| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 CrAccepted-AOC KOTHI NO 6 CIVIL LINES OPP TB TOWER DISTRICT MORADABAD UTTAR PRADESH | MORADABAD | UTTAR PRADESH | 244001 | ₹13.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹14.7 CrAccepted-AOC | ₹14.7 Cr | L2 | Accepted-AOC L2 |
| 3 | L3₹15.0 CrRejected-Finance | ₹15.0 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹15.5 CrRejected-Finance 112 FIRST FLOOR NAVAYUG MARKET GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹15.5 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹15.8 CrRejected-Finance | ₹15.8 Cr | L5 | Rejected-Finance L5 |
Tender Value
₹22.4 Cr
EMD Value
₹33.6 L
Closing Date
27 Jan 2024, 3:00 pmClosed
SE MBD Circle PWD MBD
SE MBD Circle PWD MBD
Surface improvement work of Dalpatpur Aliganj road Major district road 174 W under IRQP scheme Chainage from 0000 to 16800
2024_CEMBD_883525_1
6088/E-Tender-MBD Circle/23-24 Dated 13-12-2023o
Open Tender
Civil Works
365 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹33.6 L
Yes
SE MBD Circle PWD MBD
17 Feb 2024
21 Jan 2024
27 Jan 2024
21 Jan 2024
27 Jan 2024
21 Jan 2024
24 Jan 2024
Amount
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. lead upto 1000 m. (As per MoRTH specification clause No. 305). Excluding Cost of GST
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Excluding Cost of GST
Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Excluding Cost of GST
Providing and laying Dense graded Bituminous Macadam (DBM-I), with 100-120 TPH HMP producing an average output of 75 tonnes per hour using crushed aggregates of Grading - (I) 37.50 mm (Nominal Size) premixed with bituminous binder (VG-30) @ 4.50 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 (A) complete in all respects. Excluding Cost of GST
Providing and laying Dense graded Bituminous Macadam (DBM-II) with 100-120 TPH HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified Grading - (II) 26.00 mm (Nominal Size) premixed with bituminous binder @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 (B) complete in all respects. Excluding Cost of GST
Providing and laying Bituminous Concrete (BC) with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of grading-II (13mm nominal size), premixed with bituminous binder VG-40 @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. Excluding Cost of GST
Excavation in fundation in ordinary soil ( Loam,clau or sand ) including lift upto 1.5M and lead upto 30M and including filling wetering and ramming of excavated earth into the trenches of into the space between the bulding and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as the directed by the Engineer-in-charge upto a distance of 30M from the foundation trenches.( Where machine can not reach/move).For Building work only.(SI No-251. Excluding Cost of GST
Consolidation of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. Excluding Cost of GST
Cement Concrete with 4cm Guage Stone ballast conarse sand and cement concrete in proportion of 1:4:8 including supply of all meterials labour and T&P etc. requried for proper competion of the work. (SI no - 281). Excluding Cost of GST
R.C.C Work with cement approved coarse sand and 2cm gauge approved stone grit in proportion of 1:2:4 in lintels of doors. Windows and sunshades excluding supply of reingrorcment and its bending but including itr fixing and binding the same with 24 B.W.G.I binding wire and including necessary centering and suttering etc. and supply of all meterials. labour and T&P etc requried for proper completion of the work Binding wire to be supplied by the contractor free of cost including making of drip coarse.(SI No-283). Excluding Cost of GST
Mild steel or iron in plain work such as reinforcment concrete or reinfocmend brick work ( when not including in an over all rates) wrought to requried shade as necessary including bending for proper completion of the work and including supply of all steel.(SI No 504). Excluding Cost of GST
Providing & Laying of 350 mm dia NP-3 Hume pipe, including cost of Hume pipe, labour & T&P etc complete but Excluding Cost of GST. as per SI. New Item-A of Chapter-1 + SI No. 1 (F) of Chapter 18.
LOHIYA DEVELOPERS
m/s m.m. construction
Shakuntlam Builtech
Iqbal construction company
M/S SOBTI INFRATECH LIMITED
M/S RUHELA CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid