| 1 | Dismantling and shifting of 33KV VCB | Dismantling of 33 KV damaged and defective VCB including shifting of dismantled VCB form switch yard to storage place or store room | 1 | Job | Ritesh Kumar 228001,ELECTRICITY TRANSMISSION SUB DIVISION-II 400 KV CAMPUS PAYAGIPUR SULTANPUR | 30 |
| 2 | Modification of 33 KV VCB Foundation | Modification of 33 KV VCB foundation as per site requirement as per manufacturing drawing or as per direction of supervising Engineer and shifting of earthing and both side jumper | 1 | Job | Ritesh Kumar 228001,ELECTRICITY TRANSMISSION SUB DIVISION-II 400 KV CAMPUS PAYAGIPUR SULTANPUR | 30 |
| 3 | Erection of new 33 KV VCB | Erection of new 33 KV VCB in proper alignment and cable termination of circuit breaker as per logic for tripping and closing spring charging indication supervision circuit with proper ferruling and checking out of breaker operation from local and remote including earthing and connection of both side jumpers and works related to complete the erection work | 1 | Job | Ritesh Kumar 228001,ELECTRICITY TRANSMISSION SUB DIVISION-II 400 KV CAMPUS PAYAGIPUR SULTANPUR | 30 |
| 4 | Jumpering between equipments | Making of new jumpering between CB toTC CB to BI with twin ACSR panther conductor with the help of PG or CB clamp | 1 | Job | Ritesh Kumar 228001,ELECTRICITY TRANSMISSION SUB DIVISION-II 400 KV CAMPUS PAYAGIPUR SULTANPUR | 30 |
| 5 | | ReEarthing of 36 KV Circuit breaker by cutting bending and welding of 50x6 mm MS Flat to existing riser work includes checking of existing near connectivity to earth mat painting of existing riser earth flat earth flat with one cost of red oxide and two coat of black or bus green enamel paint of standard make after cleaning of strip angle for rust and dust | 1 | Job | Ritesh Kumar 228001,ELECTRICITY TRANSMISSION SUB DIVISION-II 400 KV CAMPUS PAYAGIPUR SULTANPUR | 30 |
| 6 | | Opening of termintion wiring from damaged breaker after writing the ferrule and tallying the ferrule with electrical drawing The work include complete identification of wiring then opening of wiring from panel and breaker end Then after reelection of new breaker the old wiring ferrule will be replaced the as per new drawing terminated for proper electrical working | 1 | Job | Ritesh Kumar 228001,ELECTRICITY TRANSMISSION SUB DIVISION-II 400 KV CAMPUS PAYAGIPUR SULTANPUR | 30 |
| 7 | Shifting Loading of 36 KV VCB | Safe loading of new 36 KV VCB at 132 KV Sub Station Kadipur on hired private vehicle with the help of Hydra The work includes shifting of VCB from storage place to loading point by manpower | 1 | No | Ritesh Kumar Transportation Of VCB On 228001,ELECTRICITY TRANSMISSION SUB DIVISION-II 400 KV CAMPUS PAYAGIPUR SULTANPUR Hired Private Vehicle | 30 |
| 8 | Transportation of VCB on hired private Vehicle | Safe Transportation of new 36 KV VCB by hired private vehicle from 132 KV Sub Station Kadipur to 132 KV Sub Station Lambhua Distance approx 20 Kms | 1 | No | Ritesh Kumar Safe Unloading And Shifting 228001,ELECTRICITY TRANSMISSION SUB DIVISION-II 400 KV CAMPUS PAYAGIPUR SULTANPUR Of VCB | 30 |
| 9 | Safe unloading and shifting of VCB | Safe unloading the new 36 KV VCB brought from 132 KV SubStation Kadipur from vehicle with the help of hydra at 132 KV Sub Station Lambhua and shifting it by manpower to 1 the designated place as per instructions of JE incharge | 1 | No | Ritesh Kumar Loading Unloadinfg And Carriage 228001,ELECTRICITY TRANSMISSION SUB DIVISION-II 400 KV CAMPUS PAYAGIPUR SULTANPUR Of CT | 30 |
| 10 | Loading Unloadinfg and carriage of CT | Loading unloading and safe Carriage of 33 KV CT 03 Nos From 132 KV Substation Gauriganj to 132 KV SS Lambhua and unloading the same | 3 | No | Ritesh Kumar 228001,ELECTRICITY TRANSMISSION SUB DIVISION-II 400 KV CAMPUS PAYAGIPUR SULTANPUR | 30 |