| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹10.1 L+₹484 (0.05%)Rejected-AOC COIMBATORE | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | S RAJATHI L2 | ARV AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the old damaged RCC slab as per direction of departmental officers | 7 | nos | 5,071 ₹35,497 | 5,070 ₹35,490 Lowest |
| 2.00 | Desilting the existing drain etc., complete as per the direction of departmental officers | 168 | m3 | 96 ₹16,128 | 95 ₹15,960 Lowest |
| 3.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 309 | m3 | 220 ₹67,980 | 219 ₹67,671 Lowest |
| 4.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 23 | m2 | 5,962 ₹1,37,126 Lowest | 5,962 ₹1,37,126 Lowest |
| 5.00 | Centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9 x0.6m 10 gauge thick and stiffened with 3 MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m upto 4ft length including cost of nails etc., | 296 | m2 | 534 ₹1,58,064 Lowest | 534 ₹1,58,064 Lowest |
| 6.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental | 55 | m2 | 6,721 ₹3,69,655 Lowest | 6,721 ₹3,69,655 Lowest |
| 7.00 | Centering for Bed block, Lintel, Beam, Slab and Staircase slab plain surface including struttingslabs plain surface including strutting etc., complete cost and conveyanceof all materials to site and all labourcharges etc., complete. | 47 | m3 | 712 ₹33,464 Lowest | 712 ₹33,464 Lowest |
| 8.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour c | 6.5 | m2 | 9,542 ₹62,023 Lowest | 9,542 ₹62,023 Lowest |
| 9.00 | Supply and fixing of 600mm RCC manhole cover . with frame SFRC pipe IS 12592 2 | 10 | m2 | 2,701 ₹27,010 Lowest | 2,701 ₹27,010 Lowest |
| 10.00 | Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost o 7 reinforcement grill but including curing finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 6.5 | qtl | 7,812 ₹50,778 Lowest | 7,812 ₹50,778 Lowest |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
23 Dec 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of strom water drain at Teachers colony and Desilting the existing drain at EB colony and ward areas in ward no.98, South Zone.
2025_MAWS_631281_39
e61/2025
Open Tender
Civil Works
Works
90 days
Coimbatore corporation
As per tender documents
5 documents required · 5 mandatory
₹0
₹12,000
26 Mar 2026
13 Dec 2025
24 Dec 2025
13 Dec 2025
23 Dec 2025
13 Dec 2025
Amount
Dismantling the old damaged RCC slab as per direction of departmental officers
Desilting the existing drain etc., complete as per the direction of departmental officers
Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge.
Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification.
Centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9 x0.6m 10 gauge thick and stiffened with 3 MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m upto 4ft length including cost of nails etc.,
Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental
Centering for Bed block, Lintel, Beam, Slab and Staircase slab plain surface including struttingslabs plain surface including strutting etc., complete cost and conveyanceof all materials to site and all labourcharges etc., complete.
Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour c
Supply and fixing of 600mm RCC manhole cover . with frame SFRC pipe IS 12592 2
Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost o 7 reinforcement grill but including curing finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete.
Cement concrete 1:2:4 (one cement, two sand and four aggregate) using 20mm gauge hard broken granite stone jelly for all items of work excluding centering, shuttering and cost of reinforcement grill bur including curing finishing etc complete fixtures in CC works wherever necessary as directed by departmental officers including conveyance of materials
Conveyance of excavated earth including lead and lift etc., complete
S RAJATHI (BID ID -1543292)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Building.pdf
Tender Documents • 0.99 MB
ITB.pdf
Additional Documents • 0.20 MB
BOQ_756170.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .