Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.9 LAccepted-Finance | ₹78.9 L | L1 | Accepted-Finance Due to lowest bid price |
| 2 | L2₹79.6 L+₹72,526.52 (0.92%)Rejected-Finance | ₹79.6 L+₹72,526.52 (0.92%) | L2 | Rejected-Finance Due to high bid price |
| 3 | L3₹80.8 L+₹1.9 L (2.43%)Rejected-Finance | ₹80.8 L+₹1.9 L (2.43%) | L3 | Rejected-Finance Due to high bid price |
| 4 | L4₹85.5 L+₹6.6 L (8.33%)Rejected-Finance GHARCHE | ₹85.5 L+₹6.6 L (8.33%) | L4 | Rejected-Finance Due to high bid price |
Tender Value
₹93.0 L
EMD Value
₹1.9 L
Closing Date
14 May 2026, 12:00 pmClosed
Executive Engineer
Provincial Division PWD B and R DAC Complex Sangru
Repair/Renovation of CM Facilitation Center at Dhuri, (Phase-II) Distt. Sangrur
2026_CEPW_167595_1
Bid No 8 Dt. 04/05/2026
Open Tender
Civil Works - Buildings
Percentage
120 days
Sangrur
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
₹1.9 L
Yes
14 Jul 2026
4 May 2026
14 May 2026
4 May 2026
14 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work tile, masonry or tile lining | 33.9 | Cum | 718.49 | ₹24,356.81 |
| 2 | Dismantling concrete Cement concrete plain 1:4:8 or 1:5:10 | 2.38 | Cum | 718.49 | ₹1,710.01 |
| 3 | Removing Doors and Windows (Steel or wood) with chowkhats by making recesses in walls when the wall is not to be dismantled. | 15 | Nos | 234.93 | ₹3,523.95 |
| 4 | Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm. layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | 17.84 | Cum | 191.74 | ₹3,420.64 |
| 5 | Cement Concrete 1:8:16 with 40mm guage stone aggregate using concrete mixing volumetric type | 2.48 | Cum. | 4,048.37 | ₹10,039.96 |
| 6 | First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth. | 3.8 | Cum | 5,931.48 | ₹22,539.62 |
| 7 | First class burnt brick work laid in cement sand mortar 1:5 in first storey upto 4 metres above plinth level. | 10.41 | Cum | 6,076.86 | ₹63,260.11 |
| 8 | Scraping of Cement Plaster | 818.56 | Sqm | 37.93 | ₹31,047.98 |
| 9 | 12.5mm thick cement plaster 1:4. | 454.82 | Sqm | 207.3 | ₹94,284.19 |
| 10 | 20mm thick cement plaster 1:4. | 454.82 | Sqm | 286.19 | ₹1,30,164.94 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
SBD.pdf
Tender Documents • 19.52 MB
BOQ_340735.xls
BOQ • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .