Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAccepted-Finance GE W COLABA MUMBAI | CHANDRAPUR | MAHARASHTRA | 441205 | L1 | Accepted-Finance Lowest one | |
| 2 | L2₹34.2 L+₹4.3 L (14.4%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹34.8 L+₹4.9 L (16.4%)Rejected-Finance | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹37.0 L+₹7.1 L (23.7%)Rejected-Finance | L4 | Rejected-Finance Other than lowest | |
| 5 | L5₹38.0 L+₹8.1 L (27.0%)Rejected-Finance | L5 | Rejected-Finance Other than lowest |
Tender Value
Refer Docs
EMD Value
₹98,940
Closing Date
12 Jun 2023, 6:00 pmClosed
GE NW NOFRA
Dr Homi Bhabha Raod New Navy Nagar Colaba Mumbai
REPAIR TO ROOF ROOF TREATMENT RAIN BEATING AND CERTAIN BR WORK FOR MD OTM ACCN UNDER CELL NO 1 UNDER AGE BR I OF GE NW NOFRA
2023_MES_583748_2
8124
Open Tender
Civil Works
Item Rate
240 days
Mumbai
Please refer tender documents
8 documents required · 8 mandatory
₹500
GE NW NOFRA
₹98,940
Yes
17 Oct 2023
15 May 2023
14 Jun 2023
15 May 2023
12 Jun 2023
29 May 2023
15 May 2023 - 22 May 2023
Amount
Taking down cement plaster, any description on brick or stone walls and ceiling including racking of joints hacking for key scrubbing down with water etc for storey as directed by Engr-in-Charge incl all necessary scaffolding etc.
M&L for 20mm thick plastering by using ready mix cement mortar in Cement mortar 1:4 in 2 coats (15 mm thick backing coat and 5 mm thick setting coat mixed with water proofing compound) on fair faces of brick work or concrete surfaces, finished even and smooth (w/o using extra cement) all as specified and directed (WPC shall be mesured and paid seperately) incl all necessary scaffolding etc.
Preparation of new plastered surfaces of walls/Ceiling and applying two coats of acrylic emulsion exterior grade (100%) over a coat of primer complete all as specified and directed incl all necessary scaffolding etc. Make : Asian Paint Ultima , Berger Paint (Weather coat all guard emulsion) , Nerolac (Excel anti peel emulsion)
Supply only integral water proofing compound
M&L for repair to Spalling of concrete, damaged surface of RCC elements like beams, columns, wall, slab by removing all loose cement plaster/concrete, dust, oil, paint, grease, waterproof coating etc, Expose fully any corroded steel in the repair area and remove all scale and corrosion deposits , Apply rust remover for rust free bars, apply Dr. fixit Epoxy zinc primer over the cleaned rebars and allow it to dry before pouring of Dr Fixit micro concrete or equivalent , appllying one coat of Dr fixit epoxy bonding agent before pouring of mix concrete, providing and laying of micro concrete at least upto 20mm thickness (average) by using the recommended water powder ratio mix the microconcrete with pan mixer as per manufacturer's instruction including watertight shuttering at any position including necessary curing and remocal of debris outside MD land complete all as specified and directed by Engineer-in-Charge. Note : (i) Rate of rust remover, Epoxy zinc primer, Epoxy bonding agent and micro concrete is included in this item. (ii) Make -Dr Fixit/Pidilite/ Asian paint/ Berger
M & L cement concrete type B1 1:2:4 using 20 mm graded stone aggregates as in coping,roof curve of masonary wall including weathering slightly rounded or chamfered angles and throating including demolition of old concrete and removal of debris outside MD land as directed including necessary form work complete all as specifed and directed.
S & F mild steel bars 10mm dia and over cut to length, bent to shape, as in reinforcement including cranking bending spirally for hooking and annealed not less than 0.9mm dia Including taking down old rusted or corrugated steel bars .
As per item No 7.00 but from 6 to 8mm dia
Preparation of old decorated surfaces of walls by scrapping old paint with steel wire brush or by any means, washing the surface throughtly and applying two coats of acrylic emulsion exterior grade (100%) over a coat of primer complete including necessary scaffolding for any position/height all as specified and directed by the Engineer- in- Charge. Note :- (a) Acrylic painting shall be done with rollers. Make -Dr Fixit/Pidilite/ Asian paint/ Berger
M&L preparation of surfaces cracks of plaster internal/external of walls, ceilings/ chajjas upto 5mm wide, remove, loose plaster/concrete by suitable tools, filling cracks with crack paste compound and apply the second coat after 10-12 hrs of application of first coat complete all as directed and specified by Engineer-in-Charge.
M&L preparation of surfaces by cutting V groove all along the crack 5mm to 10mm and above removing all loose plaster/concrete filling cracks with crack filling compound over moist surfaces by suitable tool. complete all as specified and directed by Engineer-in-Charge. Make -Dr Fixit/Pidilite/ Asian paint/ Berger as approved by GE through their authorised applicator only.
M & L for pre painted galvalume aluminium zinc coating GI based corrugated steel sheet 0.50mm thick of an colour having tensile srtength of 550 Mpa as in roof covering / cladding to wall fixed with self tapping screws at any height including necessary scaffolding complete all as specified and as directed by Engineer-in-Charge.
Dismantling wrought iron or mild steel work of any description not otherwise provided for.
S& F for Framed work such as grills, gratings, gate etc. with ends of bars welded, shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors ladders; framed balusters; walk ways; railings; framework of water tanks and similar work con- forming to Fe.290.Gde-E-165 at any height including necessary scaffolding complete all as specified and as directed by Engineer-in-Charge.
M&L for preparation of new steel surfaces over 10cm in width or girth and applying two coats of synthetic enamel paint over a coat of red oxide complete all as specified
Preparing of old/new surfaces of walls/ceiling washing the surface thoroughly, filling the cracks, creaves with crack filling compound as suggested by the manufacturers and applying two coats of Rain coat manufactured by Dr Fixit of Piddilte Industries Ltd. (shade to match the existing paint) incl necessary scaffolding for work all as specified and as directed by Engineer in Charge.
Demolition of brick work built cement mortar of any position as directed by Engr-in-Charge
M&L Brick work with subclass 'B' bricks, straight or curved on plan exc 6m mean radius built in cement mortar 1:6 complete all as specified and as directed by Engineer-in-Charge.
Taking down CI/ rain water pipes (any size or pattern) including all fittings, heaads, shoes, bends etc
S&F 160mm dia PVC (SWR) pipes single socketed,in any length with rubber ring joints, fixed in wall including GI clamps of approved shape and size approved by GE at any height, any location, any floor including necessary scaffolding complete all as specified and as directed by Engineer-in-Charge. Make : Kissan , Prince , Supreme.
S&F 160mm dia PVC (SWR) bends/shoes any radius fixed to pipe at any location/height including necessary scaffolding etc complete all as specified and as directed by Engineer-in-Charge. Make : Kissan , Prince , Supreme.
S&F 75mm dia PVC (SWR) pipes single socketed,in any length with rubber ring joints, fixed in wall including GI clamps of approved shape and size approved by GE at any height including necessary scaffolding complete all as specified and as directed by Engineer-in-Charge. Make : Kissan , Prince , Supreme.
S&F 75mm dia PVC (SWR) bends/shoes any radius fixed to pipe at any location/height including necessary scaffolding etc complete all as specified and as directed by Engineer-in-Charge. Make : Kissan , Prince , Supreme.
Providing in repairs water proofing treatment with APP (Atactic polypropylene) modified polyester(bituminous) membrane reinforced of 3.5Kg/Sqm with non woven polyester mat of weight 160 gms/sqm as center core and without multiple layers of polyethylene, finished on top and bottom with 7 micron thick flammable polyethylene applied by thermo fusion using LPG torch on the bottom portion of the membrane, after applying a coat of bituminous primer @ 0.25 Kg/Sqm over roof (An overlap of 100mm and 150mm shall be provided on sides and ends respectively) and applying two coats of bituminous aluminium paint on APP sheet incl removal of old damaged APP sheets and removing from MD land complete all as specified and as directed
S&F in repairs for Powder coated aluminium door, window and ventilator shutters, fixed type without sash bar, aluminium section weighing 0.55 kg/m including necessary joining cleats, glazing clips, rubber packing, anodised aluminium snap beading, screws etc. complete all as specified
Hacking out old broken glass (any thickness, size, quality or description) from wooden frames or stone, concrete or brick surrounds, glazed with putty or fixed with beads
S&F 5.5mm thick glass sheet ordinary quality and glazing with oil putty fixed with beads in each pane in repair
Demolition of existing treatment of any type and preparing the surface by cleaning the concrete surface with wire brush and a high pressure water jet and ensure that it is free of dust, oil grease, loose particles vegetation roots etc and filling crackswith plymer modifed mortar using smartcare RP or Epoxy mortar including Martial and labour for laying padding cement concrete in terrace 1:2:4 type B-0 (using graded stone aggregate) of 50mm average thickness maintaining 1:30 slope finishing with 10 mm thick cement mortar 1:3 as specified and directed by Engr-in-Charge. Material & labour for High performance hybrid polyurea elastomeric waterproofing spray applied SmartCare Hypertron Hybrid liquid membrane with an elongation of 600% and tensile strength of more than 13 N/mm2 as per ISO 527 type 5 , shore A Hardness of min. 85 as per ISO 868, and crack bridging ability of 3.5 mm as per ASTM C1305. The system includes final base preparation, epoxy primer application and applying SmartCare Hypertron Hybrid or approved equivalent in two coats with a consumption of 2kg/sqmt, etc., complete as per Manufacturere specifications
Taking down plaster on brick, stone or concrete surfaces etc including racking out joints hackup for key scrubbing down with water etc including rendering 20mm thick in two coats 15+5 in cement mortar 1:4 complete all as specified and directed by Engr-in-Charge SmartCare Damp Proof (External Walls) Supplying and applying single component, elastomeric, acrylic fibre reinforced waterproofing & anticarbonation coating SmartCare DampProof or or approved equivalent with minimum elongation of 220% as per ASTM D412 and shall have crack bridging ability of upto 1mm and shall resist 7 bars of hydrostatic pressure. The system consists of self priming with 33% dilution followed by two undiluited coatings but sandwiched with EPDM joint and corner tapes which has got very high elongation, etc., complete as per manufacturers specification. Consumption is 0.44ltr/sqm
Taking up or down steel /PVC tubing and connections and removing from store of following sizes, complete all as directed
(a) 80 mm bore
(b) 50 mm bore
(c) 40 mm bore
(d) 25 mm bore
Supply and fix Steel (GI) water tubing galvanised medium grade (ISI marked) of following size, with all fittings fixed complete to walls and ceiling or laid in floor/wall/ ceiling (including scaffolding) complete all as specified and directed.
(a) 80 mm bore
(b) 50 mm bore
(c) 40 mm bore
(d) 25 mm bore
Supply and fixing in repairs rotational moulded PVC tank in position at any location on top of the building including removing existing tank disconnecting all incoming and out going connections, provision of new fittings suitable up to 80mm bore GI pipe all as per existing requirements all as specified and directed. Make :Sintex ,Infra,Polycame
(a) 3000 Litres
(b) 5000 Litres
(c) 7500 Litres
SmartCare PU Injection Grout Supply & apply with nozzle PU Injection (1K) is a hydrophobic grout based on polyurethane. Upon contact with water, it reacts to form a closed cell rubber-like foam while expanding its volume up to 27 times. The cured material is of a constant volume. Since water is not a component of the foam structure, the cured material is essentially not affected by water or dryness. The reacted material does not shrink or swell. Depending on the pressure of injection, it reacts to a form a very dense material or foam.
Angrahit Services Trading Co
M/s Qureshi Construction Co
M/S V N ENTERPRISES
K.C.P ENTERPRISES
SR Construction
Nilesh Construction
NATH CONSTRUCTION
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .