Loading…
Loading…
Tender Value
₹39.8 L
EMD Value
₹79,600
Closing Date
23 Jun 2026, 4:00 pm
ADGP Hqrs PHQ
Srinagar
Construction
2026_DGPJK_311581_1
e-NIT/EE-PCD/PHQ/23/2026-27
Open Tender
Civil Works
90 days
PCR Jammu
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
Exen PCD PHQ
₹79,600
13 Jun 2026
13 Jun 2026
24 Jun 2026
13 Jun 2026
23 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil | 77.03 | Cum | 256.85 | ₹19,785.16 | 1 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 82.99 | Cum | 5,202.9 | ₹4,31,788.67 | 2 |
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 54.38 | Cum | 5,733.6 | ₹3,11,793.17 | - | |
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing & reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge.
Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately All works above plinth level upto floor V level | 22.9 | Cum | 9,412.05 | ₹2,15,535.94 | - | |
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,519 | Kg | 123.2 | ₹3,10,340.8 | - | |
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :5 Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 42.1 | Cum | 7,571.55 | ₹3,18,762.26 | - | |
Extra for brick work with common burnt clay bricks/ cement concrete bricks in superstructure above plinth level upto floor five level | 42.1 | Cum | 1,455.65 | ₹61,282.87 | - | |
Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in Superstrcuture above plinth level upto floor V-level including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand) | 20.82 | Sqm | 1,151.15 | ₹23,966.94 | - | |
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 5.58 | Sqm | 346.7 | ₹1,934.59 | - | |
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 52.04 | Sqm | 286.35 | ₹14,901.65 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.21 MB
BOQ_1008797.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid