| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹8.0 L
EMD Value
₹7,995
Closing Date
5 Dec 2023, 3:00 pmClosed
Block Development Officer(BP)
BDO Office Koradachery
1.REPAIRS TO VANDAMBALAI PUM SCHOOL RCC ROOF BUILDING ONE CLASS ROOM (S/F) EAST SIDE (Campus II) 2.REPAIRS TO VANDAMBALAI PUM SCHOOL RCC ROOF BUILDING ONE CLASS ROOM (S/F) WEST SIDE (Campus II) 3.REPAIRS TO VANDAMBALAI PUM SCHOOL RCC ROOF BUILDING
2023_RDTN_394085_1
1415/2023/A3
Open Tender
Civil Works - Buildings
Item Rate
60 days
Koradachery Block
As per Tender Documents
3 documents required · 3 mandatory
₹0
₹7,995
Yes
5 Dec 2023
29 Nov 2023
5 Dec 2023
29 Nov 2023
5 Dec 2023
29 Nov 2023
Amount
1.REPAIRS TO PUM SCHOOL THREE CLASS ROOM BUILDING (E/F) CAMPUS -II
Dismantling the existing damaged plastering surface including clear away the debreases and all other charges etc complete
Plastering with Cm 1:3 mix, 10mm thick including cost and conveyance and all labour charges etc., completed
Plastering with Cm 1:5 mix, 12mm thick including cost and conveyance and all labour charges etc., completed
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement
pointing with cement mortor 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of materials to sit and all labour charges etc complete
Towards the echarges for Door and Window Reoairs including cost materials and welding charges ets complete
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Supply and Painting the wall with two coats of oil bound Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting with Bala Paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats of newly plastered wall surface with ready mixed plastic Emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting with enamel paint two coats over iron works with approved colour including cost of materils and all labour charges etc., completed
Black board Painting two coats using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Provision for Chepals rack
2.REPAIRS TO PUM SCHOOL SINGLE CLASS ROOM RCC BUILDING (S/F ) WEST SIDE CAMPAS II
Dismantling the existing damaged plastering surface including clear away the debreases and all other charges etc complete
Plastering with Cm 1:3 mix, 10mm thick including cost and conveyance and all labour charges etc., completed
Plastering with Cm 1:5 mix, 12mm thick including cost and conveyance and all labour charges etc., completed
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement
pointing with cement mortor 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of materials to sit and all labour charges etc complete
Towards the echarges for Door and Window Reoairs including cost materials and welding charges ets complete
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Painting with Bala Paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats of newly plastered wall surface with ready mixed plastic Emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting with enamel paint two coats over iron works with approved colour including cost of materils and all labour charges etc., completed
Black board Painting two coats using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Provision for Chepals rack
3.REPAIRS TO PUM SCHOOL SINGLE CLASS ROOM RCC BUILDING (S/F ) EAST SIDE CAMPUS-II
Dismantling the existing damaged plastering surface including clear away the debreases and all other charges etc complete
Plastering with Cm 1:3 mix, 10mm thick including cost and conveyance and all labour charges etc., completed
Plastering with Cm 1:5 mix, 12mm thick including cost and conveyance and all labour charges etc., completed
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
pointing with cement mortor 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of materials to sit and all labour charges etc complete
Towards the echarges for Door and Window Reoairs including cost materials and welding charges ets complete
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Painting with Bala Paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats of newly plastered wall surface with ready mixed plastic Emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting with enamel paint two coats over iron works with approved colour including cost of materils and all labour charges etc., completed
Black board Painting two coats using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Provision for Chepals rack
4.REPAIRS TO PUM SCHOOLTOILET (S/F) CAMPUS -I
Dismantling the execting damaged plastering removing away from the site including cost and conveyance and all labour charges etc., completed
Plastering with Cm 1:3 mix, 10mm thick including cost and conveyance and all labour charges etc., completed
Plastering with Cm 1:5 mix, 12mm thick including cost and conveyance and all labour charges etc., completed
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Dadooing walls with following best approved white galvanished tiles of approved quality laid in cement mortar 1:2 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement
Towards the echarges for Door and Window Reoairs including cost materials and welding charges ets complete
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Supply and Painting the wall with two coats of oil bound Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats of newly plastered wall surface with ready mixed plastic Emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting with enamel paint two coats over old iron works with approved colour including cost of materils and all labour charges etc., completed
Fabrication of supply of steel gril gate using structural steel in all aspects as directed
Supply and fixing colour coated galvanished sheet for roofing including all labour charges for fixing neccesary bolts , nuts ,screws, Jor u Bolts ets
Provision for leach pit repair ans water supply
5.REPAIRS TO PUM SCHOOLTOILET (W/F) CAMPUS -I
Dismantling the execting damaged plastering removing away from the site including cost and conveyance and all labour charges etc., completed
Plastering with Cm 1:3 mix, 10mm thick including cost and conveyance and all labour charges etc., completed
Plastering with Cm 1:5 mix, 12mm thick including cost and conveyance and all labour charges etc., completed
Towards the echarges for Door and Window Reoairs including cost materials and welding charges ets complete
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Supply and Painting the wall with two coats of oil bound Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats of newly plastered wall surface with ready mixed plastic Emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting with enamel paint two coats over old iron works with approved colour including cost of materils and all labour charges etc., completed
Fabrication of supply of steel gril gate using structural steel in all aspects as directed
Supply and fixing colour coated galvanished sheet for roofing including all labour charges for fixing neccesary bolts , nuts ,screws, Jor u Bolts ets
Provision for leach pit repair ans water supply
6.REPAIRS TO PUM SCHOOLTOILET (E/F) CAMPUS -I
Dismantling the execting damaged plastering removing away from the site including cost and conveyance and all labour charges etc., completed
Plastering with Cm 1:3 mix, 10mm thick including cost and conveyance and all labour charges etc., completed
Plastering with Cm 1:5 mix, 12mm thick including cost and conveyance and all labour charges etc., completed
Towards the echarges for Door and Window Reoairs including cost materials and welding charges ets complete
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Supply and Painting the wall with two coats of oil bound Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats of newly plastered wall surface with ready mixed plastic Emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting with enamel paint two coats over old iron works with approved colour including cost of materils and all labour charges etc., completed
Fabrication of supply of steel gril gate using structural steel in all aspects as directed
Supply and fixing colour coated galvanished sheet for roofing including all labour charges for fixing neccesary bolts , nuts ,screws, Jor u Bolts ets
Provision for leach pit repair ans water supply
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Balasubramaniyan Senthamaraikannan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .