Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.4 Cr
EMD Value
₹3.3 L
Closing Date
28 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Ashok Kumar
CE PTPS Panipat
Annual maintenance Contract for Electrical Equipments of Unit-7 and 8,PTPS,
2026_HBC_562372_1
2026B9FB8F4C 900A 43C3 B212 4AF7D21AB017713PGC
Open Tender
Civil Works
Works
730 days
CE PTPS Panipat
as per tender document
2 documents required · 2 mandatory
₹1,180
₹3.3 L
Yes
25 Nov 2026
25 Nov 2026
6 Jan 2027
25 Nov 2026
28 Dec 2026
26 Nov 2026
25 Nov 2026 - 27 Nov 2026
270 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part-A (1st year): Annual Maintenance Contract for Electrical Equipments of Unit-7 and 8, PTPS, Panipat | 12 | Per Month | - | - |
| 2 | Part-A (2nd Year): Annual Maintenance Contract for Electrical Equipments of Unit-7 and 8, PTPS, Panipat | 12 | Per Month | - | - |
| 3 | Part-B (1st year) (1.1) Opening of foundation bolts including removal and installation of motor end coupling and shifting of new as well as damaged LT motor (within plant) both sides (To and Fro) for 5.6 kW to 20 kW | 20 | No. | - | - |
| 4 | Part-B (1st year) (1.2) Opening of foundation bolts including removal and installation of motor end coupling and shifting of new as well as damaged LT motor (within plant) both sides (To and Fro) for 20.1 kW to 50 kW | 8 | No. | - | - |
| 5 | Part-B (1st year) (1.3) Opening of foundation bolts including removal and installation of motor end coupling and shifting of new as well as damaged LT motor (within plant) both sides (To and Fro) for 50.1 kW to 100 kW | 12 | No. | - | - |
| 6 | Part-B (1st year) (1.4) Opening of foundation bolts including removal and installation of motor end coupling and shifting of new as well as damaged LT motor (within plant) both sides (To and Fro) for 100.1 kW to 170 kW | 16 | No. | - | - |
| 7 | Part-B (1st year) (2.1) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 500 kW | 4 | No. | - | - |
| 8 | Part-B (1st year) (2.2) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 501 kW to 1000 kW | 2 | No. | - | - |
| 9 | Part-B (1st year) (2.3) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 1001 kW to 2000 kW | 4 | No. | - | - |
| 10 | Part-B (1st year) (2.4) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 2001 kW to 2400 kW | 2 | No. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_642480.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .