Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC CHOUDWAR MUNICIPALITY ODISHA | ₹2.6 Cr | L1 | Accepted-AOC winner |
| 2 | L2₹2.7 Cr+₹4.3 L (1.61%)Rejected-Finance AT P O PANIKOILI DIST JAJPUR 750001 | 750001 | ₹2.7 Cr+₹4.3 L (1.61%) | L2 | Rejected-Finance Loss through opening of the Financial Bid (Cover-II) |
| 3 | L3₹2.9 Cr+₹22.6 L (8.56%)Rejected-Finance AT AMBICA SAHI WARD NO 05 PO BARIPADA DIST MAYURBHA PIN 757001 | MAYURBHANJ | ODISHA | 757001 | ₹2.9 Cr+₹22.6 L (8.56%) | L3 | Rejected-Finance Loss through opening of the Financial Bid (Cover-II) |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per DTCN |
Tender Value
₹3.3 Cr
EMD Value
₹3.3 L
Closing Date
17 Feb 2026, 5:00 pmClosed
CCE, Eastern (R and B) Circle, Balasore
O/o CCE, Eastern (R and B) Circle, Balasore
Building Work
2026_EICCL_124989_11
CCEEC-16/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
Rairangpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹3.3 L
Yes
29 Jun 2026
4 Feb 2026
18 Feb 2026
4 Feb 2026
17 Feb 2026
4 Feb 2026
4 Feb 2026 - 17 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL PORTION OF WORK : -
Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. | 111.81 | Cum | 276.88 | ₹30,957.95 |
| 2 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. | 284.33 | Cum | 958.67 | ₹2,72,578.64 |
| 3 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, taxes of all materials and cost of all labours,labour cess, T&P etc complete as per the direction of the Engineer-in-charge. | 76.38 | Cum | 6,097.71 | ₹4,65,743.09 |
| 4 | 300 MM Dia 8m Long Single under reamed pile foundation with RCC M25 using 12mm size black hard granite(Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel and labour charges for cutting, bending and binding of steel. | 207 | Each | 8,888.88 | ₹18,39,998.16 |
| 5R.C.C. work of M-25 in following works using 12 mm. to 20 mm. (½” to ¾”) size (20 mm. not to exceed 25%) hard black crusher broken granite stone chips of approved quality from approved quarry including hoisting, lowering, laying and compacting concrete, watering curing, centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties, taxes of all materials with all labour,labour cess and T & P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position and as per the direction of the Engineer-in-charge. | |||||
| 6Ground Floor | |||||
| 6.01 | Pilecap | 54.32 | Cum | 7,039.6 | ₹3,82,391.07 |
| 6.02 | Column | 20.62 | Cum | 16,302.42 | ₹3,36,155.9 |
| 6.03 | Plint Beam | 26.79 | Cum | 7,909.92 | ₹2,11,906.76 |
| 6.04 | Lintel band | 5.37 | Cum | 14,702.94 | ₹78,954.79 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.77 MB
DTCN8.pdf
Tender Documents • 1.76 MB
BOQ_579235.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .