Tender Value
₹2.4 Cr
EMD Value
₹2.4 L
Closing Date
24 Aug 2026, 11:00 amClosed
CEO ZP KOLHAPUR
ZP KOLHAPUR
Conservation and Beautification of lake at Ambap Tal- Hatkanangale Dist - Kolhapur
2026_KOLHA_1318077_1
05/2026-27
Open Tender
Civil Works
Percentage
545 days
KOLHAPUR
See seprete attached
2 documents required · 2 mandatory
₹46,700
₹2.4 L
11 Sept 2026
30 Jul 2026
24 Aug 2026
30 Jul 2026
24 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sub Work No. 1. Desilting, Deweeding & Dewatering Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material up to a distance of 50 metres beyond the building area and stacking as directed ,including dewatering, preparing the bed for the foundation and necessary back filling with a vailable earth / murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | 657 | Cum | 450.45 | ₹2,95,945.65 |
| 2 | Excavation for foundation in Hard-rock by controlled blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres. from the building area including dewatering and backfilling with available earth soil / murum watering, ramming etc. complete. (Lift upto 1.5m) By Mechanical Means | 657 | Cum | 1,388.1 | ₹9,11,981.7 |
| 3 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 10.0 to 19.0 BHP pump etc. complete. ( prior approval of Super intending Engineer will be necessary) | 4,200 | Bhp/Hr | 234.15 | ₹9,83,430 |
| 4 | Removing wet silt from Lake bed etc. Complete as directed. | 7,884 | Cum | 31 | ₹2,44,404 |
| 5 | Conveying materials obtained from cutting including all lifts, laying in layers of 20 cm. to 30 cm. breaking clods, dressing to the required lines, curves, grade sand section, watering and compacting to not less than 97% of standard proctor density for a lead of 300m. to 500 m. inclusive, from the site of excavation to the site of deposition as directed. 25 % to Farm | 1,971 | Cum | 35.75 | ₹70,463.25 |
| 6 | 75 % to Dump Yard | 5,913 | Cum | 412.65 | ₹24,39,999.45 |
| 7 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and a like grass along roadside making the ground clean by showel and phavaras etc. complete. | 4,367.5 | Sqm | 7.35 | ₹32,101.13 |
| 8 | Subwork No. 2 - Stone Pitching Excavation for foundation in hard murum and Boulders including removing the excavated material up to distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc.complete. (Lift upto 1.50 m) By Mechanical Means | 194.4 | Cum | 264.6 | ₹51,438.24 |
| 9 | Providing selected hard murum filling including laying in layers of 15 to 20 cm with watering and compacting etc. complete. | 145.8 | Cum | 693 | ₹1,01,039.4 |
| 10 | Providing dry rubble stone pitching 23 cm (about 9 inch) thick including all material, quarry spalls, labour etc. complete. | 486 | Sqm | 433.65 | ₹2,10,753.9 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
pq.pdf
Additional Documents • 0.44 MB
NIT.pdf
Tender Documents • 1.91 MB
SBD.pdf
Other Document • 1.12 MB
BOQ_2259679.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .