Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹4.7 CrAdmitted-Finance | +10.70% | ₹4.7 Cr | H1 | Admitted-Finance |
| 2 | H2₹3.8 Cr−₹87.5 L (18.7%)Admitted-Finance | -10.00% | ₹3.8 Cr−₹87.5 L (18.7%) | H2 | Admitted-Finance |
| 3 | H3₹3.6 Cr−₹1.1 Cr (23.2%)Admitted-Finance | -15.00% | ₹3.6 Cr−₹1.1 Cr (23.2%) | H3 | Admitted-Finance |
| 4 | H4₹3.6 Cr−₹1.1 Cr (23.8%)Admitted-Finance NO 24 46 4TH FLOOR AGNI BUSINESS CENTRE K B DASAN ROAD ALWARPET CHENNAI TAMIL NADU 600018 | CHENNAI | TAMIL NADU | 600018 | -15.67% | ₹3.6 Cr−₹1.1 Cr (23.8%) | H4 | Admitted-Finance |
| 5 | H5₹3.5 Cr−₹1.1 Cr (24.3%)Admitted-Finance | -16.19% | ₹3.5 Cr−₹1.1 Cr (24.3%) | H5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹8.4 L
Closing Date
3 Aug 2026, 3:00 pmClosed
Chief Engineer
Chief Engineer VOC Port Authority
Repair and Improvement works at Type III Quarters in VOC Port
2026_VOCPT_283871_1
12CE/RCMBM /2026-27/D.2312
Open Tender
Civil Works
Works
240 days
VOC Port
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹8.4 L
15 Sept 2026
13 Jul 2026
4 Aug 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out doors, wondows and ventilators etc., (wood or steel) shutters including chowkhats, architraves, holdfasts and other attachments and stacking them within a lead of 100m including all labour, tools, equipments, transport, fuel, etc., complete complying with AISS and as directed by the departmental officers. | - | NO | 202 | - |
| 2 | Dismantling and removal of Brick Masonry work (BW) in Cement Mortar above G.L. upto floor two level including stacking of serviceable materials and disposal of unserviceable materials within a lead of 100 m including all labour, tools, equipments, transport, fuel, etc., complete complying with AISS and as directed by the departmental officers. | - | CUM | 283.5 | - |
| 3 | Dismantling and removal of Reinforced Cement Concrete (RCC) above G.L. upto floor two level including stacking of serviceable materials and disposal of unserviceable materials within a lead of 100 m including all labour, tools, equipments, transport, fuel, etc., complete complying with AISS and as directed by the departmental officers. | - | CUM | 4,309 | - |
| 4 | Brick work in Cement Mortar 1:5 (M. Sand (Crushed Stone Sand)) (One cement, five M. Sand (Crushed Stone Sand)) using chamber burnt bricks for walls in all floors up to floor two level of the building including cost of all materials, labour, curing etc.,complete complying with AISS and as directed by the departmental officers. | - | CUM | 8,375 | - |
| 5 | Providing Half Brick Masonry wall using chamber burnt bricks in Cement Mortar 1:3 (M. Sand (Crushed Stone Sand)) (One cement, three M. Sand (Crushed Stone Sand)) for Partition walls etc., in all floors including cost of all materials, labour, scaffolding, etc., complete complying with AISS and as directed by the departmental officers. | - | SQM | 1,078 | - |
| 6 | Fabricating and placing in position of M.S / Tor steel grills for R.C.C works in all floors including cost of Steel, cutting, bending, binding with 16 Gauge GI Binding wire and placing in position etc., complete complying with AISS and as directed by the departmental officers. | - | MT | 89,704 | - |
| 7 | Providing Form work for Sides of soffits, beams, landings, cantilever ridges and lintels not exceeding 1 m in depth in all floors upto full height of the building and removal of the same for in situ RCC work etc., complete complying with AISS and as directed by the departmental officers. | - | SQM | 494 | - |
| 8 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (One part of cement, One and a half parts of M. Sand (Crushed Stone Sand) & Three Parts of graded stone aggregate (i.e.) 2 parts of 20mm nominal size graded metal & 1 part of 10mm nominal size graded metal) using 20 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., and excluding the cost of form work and reinforcement grills for all RCC works in all floors upto full height of the building etc., complete complying with AISS and as directed by the departmental officers. | - | CUM | 8,431 | - |
| 9 | Providing and fixing M.S.Round or Square bars with M.S. Flats at required spacings in wooden frames of windows and clerestory windows in all floors including cost of M.S. Round or Square bars, M.S. Flats and labour for finishing and applying one coat ofready mixed red oxide primer of approved quality etc., complete complying with AISS and as directed by the departmental officers. | 1,200 | KG | 108 | ₹1,29,600 |
| 10 | Supplying and fixing UPVC WINDOWS( Un-Plasticized Polyvinyl Chloride) windows of casement type (open) from the profile the size of outer frame 60mm X 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles aremulti chambered sections with wall thick of 2mm.
The EPDM rubber (black colour) covered with overall the edges of frame and shutter. The shutter will be provided with Espag multi power point locks and also it operates as
handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work. The rate including cost of all materials, labour, tools & plants, conveyance, fixing in position etc., complete and as directed by the departmental officers. | - | SQM | 7,482 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
tendoc.pdf
Tender Documents • 0.68 MB
BOQ_331166.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .