Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.9 L
EMD Value
₹99,276
Closing Date
12 May 2026, 3:00 pmClosed
c.e kanpur nagar nigam
c.e office kanpur nagar nigam
zone-01 ward-79 ke antaragt Birhana Road ke Pass Sthith Jacha- bacha Hospital ke second Floor ka sudhar karya.
2026_NNKAN_1146815_1
107/AA-1/2025-26
Open Tender
Civil Works
Fixed-rate
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,276
12 May 2026
8 May 2026
12 May 2026
8 May 2026
12 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Disementling of damage RCCB Work inchading stacking disemental material with in 10m disteior en all comp. | 0.54 | cum | 1,200 | ₹648 |
| 1.02 | Dinmentling of damage brick Work including stacking dismental material with in te distence exc all comp | 0.35 | sqm | 580 | ₹203 |
| 1.03 | providing and laying in coment coric Cononna 14:31 Comom fine sand and page Bench Ballotjand curing criesp inchuding cost of form work in linndation and floves etc all comp | 2.28 | cum | 5,740 | ₹13,087.2 |
| 1.04 | ECC work with coment approved sonic sand and 20mm approval notic hallast is proportais for raf Beam, column and slab 11.5.3 (1 comt 1.5 C. sand 20 mm su stone ballast) inchafing bonding bioding and sing of reinfocament in position casting cutting of wall and satisfaction of the engineer in charge including cont of all material contering etc hat excluding cost of reinforcement esc all complete including shuttring | 0.54 | cum | 8,600 | ₹4,644 |
| 1.05 | M.S or iron plain work xach reinforcement o nonforced brick week when not ictaling over enought sonnued shape soncemary including bending for proper compilitine of the work and including age bend books and authorsand noerlaping shall be measured up hes floor two level lever all rate) | 0.34 | qtl | 7,200 | ₹2,448 |
| 1.06 | M-150 class bów in foundation and plinth with 1:4 coment & finc of 1.25 inene modulous and mortar including suply of all material labour and tools and plants etc required for proper complition of the work | 2.11 | cum | 6,600 | ₹13,926 |
| 1.07 | Dismentling af damage plaster etc all comp. 12mm thick cement plaster with 1:4 coment & c.sand mortar etc all comp | 535 | sqm | 45 | ₹24,075 |
| 1.08 | Supply and foxing of 100 mm dia pvc pipe complete with rose heads MS clamps 2.5 cm x 3 mm fixed ton wall by 15 cm long 6 mm dia nail and including repair of plaster pointing etc if damaged during fixing of the pipes including cost of all material labour, tools and plant etr: requred for proper copletion of work (sch no 730, 100 mm dia pvc | 535 | sqm | 200 | ₹1,07,000 |
| 1.09 | Supply and foxing of 100 mm dia pvc pipe complete with rose heads MS clamps 2.5 cm x 3 mm fixed ton wall by 15 cm long 6 mm dia nail and including repair of plaster pointing etc if damaged during fixing of the pipes including cost of all material labour, tools and plant etr: requred for proper copletion of work (sch no 730, 100 mm dia pvc | 60 | rmt | 260 | ₹15,600 |
| 1.1 | MS. or iron in plam work such as fabrication of MS galcyrill wrought to required shape including welding grinding as required for completion of work | 1.26 | qtl | 8,000 | ₹10,080 |
stage.html
html • 0.02 MB
finance_2144759.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_2144759.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .