Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.5 LAccepted-AOC TUTICORIN TAMIL NADU | ₹5.5 L Quoted ₹7.1 L | 1 | Accepted-AOC L1 |
| 2 | 2₹7.8 LRejected-AOC | ₹7.8 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | THIAGARAJAN ENGINEERING CONTRACTORS L2 | S YOGARAJ CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for transporting of 1 No. sky climber from Boiler maintenance stores to site, erection of sky climber for cleaning of water wall in all sides of Boiler and removal of sky climber, return back to stores after completion of works. | 2 | No. | 45,000 ₹53,100 | 40,360 ₹47,624.80 |
| 2.00 | Charges for Shifting the position of sky climber inside the furnace for overhauling of coal/oil burners and erosion fill up work inside the furnace. | 2 | No. | 15,000 ₹17,700 | 13,360 ₹15,764.80 |
| 3.00 | Charges for transportation, dismantling, removal and replacement of worn out 6 Nos. coal compartments with new/ reconditioned assemblies, overhauling work of Burner tilting mechanism complete including the charges for T&Ps and all consumables including cover plate fixing HT bolts. | 2 | Corner | 5,00,000 ₹5.9 L | 4,82,000 ₹5.7 L |
| 4.00 | Charges for transportation, dismantling removal, inspection, reconditioning and replacement of worn out end air, intermediate air, oil nozzle tips with new/ reconditioned assemblies and related rectification works of respective compartment in one corner. including the charges for T&Ps and all consumables including cover plate fixing HT bolts. | 2 | Corner | 54,000 ₹63,720 | 49,020 ₹57,843.60 |
| 5.00 | Charges for removal of insulation skin casing sheets and insulation for an area of 3 m2 and removal of inner casing plate of 2 m2 and refixing the same after completion of work in burner area. | 2 | No. | 24,000 ₹28,320 | 19,900 ₹23,482 |
| 6.00 | Charges for Grinding of Boiler burner transition tubes for Arc filling of size 150 x 25 mm² area for 3 layers | 10 | No. | 65,000 ₹76,700 | 44,000 ₹51,920 |
| 7.00 | Charges for IBR Welder for Arc filling of area 150 x 25 mm² by 3 layers | 10 | No. | 23,000 ₹27,140 | 19,100 ₹22,538 |
| 8.00 | Charges for Supply of HT bolts of size M12 x 50 mm with nut & washer | 180 | No. | 9,360 ₹11,044.80 | 6,480 ₹7,646.40 |
| 9.00 | Charges for Supply of style 20 gasket for cover plates | 50 | Kg. | 15,000 ₹17,700 | 10,000 ₹11,800 |
| 10.00 | Charges for supply of Insulation wool confirming to IS8183- Density-150kg/cum, Size:1520x1220x60mm | 40 | M2 | 32,000 ₹37,760 | 23,600 ₹27,848 |
Tender Value
Refer Docs
EMD Value
₹5,900
Closing Date
3 Jan 2026, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit II Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit II Boiler during the year 2025 2026
2025_EB_632436_1
CE/TTPS/SE/M-II/No.324/2025-26
Open Tender
Miscellaneous Works
30 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹5,900
Yes
25 Mar 2026
15 Dec 2025
5 Jan 2026
15 Dec 2025
3 Jan 2026
15 Dec 2025
Charges for transporting of 1 No. sky climber from Boiler maintenance stores to site, erection of sky climber for cleaning of water wall in all sides of Boiler and removal of sky climber, return back to stores after completion of works.
Charges for Shifting the position of sky climber inside the furnace for overhauling of coal/oil burners and erosion fill up work inside the furnace.
Charges for transportation, dismantling, removal and replacement of worn out 6 Nos. coal compartments with new/ reconditioned assemblies, overhauling work of Burner tilting mechanism complete including the charges for T&Ps and all consumables including cover plate fixing HT bolts.
Charges for transportation, dismantling removal, inspection, reconditioning and replacement of worn out end air, intermediate air, oil nozzle tips with new/ reconditioned assemblies and related rectification works of respective compartment in one corner. including the charges for T&Ps and all consumables including cover plate fixing HT bolts.
Charges for removal of insulation skin casing sheets and insulation for an area of 3 m2 and removal of inner casing plate of 2 m2 and refixing the same after completion of work in burner area.
Charges for Grinding of Boiler burner transition tubes for Arc filling of size 150 x 25 mm² area for 3 layers
Charges for IBR Welder for Arc filling of area 150 x 25 mm² by 3 layers
Charges for Supply of HT bolts of size M12 x 50 mm with nut & washer
Charges for Supply of style 20 gasket for cover plates
Charges for supply of Insulation wool confirming to IS8183- Density-150kg/cum, Size:1520x1220x60mm
THIAGARAJAN ENGINEERING CONTRACTORS (BID ID -1549106)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_756620.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid