| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.5 LAccepted-AOC BEHIND BANK OF BARODA WARD NO 19 DHANPURI SHAHDOL 484114 | SHAHDOL | SHAHDOL | MADHYA PRADESH | 484114 | 1 | Accepted-AOC STOOD L1 | |
| 2 | 2₹17.0 L+₹47,200 (2.86%)Rejected-AOC 56 ARUNACHALAM MAIN ROAD AMBAL NAGAR PORUR CHENNAI TAMIL NADU 600116 | THIRUVALLUR | TAMIL NADU | 600116 | 2 | Rejected-AOC STOOD L2 | |
| 3 | 3₹17.4 L+₹84,960 (5.14%)Rejected-Finance | 3 | Rejected-Finance stood l3 | |
| 4 | Rejected-Technical | - | Rejected-Technical firm did not upload affidavit for insolvency and bankruptcy. | |
| 5 | Rejected-Technical 31 A MIDC HINGANA INDUSTRIAL AREA PARAMOUNT CONDUCTORS LTD HINGNA INDUSTRIAL AREA NAGPUR MS NAGPUR MAHARASHTRA 440016 | NAGPUR | MAHARASHTRA | 440016 | - | Rejected-Technical firm did not upload desired order copy,affidavit for insolvency and bankruptcy and license |
Tender Value
₹18.2 L
EMD Value
₹45,600
Closing Date
5 Jul 2021, 3:30 pmClosed
FLOOR-3,ADMIN BUILDING, O/o SE(P AND W),SSTPP,DON
FLOOR-3,ADMIN BUILDING, O/o SE(P AND W),SSTPP,DONGALIA
Rate contract for complete repairing /rewinding of BHEL make 100 KVA ESP transformer rectifier set of SSTPP, PH-I of 2x600 MW, SSTPP, Dongalia
2021_MPPGC_141153_1
WT-1374
Open Tender
Miscellaneous Works
Lump-sum
365 days
SSTPP
As Per NIT
18 documents required · 18 mandatory
₹1,000
Yes
₹45,600
Yes
10 Mar 2022
22 May 2021
8 Jul 2021
22 May 2021
5 Jul 2021
22 May 2021
(Decision of L-1 bidder shall be on complete package basis)
Repairing / rewinding of BHEL make 100 KVA, H.V. Transformer Rectifier Set
Replacement of complete HV winding with new electrolytic grade copper conductor as per original specification and on the basis of old copper/salvages to be retained by the firms.
Re-insulation of the complete LV winding using existing copper conductor.
Insulating support
Repairing/rewinding of ‘BHEL’ make TR sets of ESP system- i) Dismantling and reassembly of TR sets before and after repairs including cleaning of core and laminations. ii) Painting of TR set tank internally and externally. iii) Replacement of hardware such as nuts and bolts etc. iv) Drying out the core and winding under vacuum in the oven.
SHREE ABIRAMI ENGGINEERING WORKS
POWERECT INDUSTRIES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .