Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.5 LAccepted-AOC | ₹95.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹95.8 L+₹29,432 (0.31%)Rejected-Finance D S 185 186 SECTOR D LDA COLONY KANPUR ROAD LUCKNOW LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | ₹95.8 L+₹29,432 (0.31%) | L2 | Rejected-Finance L2 |
| 3 | L3₹96.8 L+₹1.3 L (1.32%)Rejected-Finance 3 4 JEEVAN DEEP BUILDING 10 PARLIAMENT STREET NEW DELHI 1 PH 011 43573493 9899713006 | ₹96.8 L+₹1.3 L (1.32%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.0 Cr+₹8.7 L (9.09%)Rejected-Finance 189 TEACHEARS COLONY THAKUR PLOT TAJBAG NAGPUR 440024 | NAGPUR | MAHARASHTRA | 440024 | ₹1.0 Cr+₹8.7 L (9.09%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.1 Cr+₹18.2 L (19.0%)Rejected-Finance | ₹1.1 Cr+₹18.2 L (19.0%) | L5 | Rejected-Finance L5 |
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
13 Apr 2022, 6:00 pmClosed
AGM Electrical
AAI, S V Airport Raipur
Annual Operation and routine maintenance contract for 3X300TR AC Plant incl. ancillary instl. like AHU,Cooling tower etc. and CMC of Tower and Cassette ACs, split type ACs, water coolers and RO water purifier, AHUs, UVGI and AOP Cell System etc.
2022_AAI_109555_1
AAI/RPR/E-E/HVAC/22-24/ENIT-04
Open Tender
Electrical Works
Item Rate
730 days
AAI, S V Airport Raipur
as per NIT
5 documents required · 5 mandatory
₹1,120
Yes
₹2.7 L
Yes
22 Jun 2022
21 Mar 2022
18 Apr 2022
22 Mar 2022
13 Apr 2022
22 Mar 2022
22 Mar 2022 - 5 Apr 2022
Amount
Operation and daily routine maintenance of HVAC system of 3 nos. X 300TR capacity in two shift per day (16 Hrs.) including Sundays & holidays by engaging of manpower as mentioned in the tender terms & conditions. System comprising of chillers cooling towers, all pumps, Terminal building AHU's, LT Panels, Control Panels, VFD's etc. including monitoring, recording of various parameters of HVAC system as per detailed specifications, terms and conditions of agreement as required.
Operation of complete HVAC system on hourly basis for covering of additional watch hours between 22:00 Hrs. to 06:00 Hrs. on all days including Sundays & Holidays as per the instruction of Engineer - In -Charge by engaging the following manpower: Supervisor/ Highly skilled-01 no. Operator cum Technician (Skill)-01 no. Helper( Un-Skilled)-02 nos.
Job contract for comprehensive Maintenance of central HVAC System comprising of the following main components. The job includes attending to complaints, repairs/rectifications, supply & replacement of any required spares/accessories/parts consumables, rewinding works, periodic inspections, Schedule/ preventive/breakdown maintenance as per tender terms & conditions for the period of one year as required. (Excluding comprehensive maintenance contract for 3 X 300 Tr. Chillers) Air Handling Unit of different capacity including control panels /instrumentation & all other accessories of following capacity - 33 Nos. Cooling Towers complete - 3 Nos. Primary Chilled Water motor pump sets (15 HP) - 4 Nos. Secondary Chilled Water motor pump sets (40 HP) - 3 Nos. Condenser motor pump sets(30 HP) - 4 Nos. Makeup water motor pump set (3 HP) & starter panel and associated accessories-1 set VFD Drive for secondary motorpump sets-3 Nos. 2 kVA UPS (Numeric make) with Battery Bank-01 set Electrical Panel for HVAC system (All the incoming & outgoing cables are covered in the scope of work only for maintenance & fault finding. Replacement of defective cables is not covered in the scope of item)
First Year
Second Year
Annual comprehensive maintenance of single phase 1.5/2.0 TR (including star rated) split type air conditioners of different makes including stabilizer (wherever installed) of following capacity installed at different locations including providing all necessary consumables / spares & replacement of faulty compressor and carrying out complete preventive/ breakdown maintenance as required (Non Inverter Type AC- 17 Nos. + Inverter Type AC-77 Nos.)
First Year
Second Year
Annual comprehensive maintenance of water cooler so fall makes (i/c bubbler type 6 nos. Oasis make & 16 nos. Usha make normal water cooler) and upto 150/150 liters. cooling/storing capacity at different locations including providing all necessary consumables and spares including replacement of faulty compressor with original make as required.
First Year
Second Year
Annual comprehensive maintenance of industrial water purifiers(RO) of capacity 25 LPH at different locations including providing all necessary consumables and spares including replacement of Membrane(Once in a year), Carbon Filter (twice in a year) and sediment filter(every quarter) attending monthly servicing/overhauling of system, attending breakdown call as & when required, complete etc as required.
First Year
Second Year
Annual comprehensive maintenance of Industrial water purifiers at different locations including providing all necessary consumables and spares including replacement of ,Carbon Filter (twice in a year), sediment filter( every quarter), UV Lamp etc. attending monthly servicing/overhauling of system, attending breakdown call as & when required, complete etc as required. (Aqua Guard- 03 nos.)
First Year
Second Year
Annual comprehensive maintenance of domestic water purifiers at different locations including providing all necessary consumables and spares including replacement of ,Carbon Filter (twice in a year), sediment filter( every quarter), UV Lamp etc. attending monthly servicing/overhauling of system, attending breakdown call as & when required, complete etc as required. (Kent RO-01 no., Havells-01 no.)
First Year
Second Year
Annual comprehensive maintenance of three phases 3.0 Tr Tower Type split type airconditioners of different makes following capacity installed at different locations including providing of all necessary consumables and spares & replacement of faulty compressor and carrying out preventive & breakdown maintenance as required.
First Year
Second Year
Annual comprehensive maintenance of three phases 4.0 Tr Tower Type split type airconditioners of different makes following capacity installed at different locations including providing of all necessary consumables and spares & replacement of faulty compressor and carrying out preventive & breakdown maintenance as required.
First Year
Second Year
Annual comprehensive maintenance of three phases 1.5/2.0 Tr Cassette type inverter air-conditioners of different makes following capacity installed at different locations including providing of all necessary consumables and spares & replacement of faulty compressor and carrying out preventive & breakdown maintenance as required. ( to be taken up from Sept-2022)
First Year
Second Year
Annual comprehensive maintenance of three phases 4.0 Tr Cassette type inverter model air-conditioners of different makes following capacity installed at different locations including providing of all necessary consumables and spares & replacement of faulty compressor and carrying out preventive & breakdown maintenance as required.
First Year
Second Year
Dismantling of Existing single phase/three phase Split /Floor mounted Air-conditioner units (all type) complete of different rating from existing site. Before dismantling the full gas to be pump down properly and refilling of holes, plastering, finishing the walls making good the same including shifting the removed air-conditioning unit up to new location / store room as required.
First Year
Second Year
Installation testing and commissioning of Split A.C/Tower A.C(all type) of various capacity up to 4 Tones etc. including connecting the outdoor & indoor units using refrigerant pipeswith insulation (existing or new one as applicable), wiring ,leak testing of entire system, top up of refrigerant as required, minor civil works as per requirement.
Fist Year
Second Year
Annual comprehensive maintenance of Air-cooler which includes replacement of khus once in the year, including rewinding of air cooler motor, pump, pipes as required etc. Scrubbing of Air Cooler body with emery /sand paper and double coat painting including applying red oxide etc. as required and quarterly cleaning of cooler sumps but excluding watering.
First Year
Second Year
Annual Service contract for 4 x16.5 Tr capacity of Air-cooled package Air-conditioning unit of Blue star make, operated on 3 phase, 415V, 50 Hz AC which includes only sundry maintenance and weekly testing for serviceability as per terms & conditions of contract & operation of plant as & when required basis but excluding supply of spares for the period of one year.
First Year
Second Year
Job contract for comprehensive Maintenance of complete Ultra Violet Germicidal Irradiation (UVGI) system and Ultra Fresh Advanced Oxidation Plasma (AOP) Cell system technology installed in all 33 AHUs and Packaged AC. (UVGI Lamp 108W-35 Nos., 83W-26 Nos. and associated Driver-33 Nos.) (AOP Cell 26W-82 Nos. and associated Driver-37 Nos.)
First Year
Second Year
Anoop Refrigeration
SNOWMEX ENGINEERS LIMITED
M K ENTERPRISES
V Save Electronics Pvt Ltd
Lotus Air Tech Engineering Private Limited
Comfort Zone
Supertech Engineers
CIS GLOBAL INFRATECH PRIVATE LIMITED
stage.html
html • 0.07 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .