Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 LAccepted-AOC VILLAGEPURE GAJADHAR TIWARI TAHSIL SADAR DISTRICT SULTANPUR | SULTANPUR | ₹25.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹25.4 LRejected-Finance | ₹25.4 L | L2 | Rejected-Finance Financial bid not Qualified |
Tender Value
₹29.8 L
EMD Value
₹60,000
Closing Date
9 Feb 2026, 12:00 pmClosed
EE RED
EE RED SULTANPUR
Construction of a boundary wall for the large cow protection center in Guregaon II, block Jaisinohour
2026_REDUP_1111778_2
2348/RED/Tender File Date01/01/2026
Open Tender
Civil Works - Buildings
120 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹60,000
6 May 2026
4 Feb 2026
9 Feb 2026
4 Feb 2026
9 Feb 2026
4 Feb 2026
Boundary Wall
E/W in Excavation in foundations in ordinary soil including dressing of sides and rammings of bottom.
Providing and laying PCC 1:4:8 (1 cement : 4 fine sand : Brick ballast 40 mm. nominal size) in foundation i/c supply of all materials. Labour and T&P etc.
Class-150 brick work in 1 : 6 cement and C. sand mortar in the Foundation including necessary cutting and moulding of bricks as required and also including supply of all materials, labour and T & P etc. required for proper completion of the work.
R.C.C. work in Foundation with cement approved coarse sand and 20 mm gauge approved stone grit in the proportion of 1:1 1/2:3 i/c supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also i/c supply of all materials, labour and T & P etc.
Providing and laying RCC 1:1 1/2:3 (1 cement : 1 1/2 C. sand :3 Stone grit 20 mm. size) in Plinth bend, Top bend i/c supply of all materials. Labour and T&P etc.
Centering and Shuttering i/c strutting, propping etc. and removal of form work for Foundation, Columns, Slab etc.
Mild steel or iron in plain work shch as reinforced concrete work i/c cutting , bending.
Class-150 brick work in 1 : 4 cement and C. sand mortar in the super-structure One brick thick wall i/c supply of all materials, labour and T & P etc. required for proper completion of the work.
12mm. Thick plaster with 1:4 cement and C. sand mortar including supply of all materials, labour and T&P etc. required for proper completion of the work.
Finishing Walls with acrylic smooth exterior paint of required shed new work (two or more coat [email protected]/10sqm over and including priming coat of exterior primer applied @2.20kg@10sqm(ace Adv walmasta )Asian Berger as perspecification no13.47.1
Mild steel or iron work in heavy size and sections such as gate etc.(when not including in an overall rates)wrought to required shape as necessary for bending etc including supply of steel as required for completion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
SBD.pdf
Tender Documents • 1.54 MB
BOQ_2055992.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid