| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Bidder found eligible |
Tender Value
₹15.1 L
EMD Value
₹30,253
Closing Date
7 May 2026, 11:00 amClosed
DSCO SBS Nagar
Opposite New Lakkar Mandi Village Garhi Kanhgoo
Earth work for excavation of trenches for laying of underground pipeline lowering and jointing of RCC pipes fixing of AVP risers at site of village Paddi Mattwali Bharoli Aur Jagtewal Distt Shaheed Bhagat Singh Nagar Punjab
2026_DOA_166077_2
DSWC/SBS/2025-2026/09
Open Tender
Pipe Laying Works
Lump-sum
District SBS Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
₹30,253
7 May 2026
30 Apr 2026
7 May 2026
30 Apr 2026
7 May 2026
30 Apr 2026
FINANCIAL BID NO.: DSWC/SBS/2025-26/09
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of RCC Pipes, fixing of AVP, risers at site of Village paddi matt wali, Bharoli, Aur, Jagtewal Distt. Shaheed Bhagat Singh Nagar, Punjab
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Name of Work :- Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 300 mm dia. RCC Pipes, fixing of AVP, risers at site of Mogha No. 10147/R Village paddi matt wali Banga, District SBS NAGAR
Sr No Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2148.12 cum 93.78 Rupees Ninty Three Rupees seventy Eight Paisa Only
2 Lowering of R.C.C. Class NP-2 Pipes Dia 300 mm in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1836 mtr 84 Rupees Eighty-four Only
3 Jointing of class N.P.2 R.C.C pipes Dia 300 mm in trenches 733 no 66 Sixty-six rupees only
4 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 18 no 75 Rupees Seventy five only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 6 no 41 Rupees Fourty one only
6 Fixing of Risers (300mm) 18 no 83 Eighty-three rupees only
7 Fixing of Alfa valves 300 mm 18 no 73 Seventy-three rupees only
8 Fixing of Air vent Pipes 6 no 73 Seventy-three rupees only
9 Fixing of Gate valves 2 no 1122.91 One thousand one hundred twenty-two rupees and ninety-one paise only
10 Carriage of Pipes 102.23 ton 162.81 One hundred sixty-two rupees and eighty-one paise
11 Cement 102 Bag 299.99 Two hundred ninety-nine rupees and ninety-nine paise
12 Sand 329.2 cft 33.83 Thirty-three rupees and eighty-three paise
13 Bajri 59 cft 34.49 Thirty-four rupees and forty-nine paise
14 Sign Board (6'x4') 1 no 3000 Three thousand rupees
15 Cover of Main Haudi 1 no 4000 Four thousand rupees
16 Nimar 57.46 kg 60 Sixty rupees
Estimate of Pump Stand
1 Earth work in Excavation 8 cum 93.78 Rupees Ninty Three Rupees seventy Eight Paisa Only
2 Cement for fixing pump stand 2 Bag 299.99 Two hundred ninety-nine rupees and ninety-nine paise
3 Sand for fixing pump stand 9 Cft 33.83 Thirty-three rupees and eighty-three paise
4 Coarse aggregate for fixing pump stand 15 cft 34.49 Thirty-four rupees and forty-nine paise
5 Labour for installation pump stand 900mm dia (double) 1 no 2079 Two thousand seventy-nine rupees
6 Cement for foundation of pump stand 1.08 Bag 299.99 Two hundred ninety-nine rupees and ninety-nine paise
7 Sand for foundation of pump stand 10.6 cft 33.83 Thirty-three rupees and eighty-three paise
8 Coarse aggregate for foundation of pump stand 21.18 cft 34.49 Thirty-four rupees and forty-nine paise
9 Labour for PCC 1:8:16 0.6 cum 1269.47 One thousand two hundred sixty-nine rupees and forty-seven paise
Total Cost for one Pump stand
LABOUR WORK TOTAL(A)
PUMP STAND WORK(B) 2 nos
Grand Total of labour work(A)+Pump stand(B)
Name of Work :- Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 200 mm dia. RCC Pipes, fixing of AVP, risers at site of Mogha No.106330/L Village Bharoli banga, District nawanshar
S. No Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1774.08 cum 93.78 Rupees Ninty Three Rupees seventy Eight Paisa Only
2 Lowering of R.C.C. Class NP-2 Pipes Dia 200 mm in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1792 mtr 48 Forty-eight rupees
3 Jointing of class N.P.2 R.C.C pipes Dia 200 mm in trenches 895 no 41 Rupees Fourty one only
4 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (200 mm) 13 no 52 Fifty-two rupees
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 7 no 41 Rupees Fourty one only
6 Fixing of Risers (200mm) 13 no 62 Sixty-two rupees
7 Fixing of Alfa valves 200 mm 13 no 52 Fifty-two rupees
8 Fixing of Air vent Pipes 7 no 73 Seventy-three rupees only
9 Fixing of Gate valves 1 no 920.9 Nine hundred twenty rupees and ninety paise
10 Carriage of Pipes 85.82 ton 162.81 One hundred sixty-two rupees and eighty-one paise
11 Cement 81 Bag 299.99 Two hundred ninety-nine rupees and ninety-nine paise
12 Sand 221.4 cft 33.83 Thirty-three rupees and eighty-three paise
13 Bajri 38.5 cft 34.49 Thirty-four rupees and forty-nine paise
14 Sign Board (6'x4') 1 no 3000 Three thousand rupees
15 Cover of Main Haudi 1 no 4000 Four thousand rupees
16 Nimar 39.02 kg 60 Sixty rupees
Estimate of Pump Stand
1 Earth work in Excavation 8 cum 93.78 Rupees Ninty Three Rupees seventy Eight Paisa Only
2 Cement for fixing pump stand 1.7 Bag 299.99 Two hundred ninety-nine rupees and ninety-nine paise
3 Sand for fixing pump stand 7 cft 33.83 Thirty-three rupees and eighty-three paise
4 Coarse aggregate for fixing pump stand 13 cft 34.49 Thirty-four rupees and forty-nine paise
5 Labour for installation pump stand 600mm dia (double) 1 no 1810 One thousand eight hundred ten rupees
6 Cement for foundation of pump stand 1.08 Bag 299.99 Two hundred ninety-nine rupees and ninety-nine paise
7 Sand for foundation of pump stand 10.6 cft 33.83 Thirty-three rupees and eighty-three paise
8 Coarse aggregate for foundation of pump stand 21.18 cft 34.49 Thirty-four rupees and forty-nine paise
9 Labour for PCC 1:8:16 0.6 cum 1269.47 One thousand two hundred sixty-nine rupees and forty-seven paise
Total Cost for one Pump stand
LABOUR WORK TOTAL(A)
PUMP STAND WORK(B) 2 nos
Grand Total of labour work(A)+Pump stand(B)
Name of Work :- Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 250 mm dia. RCC Pipes, fixing of AVP, risers at project of Common UGPS Village Aur Tehsil Aur, District SBS NAGAR
Sr No Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1806.9 cum 93.78 Rupees Ninty Three Rupees seventy Eight Paisa Only
2 Lowering of R.C.C. Class NP-2 Pipes Dia 250 mm in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1585 mtr 70 Seventy rupees
3 Jointing of class N.P.2 R.C.C pipes Dia 250 mm in trenches 786 no 50 Fifty rupees
4 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (250 mm) 25 no 62 Sixty-two rupees
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 16 no 41 Rupees Fourty one only
6 Fixing of Risers (250mm) 25 no 73 Seventy-three rupees
7 Fixing of Alfa valves 250 mm 25 no 62 Sixty-two rupees
8 Fixing of Air vent Pipes 16 no 73 Seventy-three rupees
9 End Closure 250 mm 9 no 20 Twenty rupees
10 Fixing of slant pipe 250mm 2 no 73 Seventy-three rupees
11 Fixing of pump stand Dia 600mm 4 no 905 Nine hundred five rupees
12 Cement 110 Bag 299.99 Two hundred ninety-nine rupees and ninety-nine paise
13 Sand 319.95 cft 30.05 Thirty-three rupees and five paise
14 Bajri 145 cft 31.83 Thirty-one rupees and eighty-three paise
Name of Work :- Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 300 mm dia. RCC Pipes, fixing of AVP, risers at project of Common UGPS Village Jagtewal Tehsil Balachaur, District SBS NAGAR
Sr No Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1275.3 cum 93.78 Rupees Ninty Three Rupees seventy Eight Paisa Only
2 Lowering of R.C.C. Class NP-2 Pipes Dia 300 mm in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1090 mtr 84 Rupees Eighty-four Only
3 Jointing of class N.P.2 R.C.C pipes Dia 300 mm in trenches 431 no 66 Sixty-six rupees only
4 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 23 no 75 Rupees Seventy five only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 10 no 41 Rupees Fourty one only
6 Fixing of Risers (300mm) 23 no 83 Eighty-three rupees only
7 Fixing of Alfa valves 300 mm 23 no 73 Seventy-three rupees only
8 Fixing of Air vent Pipes 10 no 73 Seventy-three rupees only
9 End Closure 300 mm 9 no 20 Twenty rupees
10 L-T Junction 7 no 83 Eighty-three rupees only
11 Cement 75 Bag 299.99 Two hundred ninety-nine rupees and ninety-nine paise
12 Sand 229.9 cft 29.34 Twenty-nine rupees and thirty-four paise
13 Bajri 95 cft 30.03 Thirty rupees and three paise
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
DNIT09Retender.pdf
Tender Documents • 1.22 MB
Financial_Bid9.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .