Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
6 Oct 2026, 3:00 pm
Superintending Engineer Ayodhya Circle UPAVP Ayodh
Superintending Engineer Ayodhya Circle UPAVP Ayodhya
Reconstruction work of the Kasturba Gandhi Girls School building at Mankapur District- Gonda
2026_UPHDB_1187420_1
1635/M-10/445 Dated 14.09.2026
Open Tender
Civil Works
Fixed-rate
180 days
MANKAPUR GONDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
OFFICE OF EXEN CD AYODHYA-3 UPAVP GONDA
₹2.7 L
18 Sept 2026
18 Sept 2026
6 Oct 2026
18 Sept 2026
6 Oct 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank egetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m bove ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 605.14 | CUM | 12.94 | ₹7,830.51 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 187.44 | CUM | 191.32 | ₹35,861.02 |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil | 7.43 | CUM. | 93.2 | ₹692.48 |
| 4 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 14.57 | CUM | 514.87 | ₹7,501.66 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ,including cost of form- work,in foundation and floors. | 54.62 | CUM | 5,006.82 | ₹2,73,472.51 |
| 6 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 47.2 | CUM | 1,560.96 | ₹73,677.31 |
| 7 | Providing and injecting chemical emulsion for Preconstructional anti-Termite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface If plinth filling junction of wall and floor, along the extemal perimeter of binding expansion jolnts,surrounding of pipes and conduit etc. complete (Plinth area of the building at ground floor only shall be measured as per I.S. 6313 (Part II 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or chlordane will be used. The rate of application of chemical emulsion shall be as Follows : (1) Treatment for Masonary & foundatiion 5 Liters per Sq.m. (2) Back fill in immediate contact with foundation 7.5 Litres per Sq.M. (3) Treatment,of Top surface of plinth filling 5 Litres per Sq.M. (4) Treatment junction of wall and the floor 7.50 Liters per Sq.M. (5) Treatment of soil along extnal Perimeter of building 7.50 Liters per Sq.M. (6) Treatment of soil along apron along external Perimeter 5.00 Liters per Sq.M. | 717.93 | SQM | 230 | ₹1,65,123.9 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 125.56 | CUM | 8,456.54 | ₹10,61,803.16 |
| 9 | As in item above but in R.C.C. Raft foundation and footing with approved stone ballast. (Using 1:1.5:3 Mix concrete) all work upto plinth level. | 56.46 | CUM | 6,648.63 | ₹3,75,381.65 |
| 10 | As in item above but in R.C.C. columns in 1:1.5:3 having strength not less than M-20 all complete as per DSR -5.2.2 | 23.05 | CUM | 7,976.92 | ₹1,83,868.01 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
FINKGBVMANKAPUR18092026.pdf
Tender Documents • 0.86 MB
TECHKGBVMANKAPUR18092026.pdf
Tender Documents • 11.82 MB
BOQ_2235722.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .