Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹61.4 L+₹2.6 L (4.47%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹62.4 L+₹3.6 L (6.15%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹65.4 L+₹6.6 L (11.2%)Admitted-Finance TEHSIL TRINTHA DISTRICT REASI 182311 JAMMU AND KASHMIR | REASI | JAMMU AND KASHMIR | 182311 | L4 | Admitted-Finance | |
| 5 | L5₹66.4 L+₹7.6 L (12.9%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TARUN ELECTRICALS L5 | V-RIDGE ENGINEERING WORKS. L6 | vijay builders L7 | sofi and sons L2 | M/S SURAJ PARTAP SINGH L4 | CEEKAY EPC PROJECTS PRIVATE LIMITED L3 | M/S JCM CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning forlaying of 11 KV line on 11 mtr long ST poles with ACSR Weasel Conductor for Creation of 2X630 KVA Sub Station at Yoga Centre Mantlai. | ||||||||||
| 1.01 | 11 mtr long ST poles (ST-410 SP56) | 34 | no. | 1,16,214.38 ₹8,90,975.78 | 1,22,060 ₹8,47,960 | 68,000 ₹9,52,000 | 1,70,000 ₹10,20,000 | 1,70,000 ₹12,92,000 | 34,000 ₹7,24,200 Lowest | 1,36,000 ₹12,58,000 |
| 1.02 | GI V-cross arm with top bracket including clamp | 300 | Kg | 5,955 ₹45,645 | 3,000 ₹37,500 Lowest | 12,000 ₹54,000 | 3,000 ₹45,000 | 1,500 ₹42,000 | 9,000 ₹39,000 | 3,000 ₹39,000 |
| 1.03 | GI channel X-arm including clamps and braces | 300 | Kg | 5,955 ₹45,645 | 3,000 ₹37,500 Lowest | 12,000 ₹54,000 | 3,000 ₹45,000 | 3,000 ₹42,000 | 9,000 ₹39,000 | 3,000 ₹39,000 |
| 1.04 | 50 mm Sq. ACSR Rabbit conductor | 2.5 | Km | 23,224.8 ₹1,78,056.75 | 5,000 ₹1,26,250 Lowest | 25,000 ₹1,75,000 | 22,500 ₹1,67,500 | 12,500 ₹1,62,500 | 20,000 ₹1,32,500 | 12,500 ₹1,50,000 |
| 1.05 | 11 KV polymeric composite pin insulator 12 kv, 5 kn, lighting impulse 75 kn postive and 80 kv negative creepage distance 320mm | 70 | no. | 2,235.8 ₹17,141.6 | 700 ₹11,200 Lowest | 3,500 ₹21,000 | 1,400 ₹17,500 | 3,500 ₹17,500 | 7,000 ₹21,000 | 700 ₹21,700 |
| 1.06 | 11 KV polymeric composite disc insulator 12 kv min falling load 45 k, lighting impulse 75 kn postive and 80 kv negative creepage distance 320mm with fitting | 12 | no. | 920.76 ₹7,059.48 | 120 ₹1,920 Lowest | 600 ₹4,800 | 600 ₹6,000 | 600 ₹6,000 | 1,200 ₹7,200 | 120 ₹6,120 |
| 1.07 | Galvanized nuts and bolts | 40 | Kg | 839.2 ₹6,433.6 | 400 ₹4,800 Lowest | 2,000 ₹8,000 | 400 ₹5,600 | 1,200 ₹5,600 | 1,200 ₹7,200 | 400 ₹5,600 |
| 1.08 | Danger plate with clapms | 34 | no. | 867.68 ₹6,651.08 | 680 ₹4,080 | 1,700 ₹6,800 | 340 ₹3,740 | 2,720 ₹7,140 | 1,020 ₹7,820 | 340 ₹2,040 Lowest |
| 1.09 | Anti climbing device with clamps | 34 | no. | 1,130.84 ₹8,670.68 | 680 ₹4,080 | 1,700 ₹13,600 | 340 ₹3,740 | 2,380 ₹6,800 | 1,020 ₹7,820 | 340 ₹2,040 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
18 Nov 2022, 4:00 pmClosed
Executive Engineer Electric Division UdhampurJPDCL
Executive Engineer Electric Division Udhampur JPDCL
Creation of 630 KVA along with HT line
2022_PDD_193865_1
ED/UDH/80 of 2022-23 dt 28-10-2022
Open Tender
Electrical Works
Turn-key
120 days
Mantali in district udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Executive Engineer Electric Division UdhampurJPDCL
₹1.5 L
20 Dec 2022
29 Oct 2022
21 Nov 2022
29 Oct 2022
18 Nov 2022
29 Oct 2022
29 Oct 2022 - 5 Nov 2022
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning forlaying of 11 KV line on 11 mtr long ST poles with ACSR Weasel Conductor for Creation of 2X630 KVA Sub Station at Yoga Centre Mantlai.
11 mtr long ST poles (ST-410 SP56)
GI V-cross arm with top bracket including clamp
GI channel X-arm including clamps and braces
50 mm Sq. ACSR Rabbit conductor
11 KV polymeric composite pin insulator 12 kv, 5 kn, lighting impulse 75 kn postive and 80 kv negative creepage distance 320mm
11 KV polymeric composite disc insulator 12 kv min falling load 45 k, lighting impulse 75 kn postive and 80 kv negative creepage distance 320mm with fitting
Galvanized nuts and bolts
Danger plate with clapms
Anti climbing device with clamps
Earthing Complete by GI Rod 20mm 2.5 mtr long through GI Strip 25X3mm
Painting of 11 mtr ST poles including crossarms/clamps with two coat of Aluminium Paint.
Cement bottoming 1:2:4 mix as per REC strandard 0.5 cum per pole
Galvanized stay set with 50*8 mm stay clamp, guy insulator(2 nos), anchor plate (200*6mm), nuts-bolts, 2 Nos turn buckets, 1.8m long, 16 mm diameter solid GS stay rod & 7/15 mm dia GI strandard wire complete.
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Creation of 2 no 630 KVA Sub Station at Yoga Centre Mantlai and 1 no. 630 kVA standby Transformer.
11/0.433kV, 3-phase Distribution Transformers 630 KVA with Bimetallic Terminal Connectors Energy Level-2, Copper wound, and with LV Cable Box having detachable Aluminium Gland plate
Gapless Surge Arrestor, 9 kV ,10 kA , LA with polymer housing, Station Type
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical
11 kV Horn Gap Fuse Set 3 Phase 200A
300 mm² (2ckt.) 1.1 kv Grade, PVC insulated stranded conductor FRLS type
9 Mtr. Long ST Pole (ST-410 SP33)
11kV Polymeric composite Disc Insulator 12kV, min. failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with fitting
GI Channel/Angle/Flat of sizes including clamps
Galvinized Nuts and Bolts.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber with RCC slab cover.
11 KV polymeric composite Pin insulator, 12kv, 5 kn, lightening impulse 75 KV Positive and 80 KV Negative, creepage distance 320mm
LT Distribution Box for 630 KVA DTR with MCCB for incomer and SFU's for outgoing Circuits.
Wedge connctors/PG Clamps
Danger plates with clamps
GI Barbed wire for Anti Climbing
Cement Bottoming 1:2:4 mix as per REC Strandards 0.5 cum per pole
Painting of ST poles 9 mtr of substation including cross arm, clamps with 1 coat of Red Oxide and 2 coat of Aluminium Paint
HT Trivector meter with CT/PT Unit (50/5)
sofi and sons
CEEKAY EPC PROJECTS PRIVATE LIMITED
M/S SURAJ PARTAP SINGH
TARUN ELECTRICALS
V-RIDGE ENGINEERING WORKS.
vijay builders
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .