Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC LOI to MCE CONSULTING ENGINEEERS |
| 2 | Rejected-Technical | - | - | Rejected-Technical NOT RECOMMANDED |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT RECOMMANDED |
| 4 | Rejected-Technical | - | - | Rejected-Technical NOT RECOMMANDED |
Tender Value
Refer Docs
Closing Date
12 Jan 2022, 4:00 pmClosed
General Manager (Engineering)
Bridge and Roof Co. (India) Ltd Kankaria Centre (4TH/5th Floor) 2/1 Russel Street Kolkata 700 071
DESIGN, DETAILED ENGINEERING SERVICES FOR PIPING WORK INCLUDING 3D MODELING OF ENTIRE PLANT, PREPARATION OF ISOMETRICS, MTO, SUPPORT SCHEDULE, STRESS ANALYSIS ETC. FOR IOCLS GRASSROOT LUBE COMPLEX AT VILLAGES AMULLAVOYAL AND VAIKKADU, CHENNAI
2021_BandR_665033_1
BandR/EST/TY-754/DESIGN NIT B.3
Open Tender
Miscellaneous Works
Works
90 days
IOCL AMULLAVOYAL AND VAIKKADU
As Per Tender Document
12 documents required · 12 mandatory
₹5,900
Yes
Bridge and Roof Co.India Ltd
Exempted
6 Apr 2022
24 Dec 2021
13 Jan 2022
24 Dec 2021
12 Jan 2022
24 Dec 2021
Amount
Piping Design, Engineering, Deliverables as detailed in item sl. No. A.1
"Design & Engineering of all Piping & related items in all respects in accordance with the following project specifications, drawings, relevant codes & standards and instructions of consultant/owner shall include in the scope of work. Contractor to coordinate with other packages to deliver the drawings, documents, calculations, reports, lists, MTOs & as built drawings as per the deliverable list until approval from consultant/owner. Piping Design Basis : Section-2 of Std. Technical Specification for Piping. Layout Design Basis : Section-3 of Std. Technical Specification for Piping. Piping Material Specification : Section-19 of Std. Technical Specification for Piping. Stress Analysis Specification : Section-4 of Std. Technical Specification for Piping. Drafting Procedure : Section-16 of Std. Technical Specification for Piping. Ref. P&ID for Pipe, fitting elbows, reducers −expanders, tees, Expansion bellows, Hose assemblies/couplings, manual valves, flanges, strainers, steam traps, insulation and painting material quantity.
90-0RG2N-PID-001_P&ID FOR LUBE BLENDING 90-0RG2N-PID-002_P&ID FOR COOLANT PLANT 90-0RG2N-PID-003_P&ID FOR BRAKE FLUID 90-0RG2N-PID-004_P&ID FOR BITUMEN PLANT 90-0RG2N-PID-005_P&ID FOR TRANSFORMER OIL PLANT 90-0RG2N-PID-006_P&ID FOR WHITE OIL PLANT 90-0RG2N-PID-007_P&ID FOR RUBBER EXTENDER PLANT 90-0RG2N-PID-008_P&ID FOR GREASE PLANT 90-0RG2N-PID-009_P&ID FOR VI SOLUBILIZATION PLANT 90-0RG2N-PID-010_P&ID FOR LOBS LOADING 90-0RG2N-PID-113_P&ID FOR ADDITIVE STORAGE 90-0RG2N-PID-114_P&ID FOR FP TANKS 90-0RG2N-PID-115_P&ID FOR MB TANKS 90-0RG2N-PID-116_P&ID FOR BN EXTRACT PLANT 90-0RG2N-PID-117_P&ID FOR FILLING 90-ORGN2-A3-118_P&ID FOR HSD STORAGE TANK 90-0RG2N-UFD-001_UFD FOR INST.& PLANT AIR SYSTEM 90-0RG2N-UFD-002_UFD FOR TREATED WATER 90-0RG2N-UFD-003_UFD FOR THERMIC FLUID (HIGH TEMP. CIRCUIT) 90-0RG2N-UFD-004_UFD FOR THERMIC FLUID (MEDIUM TEMP. CIRCUIT) 90-0RG2N-UFD-005_UFD FOR SECONDARY HEATING SYSTEM 90-0RG2N-UFD-006_UFD FOR COLD OIL 90-0RG2N-UFD-007_UFD FOR COOLING WATER 90-0RG2N-UFD-008_UFD FOR STEAM GENERATOR"
3D MODELLING as detailed in item no. B.1
3D modelling of entire plant including packages Piping, Mechanical, Civil, Structural, Electrical, Instruments, Firefighting, HVAC, CPE, CFE & IOCL Pipelines within the new Grassroot Lube plant (Jetty to lube plant) in contractor scope using E3D software and as per below sections of Std. Technical Piping Specifications. 3D modelling Procedure : Section-17 of Std. Technical Specification for Piping. 3D modelling Review Procedure : Section-18 of Std. Technical Specification for Piping. (Note: Contractor to provide the combined 3D model of the Grassroot Lube Plant) Reference: Plot Plan , Plant Layout a. Piping (Pipe, Fittings, valves, specialities) at all levels including Pipe rack, Process plant and tank farms, Mechanical (Tanks, Pumps, Equipments, Pumps, Powder Handling systems, Screw Conveyors, Feed Hoppers & Utility Equipments) equipments at Process plant, tank farm and utility areas. b. Civil & Structural Buildings, Structures, RCC Foundation, Roads, Stair, Ladder, Gate, buildings, Pipe racks, concreate sleepers, STP, Roads, Walk ways, Horticulture works, Boundary walls, Drains, OWS, security cabin, Underground facilities and other plant facilities, etc., c. Electrical like HT/LT sub-stations, MCC room, DG set room, cable routing & trays, etc., d. Instrumentation like field mounted instruments & Valves, RIO Panels, cable routing & trays, Control room, CCTV e. HVAC (duct, fans, blower) & Fire Fighting (Spray line, etc.,) f. Process Equipments (CPE) such as vessels, equipments, pumps, Homogenizers, Colloidal Mills g. Core Filling Plant Equipments (CFE) h. ASRS, Ware house & Material Handling i. Pipelines from Jetty to Lube plant (within the new Grassroot Lube Plant) including Pig Launcher/Receivers The maximum working height to be considered for Laying of the Pipelines shall be 17.5M from GL.
"NOTE:- THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST."
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .