Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical KAURARA ROAD SIRSAGANJ FIROZABAD | SIRSAGANJ | FIROZABAD | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
Tender Value
₹30.4 L
EMD Value
₹61,000
Closing Date
11 May 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EE ICD KARWI CHITRAKOOT
Construction of Canal from km. 1.450 to 1.500 and balance pucca work of Achharaud minor.
2026_UPIDC_1141991_5
01/EE/2026-27
Open Tender
Civil Works
Item Rate
180 days
Distt Hamirpur
AS PER NIT
2 documents required · 2 mandatory
₹854
₹61,000
12 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | - | - | - | - |
| 1 | E/W excavation in foundation M.K.R. soil including initial lead and lift as per proper completion of work. | 964.79 | Cum | 119.5 | ₹1,15,292.41 |
| 2 | Earth work in filling in embankment including mechanical compaction dressing and watering with all leads and lifts and T&P etc. for proper compaction of work including all tax like income tax labour cess etc. But excluding G.S.T. | 861.5 | Cum | 265.76 | ₹2,28,952.24 |
| 3 | Supplying & Laying coarse sand in foundation with all cost of material, labour, T&P etc required for completion of work. | 15.38 | Cum | 1,841.29 | ₹28,319.04 |
| 4 | Laying C.C. 1:3:6 in foundation with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 98.51 | Cum | 4,237.22 | ₹4,17,408.54 |
| 5 | R.C.R. Stone masonry 1:4 cm with all cost of labour cement, sand, stone T&P etc required for completion of work. | 422.01 | Cum | 4,823.3 | ₹20,35,480.83 |
| 6 | Laying C.C. 1:2:4 in top of stone masonry with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 13.21 | Cum | 5,092.64 | ₹67,273.77 |
| 7 | Cement pointing 1:2 on stone masonry all cost of labour material T&P etc required for completion of work. | 354.46 | Sqm | 124.83 | ₹44,247.24 |
| 8 | Centering & Shuttering for R.C.C. work with all cost of labour material T&P etc required for completion of work. | 99.03 | Sqm | 817 | ₹80,907.51 |
| 9 | Dry stone pitching with all cost of labour material T&P etc. required for completion of work. | 10.5 | Cum | 2,626.5 | ₹27,578.25 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.46 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.79 MB
NIT01.pdf
Tender Documents • 2.78 MB
BOQ_2132885.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .