMY AIR DEFENCE CENTRE GOPALPUR
2026_MES_778667_1
753004A PROVN OF OTM ACCN AGNIVEER AT ARMY AIR DEFENCE CENTRE GOPALPUR
Open Tender
Civil Works
Lump-sum
545 days
GOPALPUR
AS PER NIT
8 documents required · 8 mandatory
₹3,000
GE I Gopalpur-on-Sea
₹9.6 L
Yes
17 Aug 2026
16 Jul 2026
24 Aug 2026
16 Jul 2026
17 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the tenderer) | - | - | - | - |
| 2 | Item No 01 A :
Design and construction of single living accommodation for 178 Ors & 2 Hav with permanent specification, RCC framed construction with RCC M-30 design mix, provision of mosquito proofing, provision of roof treatment, exterior emulsion paint on external surface & OBD in internal surface, complete all as specified and shown on drawings, soil bearing capacity report, design basis report and tender documents. | 1 | Each BLOCK | - | - |
| 3 | Item No 01 B:
Design and construction of cook house & dining hall (178 OR's & 2 Hav) for Agniveer with permanent specification RCC framed construction with RCC framed construction with RCC M-30 design mix, provision of mosquito proofing, provision of roof treatment, exterior emulsion paint on external surface & OBD in internal surface, complete all as specified and shown on drawings, soil bearing capacity report, design basis report and tender documents | 1 | Each BLOCK | - | - |
| 4 | Item No 01C : BLANK | - | - | - | - |
| 5 | Sch 'A' Part-II (Internal Electrification) Lump sum price worked out by the contractor for (Internal Electrification) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 6 | Sch 'A' Part-IIA (Internal Water Supply) Lump sum price worked out by the contractor for (Internal Water Supply) as listed in Schedule 'A' Part-IIA against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 7 | Sch 'A' Part-III (External Electric Supply) Lump sum price worked out by the contractor for (External Electric Supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 8 | Sch 'A' Part-IV (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 9 | Sch 'A' Part-V (Road, Path Curvert) Lump sum price worked out by the contractor for (Road, Path Curvert) as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 10 | Sch 'A' Part-VI (Fire Fighting) Lump sum price worked out by the contractor for (Fire Fighting) as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.99 MB
1T.pdf
Tender Documents • 5.26 MB
DGRS_gos 1_merged (1).pdf
Additional Documents • 26.17 MB
BOQ_872407.xls
BOQ • 0.75 MB
c8.pdf
PDF • 0.29 MB
C7.pdf
PDF • 0.12 MB
c6.pdf
PDF • 0.22 MB
C4.pdf
PDF • 0.11 MB
c3_merged.pdf
PDF • 1.20 MB
C2.pdf
PDF • 0.21 MB
C1.pdf
PDF • 5.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].