Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.6 LAdmitted-Finance | -0.32% | ₹33.6 L | L1 | Admitted-Finance |
| 2 | L2₹33.7 LAdmitted-Finance 0 6 | SAMBHAL | UTTAR PRADESH | 242021 | -0.10% | ₹33.7 L | L2 | Admitted-Finance |
| 3 | L3₹33.7 LAdmitted-Finance | -0.02% | ₹33.7 L | L3 | Admitted-Finance |
Tender Value
₹33.7 L
EMD Value
₹3.4 L
Closing Date
17 Feb 2026, 5:00 pmClosed
Executive Officer
Nagar Palika Parishad Chandausi
Construction of Holl ,Gate and Floor in Pracheen Hanuman Mandir Hanuman Gadi Ward No. 04
2026_DOLBU_1114152_2
53/PWD/2025-26 Dated 09 02 2026
Open Tender
Civil Works - Others
60 days
Chandausi
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,894
Executive officer
₹3.4 L
17 Mar 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
Earth work in excevation in trenches for foundation in ordinary soil including 1.5m lift and 30m leadincluding etcl all complete.l
P.C.C. with 4cm. Bricks ballast & fine sand of 1.25 F:M. and cement in proportion of 8:4:1 in foundation and under floors including supply of all meterials, labour and T&P etc. required for proper completion of work.( SI 275)
Earth work in cutting or in embankment in ordinary soil by carted earth brought from 5 km distance for raising in aavadi portion i/c all labour, taxes etc. complete item.
M-100 brick work in 1:4 one part cement and 4 part fine sand mortar incl. All comp.
R.C.C in plinth band and door band with 1:1.5:3 incl. All comp.
M-100 brick work in 1:3 one part cement and 4 part fine sand mortar incl. All comp.
M.S steel in R.C.C
M.S steel in small size
12mm thick plaster in 1:3with cement and fine sand mortar incl. all comp.
Laying of 25mm thick KOTA stone of size 45x45cm and above flooring over previously prepared base with 2cm thick 1:3cement and sand mortar including filling of joints with cement mixed with pigment required for matching the shade of floor as per the direction of Engineer -in charge including cutting polishing with wax polish including supply of all materials ,labour and T&P etc. required for proper completion of the work.in chapter no 14 in new item no 2
Providing and laying vitrified floor tiles (Bell/,Kajariya, somani or other standared make) in different sizes thickness to be specified by the manufacture including grouting the joints with white cement and matching pigments etc. complete with white cement slurry jointing and polishing complete including supply of all materials, labour and T&P etc. required for proper completion of the work. (As per Chapter 14,- new item no 04)
P/L ceramic glazed wall tiles of size 300x300mmof first quality conforming to IS:15622 laid on 1:3 mortar and jointing with whitecement etc allcom
Finishing wall with water proofing .cement paint in two coat etc all comp.
Painting wall with sumousam paint in two coat etc all comp.
Painting with radymixed paint of app.brand on new steel work two or more coat etc all comp.
Supply and Fixing of Submersable including Boring and all labour and metarial etc. all complete
Add : 12 percent for electric work
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
BOQ_2066111.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid