Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | -41.10% | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹2.5 LAdmitted-Finance | -33.73% | ₹2.5 L | L2 | Admitted-Finance |
| 3 | L3₹2.5 LAdmitted-Finance | -33.33% | ₹2.5 L | L3 | Admitted-Finance |
| 4 | L4₹2.8 LAdmitted-Finance | -28.00% | ₹2.8 L | L4 | Admitted-Finance |
| 5 | L5₹2.9 LAdmitted-Finance | -25.00% | ₹2.9 L | L5 | Admitted-Finance |
Tender Value
₹3.8 L
EMD Value
₹7,640
Closing Date
28 Mar 2026, 6:00 pmClosed
Executive Engineer PWD(RandB) Div Khour
Executive Engineer PWD(RandB) Div Khour
Construction of Boys toilet at Shaheed Shamsher Singh Higher Secondary School Jourian. Under Samagra Shiksha-2025-26 (3RD Call)
2026_PWDJK_306607_1
Fresh Short e-NIT No. 70 of 2025-2026/Khour Dated 23-03-2026
Open Tender
Civil Works
45 days
KHOUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD(RandB) Div Khour
₹7,640
Yes
Executive Engineer PWD(RandB) Div Khour
18 Apr 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
28 Mar 2026
23 Mar 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | |||||
| 2 | Providing and laying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | - | cum | 4,826.5 | - |
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | |||||
| 4Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement with.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 5Centring and Shuttering including strutting, propping etc and removal of form work for Foundations, footings, bases for columns. | |||||
| 6Edges of slabs and breaks in floors and walls Under 20 cm wide | |||||
| 7Centring and Shuttering including strutting, propping etc and removal of form work Suspended floors, roofs, landings, balconies and access platform | |||||
| 8Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 9Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | |||||
| 10 | Brick work with brick of class designation 75 above plinth level upto floor V level in cement mortar 1:6 | - | cum | 7,571.55 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_995476.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid