Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 LAccepted-AOC | ₹19.1 L Quoted ₹19.9 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹20.6 LRejected-Finance | ₹20.6 L | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹20.8 LRejected-Finance 601 6TH FLOOR MANGOOR VALLEY NEAR GURUDWARA MANGOOR HILLL VASCO DA GAMA GOA 403 802 | SOUTH GOA | GOA | 403802 | ₹20.8 L | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹21.4 LRejected-Finance | ₹21.4 L | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹25.1 LRejected-Finance | ₹25.1 L | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | PUNEET ENTERPRISES L4 | G S CONSTRUCTIONS L5 | Ramdev Enterprises L1 | SHRI SHYAM CONSTRUCTION CO. L2 | SHIVANI ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (un-reinforced) in floors / pavings, (below or above ground level) and of any description and in any position not otherwise specifically provided for all as specified . | 15 | Cum | 165 ₹2,475 | 120 ₹1,800 | 400 ₹6,000 | 300 ₹4,500 | 500 ₹7,500 |
| 2.00 | Material & labour for 75mm thick PCC 1:3:6 type C1 using 20mm graded stone aggregate as in hard standing ,plinth protection/path etc, laid in suitable panels not exceeding 3.00 m length finished even and smooth without using extra cement with 10mm Joints filled with bituminous sealing compound of grade ‘A’/bitumen mastic filler/sealant complete all as specified and directed by Engineer-in-Charge. | 150 | Sqm | 315 ₹47,250 | 300 ₹45,000 | 250 ₹37,500 | 270 ₹40,500 | 210 ₹31,500 |
| 3.00 | Forming contraction(Dummy)joints 65mm deepx10mm wide filled with sealing compound grade 'A' complete all as specified and directed. | 5 | 10 RM | 345 ₹1,725 | 300 ₹1,500 | 400 ₹2,000 | 400 ₹2,000 | 500 ₹2,500 |
| 4.00 | Demolition of brick work built in cement mortar all as specified . | 1 | Cum | 65 ₹65 | 120 ₹120 | 400 ₹400 | 500 ₹500 | 99.5 ₹99.50 |
| 5.00 | M&L for Brick work using fly ash bricks, straight or curved on plan exc 6m mean radius built in cement mortar (1:6) complete all as specified and directed by Engineer-in-Charge. | 1.5 | Cum | 5,012 ₹7,518 | 4,500 ₹6,750 | 4,500 ₹6,750 | 5,000 ₹7,500 | 5,000 ₹7,500 |
| 6.00 | All as above but except bricks all as specified . | 0.3 | Cum | 2,099 ₹629.70 | 2,900 ₹870 | 3,000 ₹900 | 2,500 ₹750 | 2,300 ₹690 |
| 7.00 | Dismantling of floor hearth or wall tiling including cement mortar bedding ( but not backing) and rubbish off the permices. | 240 | Sqm | 5 ₹1,200 | 24 ₹5,760 | 25 ₹6,000 | 40 ₹9,600 | 17 ₹4,080 |
| 8.00 | M&L for 25mm thick PCC 1:2:4 type 'B-0' using 12.5 mm graded crushed stone aggregate complete all as specified and directed by Engineer - in - Charge. | 250 | Sqm | 189 ₹47,250 | 123 ₹30,750 | 165 ₹41,250 | 120 ₹30,000 | 150 ₹37,500 |
| 9.00 | Material and labour for Double charge vitrified coloured tiles (approved shade) of size 600mm x 600mm having thickness 8 to 9 mm premium quality having water absorption less than 0.08%, straight edge, stain free, glossy finish, square marbonite, laid as in floor, set and jointed using type-I adhesive (thick bed fixing) confirming to IS-15477:2004 and pointed in white or coloured cement to match the shade of tile including necessary cutting as per site requirement, complete all as specified and directed by Engineer-in-Charge.
Make : Johnson (Snow Flair/Albano White Plus/Albano Lemon Plus) or Techno commercial equivalent in make mentioned in Appendix 'B' | 250 | Sqm | 999 ₹2.5 L | 1,600 ₹4 L | 800 ₹2 L | 800 ₹2 L | 850 ₹2.1 L |
| 10.00 | Ditto all as above item but 10 cm high as in skirting over 10 mm cement screed bed backing ( 1:3) complete all as specified and directed by Engineer - in - Charge. | 20 | Sqm | 999 ₹19,980 | 1,600 ₹32,000 | 810 ₹16,200 | 800 ₹16,000 | 850 ₹17,000 |
Updated dates
Tender Value
₹22.6 L
EMD Value
₹45,160
Closing Date
18 Oct 2025, 6:00 pmClosed
GARRISON ENGINEER ABOHAR
GARRISON ENGINEER ABOHAR, PIN 152116, PB
SPECIAL REPAIR TO BLDG NO P-84 AND P-85 PF 11 COMP PL AT MIL STATION ABOHAR.
2025_MES_728541_2
TOKEN NO GE ABH-27/2025-26
Open Tender
Civil Works
180 days
ABOHAR MIL STN
AS PER NIT
7 documents required · 7 mandatory
₹500
GE ABOHAR
₹45,160
Yes
2 Mar 2026
26 Sept 2025
20 Oct 2025
26 Sept 2025
18 Oct 2025
4 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_820402.xls
BOQ • 0.34 MB
Tenderdoc.rar
Tender Documents • 0.84 MB
Download all tender documents and submit your bid