Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NALA MOHALLA ITARSI NA NA ITARSI HOSHANGABAD MADHYA PRADESH 461111 | HOSHANGABAD | MADHYA PRADESH | 461111 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
18 Jun 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ex Engineer Jal Shakti PHE Mechanical Div Srinagar
Office of the Executive Engineer Jal Shakti (PHE) Mechanical Division, Srinagar
Rate contract for various Mechanical works at WSS Tangnar stage-1st and 2nd
2022_PHE_171146_1
PHE/MECH/e-NIT (e-12 of 05/2022)
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
365 days
Tangnar
As per NIT
2 documents required · 2 mandatory
₹300
Yes
Ex Engineer Jal Shakti PHE Mechanical Div Srinagar
₹30,000
Yes
Office of the Ex Engineer Jalshakti PHE Mech Div s
24 Jun 2022
28 May 2022
20 Jun 2022
28 May 2022
18 Jun 2022
28 May 2022
28 May 2022
365 days
Amount
Repairs/Overhauling of 13.5Cusec 3 stage VT pumping unit
Dismantling of 13.5Cusec 165M head VT pumping unit No.:-I at WSS Tangnar-II by way of disconnecting the power supply to the 1000KW, 11 KV motor and then opening the cable from cable connection boxes using necessary tools and tackles. The job further includes opening the control cabling from control cable connection box. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts ,lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and bearing housing assembly by way of opening the nuts and bolts and using special tools and tackles ,opening and removing the glands from the discharge head ,dismantling the discharge head from the base frame by way of opening the nuts and bolts connecting the discharge head with the base frame. The job further includes dismantling of the column pipes and removing the line shafts and line shaft stabilizers using heavy duty chain tongs, wrench and other tools and tackles and placing them at safe place within the pump station. Extracting the bowl assembly from the sump and dismantling the same for assessing the damages. Loading all the parts of bowl assembly, line shaft and other parts of the pumping unit in the load carrier and shifting the same to workshop and unloading for carrying the necessary repairs. All the tools and tackles, skilled labour required for carrying out the job shall be arranged by the firm. The extraction of work shall be carried by technically sound persons well versed with the mechanical works. The rate will be allowed at the rate of 2.89% per unit of the whole item
Fabrication, providing and fitting of 80 mm nominal diameter of length 05 feet head shaft fabricated out of SS-410. All the machining process like turning, threading, keyway formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 6.05% per unit of the whole item
Fabrication, providing and fitting of 80 mm nominal diameter of length 05 feets line shaft fabricated out of SS-410. All the machining process like turning, threading, key way formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 6.05% per unit of the whole item
Fabrication, providing and fitting of 80 mm nominal diameter of length 05 feet pump shaft fabricated out of SS-410. All the machining process like turning, threading, key way formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 6.05% per unit of the whole item
Repairs to the bowl assembly of the 13.5 Cusec 3 stage 165M head VT pump by way of machining the defaced/ damaged bush bearing seat of diffuser assembly on the lathe machine in order to remove the ovality to achieve the diameter as per the requirement. The rate will be allowed at the rate of 1.41% per unit of the whole item
Manufacturing, providing and fitting of new CI wearing ring/neck rings entirely as per requirement to diffuser and impeller shoulder rings. Casted out of cast iron along with making of seat and collar for fitment in the diffuser assembly and on impeller shoulders. The job involves machining of the cast on the lathe machine using precise tools and skilled labour. The bowl assembly stage shall be fixed in the chuck of lathe machine for machined internal surface using gantry mechanism ,followed by machining of neck ring both internally as well as externally to fit the bowl assembly as well as impeller shoulder. The job also includes turning of impeller on the Lathe machine to achieve the diameter as per the internal diameter of the neck ring.The rate will be allowed at the rate of 2.89% per unit of the whole item
Manufacturing, providing and fitting of new bowl bearing casted out of GM internally amalgam with rubber. The bearing shall be press fitted in the bowl part by way of turning and finishing on the lathe machine using precise tools and skilled labour.The rate will be allowed at the rate of 1.82% per unit of the whole item
Manufacturing, providing and fitting of new discharge casing bearing bush casted out of GM internally amalgam with rubber. The bearing shall be press fitted in the discharge case by way of turning and finishing on the lathe machine using precise tools and skilled labour.The rate will be allowed at the rate of 1.95% per unit of the whole item
Manufacturing, providing and fitting of bell mouth bearing bush casted out of GM internally amalgam with rubber. The bearing shall be press fitted in the bell mouth by way of turning and finishing on the lathe machine using precise tools and skilled labour.The rate will be allowed at the rate of 3.50% per unit of the whole item
Fabrication, providing and fitting of line shaft sleeve fabricated out of SS 410 . The sleeve shall be press fitted in the line shaft on the lathe machine using precise tools and skilled labour.The rate will be allowed at the rate of 1.75% per unit of the whole item
Manufacturing, providing and fitting of line shaft bearing bush casted out of bronze internally amalgam with rubber. The bearing shall be press fitted in the bearing retainer by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 1.95% per unit of the whole item
Manufacturing, providing and fitting of gland box bearing bush casted out of bronze. The bearing shall be press fitted in the gland box by way of turning and finishing on the lathe machine using precise tools and skilled labour.The rate will be allowed at the rate of 1.61% per unit of the whole item
Fabrication, providing and fitting of Gland box sleeve fabricated out of SS 410 . The sleeve shall be press fitted on the gland box on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 2.15% per unit of the whole item
Fabrication, providing and fitting of Split ring of shaft coupling. The split ring to be fabricated of SS 410 by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 0.74% per unit of the whole item
Fabrication, providing and fitting of shaft coupling. The shaft coupling to be fabricated of SS 410 by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 1.41% per unit of the whole item
Providing and fitting of Impeller Key as per sample. The rate will be allowed at the rate of 0.20% per unit of the whole item
Providing and fitting of SS impler as per sample in all respects The job includes cost on account of skilled labour required for fotment at site. The rate will be allowed at the rate of 9.42% per unit of the whole item
Assembling of the repaired 3 stage bowl assembly in the workshop. The job involves assembling of shaft in between intermediate bowl stages followed by impellers in the locking collets and fastening of studs by way of using skilled labour and special tools and tackles for the execution of the job. Shifting of the bowl assembly from workshop to site is included in the job. The rate will be allowed at the rate of 1.72% per unit of the whole item
Installation of the repaired VT pumping unit shifted from workshop to site. The job includes lowering of the bowl assembly in the sump with the help of the gantry mechanism and tools and tackles, refitting of bottom line shaft with the bowl shaft by shaft coupling. The job further includes refitting of bottom column pipe with the help of HTS fasteners, fitting of bearing retainer, fitting of interline shaft with the bottom shaft along the discharge elbow. Fitting the head shaft and top column pipe and then fitting the entire assembly with the discharge head. The job further includes servicing of bearing housing by way of draining the old M oil from the housing and washing the bearing housing with the diesel and refitting the same in the discharge head. Refilling of the bearing housing with fresh 8ltrs of M oil 40 Grade. Refitting of pump coupling with the shaft after fitting the lock nut and adjustment nut. The motor shall then be installed on the discharge head with the help gantry mechanism and connecting the HT connections at the connection boxes with proper tools and tackles after checking all the connections at panel and soft starter and then testing on full load .All the tools and tackles and skilled labour involved in the execution of the job shall be arranged by the firm. The rate will be allowed at the rate of 2.09% per unit of the whole item
Replacement of Thrust Bearing of 13.5 Cusec Pumping unit
Dismantling of 13.5Cusec 165M head VT pumping unit at WSS Tangnar-II by way of disconnecting the power supply to the 1000KW, 11 KV motor and then opening the cable from cable connection boxes using necessary tools and tackles. The job further includes opening the control cabling from control cable connection box. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts , lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and then opening the bearing housing assembly, extraction of damaged bearing from the housing using appropriate size puller and other special tools and tackles.The job includes refitting of the same after replacing the thrust bearing (Bearing not included)and finally testing the pumping unit on full load conditions. All the tools and tackles, skilled labour required for carrying out the job shall be arranged by the firm. The extraction of work shall be carried by technically sound persons well versed with the mechanical works. The rate will be allowed at the rate of 2.35% per unit of the whole item
Providing and fitting of spherical thrust roller bearing (Make: SKF/FAG 29428). The job also includes providing, filling of 9.5 litre of M. Oil of reputed make to the bearing housing. The rate will be allowed at the rate of 15.07% per unit of the whole item
Replacement of NDE/DE Bearing of 13.5 Cusec Pumping Unit
Dismantling of 13.5 Cusec 165 M head VT pumping unit at WSS Tangnar-II by way of disconnecting the power supply to the 1000KW, 11 KV motor and then opening the cable from cable connection boxes using necessary tools and tackles. The job further includes opening the control cabling from control cable connection box. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts, lifting the motor from the discharge head using overhead crane. The Job further includes opening up the shield cover of the motor in order to extract the rotor from the stator and extracting the damaged bearing from the bearing housing on driving end side. The job includes refitting of the same after replacement of the damaged bearing by new one (Bearing not Included) and applying sufficient amount of grease for ensuring smooth running on full load. The job further involves re-inserting the rotor in the stator of the motor fitting the shield cover, The motor shall then be installed on the discharge head with the help gantry mechanism and connecting the HT connections and the control wires at the connection boxes with proper tools and tackles after checking all the connections at panel and soft starter and then testing on full load .All the tools and tackles and skilled labour involved in the execution of the job shall be arranged by the firm. The rate will be allowed at the rate of 1.35% per unit of the whole item
Providing and fitting of new bearing of size NU6230C3 of SKF/FAG make. The rate will be allowed at the rate of 5.38% per unit of the whole item
Providing and fitting of new bearing of size 7324B of SKF/FAG make. The rate will be allowed at the rate of 11.44% per unit of the whole item
Repairs to 13.5cusec 165M Head VT pumping unit by way of disconnecting the electric supply to the VT motor and opening the cable from cable connection boxes using necessary tools and tackles. The job further includes opening the control cabling from control cable connection box. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts, lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and bearing housing assembly from the shaft by way of opening the nuts and bolts and using special tools and tackles. The job includes repairs to bearing housing by way of disassembling the housing and opening the nuts to remove the ratchet and open the cover for extraction of the bearing. The bearing housing shall then be drained of old M oil and washed with diesel and filled with fresh 10ltrs of M oil and providing and fitting of new washer of the bearing housing and washers of the cooling system (02 No).The job includes fitting the bearing housing in the discharge head and then fitting of cooling system including ball valve, sockets, elbow and nipples etc for cooling of the bearing. All the tools and tackles, consumables, skilled labour required for carrying out the job shall be arranged by the firm. The execution of work shall be carried by technically sound persons well versed with such works. The VT motor shall then be shifted from motor stool over the discharge head with the help of gantry mechanism. The motor and pump be connected through the coupling by tightening the coupling bolts. Reconnecting the 11KV electric supply and control cabling at the terminal boxes. Finally testing the pumping unit on full load. The rate will be allowed at the rate of 4.04% per unit of the whole item
Repairs to 13.5 cusec, 165 m head VT pumping unit by way of disconnecting the electric supply to the VT motor and opening the cable from cable connection boxes using necessary tools and tackles. The job further includes opening the control cabling from control cable connection box. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts, lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and bearing housing assembly from the shaft by way of opening the nuts and bolts and using special tools and tackles. Opening and removing the glands from the discharge head, dismantling the discharge head from the base frame by way of opening the nuts and bolts connecting the discharge head with the base frame. The job includes removing the broken and stuck bolts from threaded bolt holes (06 no’s) of the discharge head using special tools and tiles.The job includes providing and fitting of new high tensile bolts (06 no’s) in place of damaged one for fitting of gland assembly. The job also includes repairs to bearing housing by way of disassembling the housing and opening the nuts to remove the ratchet and open the cover for extraction of the bearing.The bearing housing shall then be drained of old M oil and washed with diesel and filled with fresh 10ltrs of M oil and providing and fitting of new washer of the bearing housing and washers of the cooling system (02 No).The job includes fitting the bearing housing in the discharge head and then fitting of cooling system including ball valve, sockets, elbow and nipples etc for cooling of the bearing. All the tools and tackles, consumables, skilled labour required for carrying out the job shall be arranged by the firm. The execution of work shall be carried by technically sound persons well versed with such works. The VT motor shall then be shifted from motor stool over the discharge head with the help of gantry mechanism. The motor and pump be connected through the coupling by tightening the coupling bolts. Reconnecting the 11KV electric supply and control cabling at the terminal boxes. Finally testing the pumping unit on full load. The rate will be allowed at the rate of 4.71% per unit of the whole item
Rate of Compelete job S.No 1 to 3.05
Overhauling of 11Cusec 3 stage140M head VT pumping unit at WSS Tangnar-II.
Dismantling of 11Cusec 140M head VT pumping unit at WSS Tangnar-II by way of disconnecting the power supply to the 695KW, 11 KV motor and then opening the cable from cable connection boxes using necessary tools and tackles. The job further includes opening the control cabling from control cable connection box. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts ,lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and bearing housing assembly by way of opening the nuts and bolts and using special tools and tackles ,opening and removing the glands from the discharge head ,dismantling the discharge head from the base frame by way of opening the nuts and bolts connecting the discharge head with the base frame. The job further includes dismantling of the column pipes and removing the line shafts and line shaft stabilizers using heavy duty chain tongs, wrench and other tools and tackles and placing them at safe place within the pump station. Extracting the bowl assembly from the sump and dismantling the same for assessing the damages. Loading all the parts of bowl assembly, line shaft and other parts of the pumping unit in the load carrier and shifting the same to workshop and unloading for carrying the necessary repairs. All the tools and tackles, skilled labour required for carrying out the job shall be arranged by the firm. The extraction of work shall be carried by technically sound persons well versed with the mechanical works. The rate will be allowed at the rate of 2.53% per unit of the whole item
Fabrication, providing and fitting of 80 mm nominal diameter of length 07 feet head shaft fabricated out of SS-410 along with its key. All the machining process like turning, threading, keyway formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 6.54% per unit of the whole item
Fabrication, providing and fitting of 80 mm nominal diameter of length 07 feet line shaft fabricated out of SS-410 along with its key. All the machining process like turning, threading, keyway formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 5.47% per unit of the whole item
Fabrication, providing and fitting of 80 mm nominal diameter of length 07 feet pump shaft fabricated out of SS-410 along with its key. All the machining process like turning, threading, keyway formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 6.84% per unit of the whole item
Repairs to the bowl assembly of the 11Cusec 3 stage 140M head VT pump by way of machining the defaced/ damaged bush bearing seat of diffuser assembly on the lathe machine in order to remove the ovality to achieve the dia as per the requirement. The rate will be allowed at the rate of 1.37% per unit of the whole item
Manufacturing, providing and fitting of new CI wearing ring/neck rings entirely as per requirement to diffuser and impeller shoulder rings. Casted out of cast iron along with making of seat and collar for fitment in the diffuser assembly and on impeller shoulders. The job involves machining of the cast on the lathe machine using precise tools and skilled labour. The bowl assembly stage shall be fixed in the chuck of lathe machine for machined internal surface using gantry mechanism ,followed by machining of neck ring both internally as well as externally to fit the bowl assembly as well as impeller shoulder. The job also includes turning of impeller on the Lathe machine to achieve the diameter as per the internal diameter of the neck ring. The rate will be allowed at the rate of 2.60% per unit of the whole item
Manufacturing, providing and fitting of new bowl bearing casted out of GM internally amalgam with rubber. The bearing shall be press fitted in the bowl part by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 1.64% per unit of the whole item
Manufacturing, providing and fitting of line shaft bearing casted out of bronze internally amalgam with rubber. The bearing shall be press fitted in the bearing retainer by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 1.85% per unit of the whole item
Manufacturing, providing and fitting of new discharge casing bearing bush casted out of GM internally amalgam with rubber. The bearing shall be press fitted in the discharge case by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 1.64% per unit of the whole item
Repairs to the bell mouth assembly of the 11Cusec 3 stage 140M head VT pump by way of machining the defaced/ damaged bush bearing seat of diffuser assembly on the lathe machine in order to remove the ovality to achieve the dia as per the requirement. The rate will be allowed at the rate of 1.64% per unit of the whole item
Manufacturing, providing and fitting of bell mouth bearing bush casted out of GM internally amalgam with rubber. The bearing shall be press fitted in the bell mouth by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 2.80% per unit of the whole item
Fabrication, providing and fitting of line shaft sleeve fabricated out of SS 410 .The sleeve shall be press fitted in the line shaft on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 1.64% per unit of the whole item
Fabrication, providing and fitting of line shaft coupling. The shaft coupling to be fabricated of SS 410 by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 1.37% per unit of the whole item
Fabrication, providing and fitting of bearing retainer. The bearing retainer to be fabricated of cast steel by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 0.41% per unit of the whole item
Fabrication, providing and fitting of pump shaft coupling. The pump shaft coupling to be fabricated of SS 410 by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 0.96% per unit of the whole item
Providing and fitting of Impeller Key as per sample. The rate will be allowed at the rate of 0.14% per unit of the whole item
Providing and fitting of SS impler as per sample in all respects The job includes cost on account of skilled labour required for fotment at site. The rate will be allowed at the rate of 9.57% per unit of the whole item
Assembling of the repaired 3 stage bowl assembly in the workshop. The job involves assembling of shaft in between intermediate bowl stages followed by impellers in the locking collets and fastening of studs by way of using skilled labour and special tools and tackles for the execution of the job. Shifting of the bowl assembly from workshop to site is included in the job.The rate will be allowed at the rate of 1.75% per unit of the whole item
Installation of the repaired VT pumping unit shifted from workshop to site. The job includes lowering of the bowl assembly in the sump with the help of the gantry mechanism and tools and tackles, refitting of bottom line shaft with the bowl shaft by shaft coupling. The job further includes refitting of bottom column pipe with the help of HTS fasteners, fitting of bearing retainer, fitting of interline shaft with the bottom shaft along the discharge elbow. Fitting the head shaft and top column pipe and then fitting the entire assembly with the discharge head. The job further includes servicing of bearing housing by way of draining the old M oil from the housing and washing the bearing housing with the diesel and refitting the same in the discharge head. Refilling of the bearing housing with fresh 8ltrs of M oil 40 Grade. Refitting of pump coupling with the shaft after fitting the lock nut and adjustment nut. The motor shall then be installed on the discharge head with the help gantry mechanism and connecting the HT connections at the connection boxes with proper tools and tackles after checking all the connections at panel and soft starter and then testing on full load .All the tools and tackles and skilled labour involved in the execution of the job shall b e arranged by the firm. The rate will be allowed at the rate of 1.85% per unit of the whole item
Replacement of Thrust Bearing to 11 Cusec, 140m head Pumping unit
Dismantling of 11Cusec 140M head VT pumping unit at WSS Tangnar-II by way of disconnecting the power supply to the 1000HP, 11 KV motor and then opening the cable from cable connection boxes using necessary tools and tackles. The job further includes opening the control cabling. control cable connection box. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts ,lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and then opening the bearing housing assembly, extraction of damaged bearing from the housing using appropriate size puller and other special tools and tackles.The job includes refitting of the same after replacing the thrust bearing (Bearing not included) andfinally testing the pumping unit on full load conditions. All the tools and tackles, skilled labour required for carrying out the job shall be arranged by the firm. The extraction of work shall be carried by technically sound persons well versed with the mechanical works.The rate will be allowed at the rate of 2.12% per unit of the whole item
Providing and fitting of spherical thrust roller bearing Make: SKF/FAG 29422-E.The job also includes filling of 9 litre of M. Oil in the bearing housing. The rate will be allowed at the rate of 11.62% per unit of the whole item
Providing and fitting of roller bearing SKF/FAG 16026. The rate will be allowed at the rate of 2.60% per unit of the whole item
Replacement of DE/NDE Bearing of 11 Cusec Pumping Unit
Dismantling of 11 Cusec 140M head VT pumping unit at WSS Tangnar-II by way of disconnecting the power supply to the 1000HP, 11 KV motor and then opening the cable from cable connection boxes using necessary tools and tackles. The job further includes opening the control cabling from control cable connection box. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts ,lifting the motor from the discharge head using overhead crane.The Job further includes opening up the shield cover of the motor in order to extract the rotor from the stator and extracting the damaged bearing from the bearing housing on driving end side. The job includes refitting of the same after replacement of the damaged bearing by new one (Bearing not Included) and applying sufficient amount of grease for ensuring smooth running on full load. The job further involves re-inserting the rotor in the stator of the motor fitting the shield cover, The motor shall then be installed on the discharge head with the help gantry mechanism and connecting the HT connections and the control wires at the connection boxes with proper tools and tackles after checking all the connections at panel and soft starter and then testing on full load .All the tools and tackles and skilled labour involved in the execution of the job shall be arranged by the firm. The rate will be allowed at the rate of 1.37% per unit of the whole item
Providing and fitting of new bearing of size 7230B of SKF/FAG make The rate will be allowed at the rate of 10.26% per unit of the whole item
Providing and fitting of new bearing of size 6230C3 of SKF/FAG make. The rate will be allowed at the rate of 5.47% per unit of the whole item
Providing and fitting of new bearing of size 6226C3 of SKF/FAG make. The rate will be allowed at the rate of 4.79% per unit of the whole item
Repairs to 11cusec 165M Head VT pumping unit by way of disconnecting the electric supply to the VT motor and opening the cable from cable connection boxes using necessary tools and tackles. The job further includes opening the control cabling from control cable connection box. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts, lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and bearing housing assembly from the shaft by way of opening the nuts and bolts and using special tools and tackles. The job includes repairs to bearing housing by way of disassembling the housing and opening the nuts to remove the ratchet and open the cover for extraction of the bearing. The bearing housing shall then be drained of old M oil and washed with diesel and filled with fresh 10ltrs of M oil and providing and fitting of new washer of the bearing housing and washers of the cooling system (02 No).The job includes fitting the bearing housing in the discharge head and then fitting of cooling system including ball valve, sockets, elbow and nipples etc for cooling of the bearing. All the tools and tackles, consumables, skilled labour required for carrying out the job shall be arranged by the firm. The execution of work shall be carried by technically sound persons well versed with such works. The VT motor shall then be shifted from motor stool over the discharge head with the help of gantry mechanism. The motor and pump be connected through the coupling by tightening the coupling bolts. Reconnecting the 11KV electric supply and control cabling at the terminal boxes. Finally testing the pumping unit on full load. The rate will be allowed at the rate of 4.10% per unit of the whole item
Repairs to 11 cusec, 140 m head VT pumping unit by way of disconnecting the electric supply to the VT motor and opening the cable from cable connection boxes using necessary tools and tackles. The job further includes opening the control cabling from control cable connection box. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts, lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and bearing housing assembly from the shaft by way of opening the nuts and bolts and using special tools and tackles. Opening and removing the glands from the discharge head, dismantling the discharge head from the base frame by way of opening the nuts and bolts connecting the discharge head with the base frame. The job includes removing the broken and stuck bolts from threaded bolt holes (06 no’s) of the discharge head using special tools and tiles. The job includes providing and fitting of new high tensile bolts (06 no’s) in place of damaged one for fitting of gland assembly. The job also includes repairs to bearing housing by way of disassembling the housing and opening the nuts to remove the ratchet and open the cover for extraction of the bearing. The bearing housing shall then be drained of old M oil and washed with diesel and filled with fresh 10ltrs of M oil and providing and fitting of new washer of the bearing housing and washers of the cooling system (02 No).The job includes fitting the bearing housing in the discharge head and then fitting of cooling system including ball valve, sockets, elbow and nipples etc for cooling of the bearing .All the tools and tackles, consumables, skilled labour required for carrying out the job shall be arranged by the firm. The execution of work shall be carried by technically sound persons well versed with such works. The VT motor shall then be shifted from motor stool over the discharge head with the help of gantry mechanism. The motor and pump be connected through the coupling by tightening the coupling bolts. Reconnecting the 11KV electric supply and control cabling at the terminal boxes. Finally testing the pumping unit on full load. The rate will be allowed at the rate of 4.79% per unit of the whole item
Rate of Compelete job S.No 4 to 6.06
Overhauling of 11Cusec single stage VT pumping unit
Dismantling of 11Cusec VT pumping unit at WSS Tangnar-I by way of disconnecting the power supply to the 80 HP, 380V motor and then opening the cable from cable connection boxes using necessary tools and tackles. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts, lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and bearing housing assembly by way of opening the nuts and bolts and using special tools and tackles ,opening and removing the glands from the discharge head ,dismantling the discharge head from the base frame by way of opening the nuts and bolts connecting the discharge head with the base frame. The job further includes dismantling of the column pipes and removing the line shafts and line shaft stabilizers using heavy duty chain tongs, wrench and other tools and tackles and placing them at safe place within the pump station. Extracting the bowl assembly from the sump and dismantling the same for assessing the damages. Loading all the parts of bowl assembly, line shaft and other parts of the pumping unit in the load carrier and shifting the same to workshop and unloading for carrying the necessary repairs. All the tools and tackles, skilled labour required for carrying out the job shall be arranged by the firm. The extraction of work shall be carried by technically sound persons well versed with the mechanical works. The rate will be allowed at the rate of 3.63% per unit of the whole item
Repairs to the bowl assembly of the 11 Cusec single stage VT pump by way of machining the defaced/ damaged bush bearing seat of diffuser assembly on the lathe machine in order to remove the ovality to achieve the dia as per the requirement. The rate will be allowed at the rate of 2.14% per unit of the whole item
Fabrication, Providing and fitting of combined sleeve and nut single stage pump. The material of construction of the combined sleeve and nut shall be SS410. The rate will be allowed at the rate of 5.02% per unit of the whole item
Fabrication, Providing and fitting of neck ring (NDE) along with counter sunk bolts .The material of construction of the Neck Ring IS: 318 GR-LTB5. The rate will be allowed at the rate of 4.91% per unit of the whole item
Fabrication, Providing and fitting of neck ring (DE) along with counter sunk bolts.The material of construction of the Neck Ring IS: 318 GR-LTB5. The rate will be allowed at the rate of 5.02% per unit of the whole item
Manufacturing, providing and fitting of new pump bearing bush (top) casted out of leaded GM internally amalgam with rubber. The bearing shall be press fitted in the bowl part by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 3.31% per unit of the whole item
Manufacturing, providing and fitting of new pump bearing sleeve. The pump bearing sleeve to be fabricated out of SS-410 and shall be press fitted in the discharge case by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 2.67% per unit of the whole item
Manufacturing, providing and fitting of bell mouth bearing bush casted out of leaded GM internally amalgam with rubber. The bearing shall be press fitted in the bell mouth by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 3.63% per unit of the whole item
Manufacturing, providing and fitting of intermediate bearing sleeves fabricated out of SS410 as per sample. The rate will be allowed at the rate of 1.07% per unit of the whole item
Providing and fitting of intermediate bearing bush made out of cutless rubber as per sample. The rate will be allowed at the rate of 0.53% per unit of the whole item
Providing and fitting of pump bearing bush (bottom) fabricated out of leaded gunmetal bronze (LG2) as per sample. The rate will be allowed at the rate of 2.24% per unit of the whole item
Manufacturing, providing and fitting of gland fabricated out of cast iron as per sample. The rate will be allowed at the rate of 0.85% per unit of the whole item
Manufacturing, providing and fitting of gland sleeves fabricated out of SS410 as per sample. The rate will be allowed at the rate of 2.03% per unit of the whole item
Fabrication, providing and fitting of 50 mm nominal diameter of length 1200mm head shaft fabricated out of SS-410 along with its key. All the machining process like turning, threading, keyway formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 10.26% per unit of the whole item.
Fabrication, providing and fitting of 50 mm nominal diameter of length 2000mm feet line shaft shaft fabricated out of SS-410 along with its key. All the machining process like turning, threading, keyway formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 8.55% per unit of the whole item
Fabrication, providing and fitting of 50 mm nominal diameter of length 1000 mm line shaft shaft fabricated out of SS-410 along with its key. All th01e machining process like turning, threading, keyway formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 4.27% per unit of the whole item
Fabrication, providing and fitting of 50 mm nominal diameter of length1800mm feet pump shaft fabricated out of SS-410 along with its key. All the machining process like turning, threading, keyway formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 9.62% per unit of the whole item
Assembling of the repaired bowl assembly in the workshop. The job involves assembling of shaft in between intermediate bowl part followed by impeller in the locking collet and fastening of studs by way of using skilled labour and special tools and tackles for the execution of the job. Shifting of the bowl assembly from workshop to site is included in the job. The rate will be allowed at the rate of 1.82% per unit of the whole item
Installation of the repaired VT pumping unit shifted from workshop to site. The job includes lowering of the bowl assembly in the sump with the help of the gantry mechanism and tools and tackles, refitting of bottom line shaft with the bowl shaft by shaft coupling. The job further includes refitting of bottom column pipe with the help of HTS fasteners, fitting of bearing retainer, fitting of interline shaft with the bottom shaft along the discharge elbow. Fitting the head shaft and top column pipe and then fitting the entire assembly with the discharge head. The job further includes servicing of bearing housing by way of draining the old M oil from the housing and washing the bearing housing with the diesel and refitting the same in the discharge head. Refilling of the bearing housing with fresh 8ltrs of M oil 40 Grade. Refitting of pump coupling with the shaft after fitting the lock nut and adjustment nut. The motor shall then be installed on the discharge head with the help gantry mechanism and connecting the power connections at the connection boxes with proper tools and tackles after checking all the connections at panel and soft starter and then testing on full load .All the tools and tackles and skilled labour involved in the execution of the job shall b e arranged by the firm. The rate will be allowed at the rate of 3.31% per unit of the whole item
Replacement of Thrust Bearing
Dismantling of 11Cusec VT pumping unit at WSS Tangnar-I by way of disconnecting the power supply to the 80HP motor and then opening the cable from cable connection boxes using necessary tools and tackles. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts ,lifting the motor from the discharge head using overhead crane and place it at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and then opening the bearing housing assembly, extraction of damaged bearing from the housing using appropriate size puller and other special tools and tackles.The job includes refitting of the same after replacing the thrust bearing (Bearing not included) and refitting of pump coupling with the shaft after fitting the lock nut and adjustment nut. The motor shall then be installed on the discharge head with the help gantry mechanism and connecting the power connections at the connection boxes with proper tools and tackles finally testing the pumping unit on full load conditions. All the tools and tackles, skilled labour required for carrying out the job shall be arranged by the firm. The rate will be allowed at the rate of 1.82% per unit of the whole item
Providing and fitting of spherical thrust roller bearing 29318-E SKF/FAG including filling of 06 litre of M. Oil in the bearing housing, The rate will be allowed at the rate of 7.48% per unit of the whole item
Replacement of DE/NDE Bearing of 80HP
Dismantling of 80 HP vertical motor by way of disconnecting the power supply to the motor and then extracting the cable from cable connection boxes using necessary tools and tackles. The job includes opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by way of opening the coupling bolts ,lifting the motor from the discharge head using overhead crane ,opening up the shield cover/Cooling fan of the motor in order to extract the rotor from the stator and extracting the damaged bearing from the bearing housing on DE/NDE side. The job includes refitting of the same after replacement of the damaged bearing by new one (Bearing not Included) and applying sufficient amount of grease for ensuring smooth running on full load. The job further involves re-inserting the rotor in the stator of the motor fitting the shield cover and the motor shall then be installed on the discharge head with the help gantry mechanism and connecting the connections at the connection box and testing the system on full load. All the tools and tackles and skilled labour involved in the execution of the job shall be arranged by the firm. The rate will be allowed at the rate of 1.71% per unit of the whole item
Providing and fitting of new bearing of size NU-319 C3 of SKF/FAG make The rate will be allowed at the rate of 5.77% per unit of the whole item
Providing and fitting of new bearing of size 6319 C3 of SKF/FAG make The rate will be allowed at the rate of 2.99% per unit of the whole item
Repairs to 11 cusec VT pumping unit by way of disconnecting the electric supply to the VT motor and opening the cable from cable connection boxes using necessary tools and tackles. The job further includes opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts, lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and bearing housing assembly from the shaft by way of opening the nuts and bolts and using special tools and tackles. The job includes repairs to bearing housing by way of disassembling the housing and opening the nuts to remove the ratchet and open the cover for extraction of the bearing. The bearing housing shall then be drained of old M oil and washed with diesel and filled with fresh 7 ltrs of M oil and providing and fitting of new washer of the bearing housing and washers of the cooling system (02 No).The job includes fitting the bearing housing in the discharge head and then fitting of cooling system of the bearing. All the tools and tackles, consumables, skilled labour required for carrying out the job shall be arranged by the firm. The execution of work shall be carried by technically sound persons well versed with such works. The VT motor shall then be shifted from motor stool over the discharge head with the help of gantry mechanism. The motor and pump be connected through the coupling by tightening the coupling bolts. Reconnecting the electric supply and control cabling at the terminal boxes. Finally testing the pumping unit on full load. The rate will be allowed at the rate of 5.34% per unit of the whole item
Rate of Compelete job From S No. 7 to 9.04
Repairs/Overhauling of 22Cusec single stage VT pumping unit
Dismantling of 22 Cusec VT pumping unit at WSS Tangnar-I by way of disconnecting the power supply to the 160Kw, 380V motor and then opening the cable from cable connection boxes using necessary tools and tackles. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts, lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and bearing housing assembly by way of opening the nuts and bolts and using special tools and tackles, opening and removing the glands from the discharge head ,dismantling the discharge head from the base frame by way of opening the nuts and bolts connecting the discharge head with the base frame. The job further includes dismantling of the column pipes and removing the line shafts and line shaft stabilizers using heavy duty chain tongs, wrench and other tools and tackles and placing them at safe place within the pump station. Extracting the bowl assembly from the sump and dismantling the same for assessing the damages. Loading all the parts of bowl assembly, line shaft and other parts of the pumping unit in the load carrier and shifting the same to workshop and unloading for carrying the necessary repairs. All the tools and tackles, skilled labour required for carrying out the job shall be arranged by the firm. The extraction of work shall be carried by technically sound persons well versed with the mechanical works. The rate will be allowed at the rate of 4.08% per unit of the whole item
Repairs to the bowl assembly of the 22 Cusec single stage VT pump by way of machining the defaced/ damaged bush bearing seat of diffuser assembly on the lathe machine in order to remove the ovality to achieve the dia as per the requirement. The rate will be allowed at the rate of 3.04% per unit of the whole item
Fabrication, Providing and fitting of combined sleeve and nut part no. 2114 of 20VMF single stage pump. The material of construction of the combined sleeve and nut shall be SS410. The rate will be allowed at the rate of 5.22% per unit of the whole item
Fabrication, Providing and fitting of neck ring (NDE) .The material of construction of the Neck Ring IS: 318 GR-LTB5. The rate will be allowed at the rate of 5.22% per unit of the whole item
Fabrication, Providing and fitting of neck ring (DE).The material of construction of the Neck Ring IS:318 GR-LTB5. The rate will be allowed at the rate of 5.22% per unit of the whole item
Manufacturing, providing and fitting of new pump bearing bush (top) casted out of leaded GM internally amalgam with rubber. The bearing shall be press fitted in the bowl part by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 3.70% per unit of the whole item
Manufacturing, providing and fitting of new pump bearing sleeve. The pump bearing sleeve to be fabricated out of SS-410 and shall be press fitted in the discharge case by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 2.94% per unit of the whole item
Manufacturing, providing and fitting of bell mouth bearing bush casted out of leaded GM internally amalgam with rubber. The bearing shall be press fitted in the bell mouth by way of turning and finishing on the lathe machine using precise tools and skilled labour. The rate will be allowed at the rate of 4.18% per unit of the whole item
Manufacturing, providing and fitting of intermediate bearing sleeves fabricated out of SS410 as per sample The rate will be allowed at the rate of 1.14% per unit of the whole item
Providing and fitting of intermediate bearing bush made out of cutless rubber as per sample The rate will be allowed at the rate of 0.47% per unit of the whole item
Providing and fitting of pump bearing bush (bottom) fabricated out of leaded gunmetal bronze (LG2) as per sample The rate will be allowed at the rate of 1.99% per unit of the whole item
Manufacturing, providing and fitting of gland fabricated out of cast iron as per sample. The rate will be allowed at the rate of 0.76% per unit of the whole item
Manufacturing, providing and fitting of gland sleeves fabricated out of SS410 as per sample. The rate will be allowed at the rate of 1.80% per unit of the whole item
Fabrication, providing and fitting of 50 mm nominal diameter of length 1200mm head shaft fabricated out of SS-410 along with its key. All the machining process like turning, threading, keyway formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 10.45% per unit of the whole item
Fabrication, providing and fitting of 50 mm nominal diameter of length 2000mm feet line shaft shaft fabricated out of SS-410 along with its key. All th01e machining process like turning, threading, keyway formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 8.55% per unit of the whole item
Fabrication, providing and fitting of 50 mm nominal diameter of length 1000 mm line shaft shaft fabricated out of SS-410 along with its key. All th01e machining process like turning, threading, keyway formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 4.18% per unit of the whole item
Fabrication, providing and fitting of 50 mm nominal diameter of length1800mm feet pump shaft fabricated out of SS-410 along with its key. All the machining process like turning, threading, keyway formation is to be carried out as per the sample (damaged shaft). The rate will be allowed at the rate of 9.50% per unit of the whole item
Assembling of the repaired bowl assembly in the workshop. The job involves assembling of shaft in between intermediate bowl part followed by impeller in the locking collet and fastening of studs by way of using skilled labour and special tools and tackles for the execution of the job. Shifting of the bowl assembly from workshop to site is included in the job The rate will be allowed at the rate of 1.61% per unit of the whole item
Installation of the repaired VT pumping unit shifted from workshop to site. The job includes lowering of the bowl assembly in the sump with the help of the gantry mechanism and tools and tackles, refitting of bottom line shaft with the bowl shaft by shaft coupling. The job further includes refitting of bottom column pipe with the help of HTS fasteners, fitting of bearing retainer, fitting of interline shaft with the bottom shaft along the discharge elbow. Fitting the head shaft and top column pipe and then fitting the entire assembly with the discharge head. The job further includes servicing of bearing housing by way of draining the old M oil from the housing and washing the bearing housing with the diesel and refitting the same in the discharge head. Refilling of the bearing housing with fresh 8ltrs of M oil 40 Grade. Refitting of pump coupling with the shaft after fitting the lock nut and adjustment nut. The motor shall then be installed on the discharge head with the help gantry mechanism and connecting the power connections at the connection boxes with proper tools and tackles after checking all the connections at panel and soft starter and then testing on full load .All the tools and tackles and skilled labour involved in the execution of the job shall be arranged by the firm. The rate will be allowed at the rate of 3.13% per unit of the whole item
Replacement of Thrust Bearing
Dismantling of 22 Cusec VT pumping unit at WSS Tangnar-I by way of disconnecting the power supply to the 220HP motor and then opening the cable from cable connection boxes using necessary tools and tackles. The job includes disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts ,lifting the motor from the discharge head using overhead crane and place it at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and then opening the bearing housing assembly, extraction of damaged bearing from the housing using appropriate size puller and other special tools and tackles.The job includes refitting of the same after replacing the thrust bearing (Bearing not included) and refitting of pump coupling with the shaft after fitting the lock nut and adjustment nut. The motor shall then be installed on the discharge head with the help gantry mechanism and connecting the power connections at the connection boxes with proper tools and tackles finally testing the pumping unit on full load conditions. All the tools and tackles, skilled labour required for carrying out the job shall be arranged by the firm. The rate will be allowed at the rate of 1.61% per unit of the whole item
Providing and fitting of spherical thrust roller bearing 29318-E SKF/FAG& also includes filling of 6 litre of M. Oil in the bearing housing, The rate will be allowed at the rate of 6.65% per unit of the whole item
Replacement of DE/NDE Bearing of 220HP/160KW
Dismantling of 220 HP/160KW vertical motor by way of disconnecting the power supply to the motor and then extracting the cable from cable connection boxes using necessary tools and tackles. The job includes opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by way of opening the coupling bolts ,lifting the motor from the discharge head using overhead crane ,opening up the shield cover/Cooling fan of the motor in order to extract the rotor from the stator and extracting the damaged bearing from the bearing housing on DE/NDE side. The job includes refitting of the same after replacement of the damaged bearing by new one (Bearing not Included) and applying sufficient amount of grease for ensuring smooth running on full load. The job further involves re-inserting the rotor in the stator of the motor fitting the shield cover and the motor shall then be installed on the discharge head with the help gantry mechanism and connecting the connections at the connection box and testing the system on full load. All the tools and tackles and skilled labour involved in the execution of the job shall be arranged by the firm. The rate will be allowed at the rate of 1.61% per unit of the whole item
Providing and fitting of new bearing of size 6322C3 of SKF/FAG make The rate will be allowed at the rate of 5.03% per unit of the whole item
Providing and fitting of new bearing of size 6316C3 of SKF/FAG make The rate will be allowed at the rate of 3.13% per unit of the whole item
Repairs to 22 cusec VT pumping unit by way of disconnecting the electric supply to the VT motor and opening the cable from cable connection boxes using necessary tools and tackles. The job further includes opening the nuts and bolts of the motor so as to disengage it from the discharge head, disengaging the motor from pump, by opening the coupling bolts, lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. The job further includes extracting the coupling connected to pump using appropriate size puller and other tools and tackles, disassembling and removing the ratchet plate and bearing housing assembly from the shaft by way of opening the nuts and bolts and using special tools and tackles. The job includes repairs to bearing housing by way of disassembling the housing and opening the nuts to remove the ratchet and open the cover for extraction of the bearing. The bearing housing shall then be drained of old M oil and washed with diesel and filled with fresh 7 ltrs of M oil and providing and fitting of new washer of the bearing housing and washers of the cooling system (02 No).The job includes fitting the bearing housing in the discharge head and then fitting of cooling system of the bearing. All the tools and tackles, consumables, skilled labour required for carrying out the job shall be arranged by the firm. The execution of work shall be carried by technically sound persons well versed with such works. The VT motor shall then be shifted from motor stool over the discharge head with the help of gantry mechanism. The motor and pump be connected through the coupling by tightening the coupling bolts. Reconnecting the electric supply and control cabling at the terminal boxes. Finally testing the pumping unit on full load. The rate will be allowed at the rate of 4.75% per unit of the whole item
Rate of Compelete job From S. No. 10 to 12.05
Repairs to de-sludge submersible pumping unit by way of:
Extraction of the pumping unit from the sump by way of dismantling the column pipes by opening the nuts bolts using chain pulley block and other tools and tackles.The job includes cutting of rusted nuts and bolts using cutter and other tools and tackles. The job includes loading of the pumping unit in private load carrier and then carriage of the same from site to workshop for repairs. The rate will be allowed at the rate of 13.46% per unit of the whole item
Dismantling the pumping unit by way of de-coupling the pump from the motor by way of opening the nuts and bolts of the casing cover plate, removing the damaged key of impeller. The rate will be allowed at the rate of 2.69% per unit of the whole item
Repairs to pump casing by way of finishing impeller seat of the wear plate.The job includes holding the pump casing on the chuck of the lathe machine, centring and then finishing the impeller seat using finishing tool. The rate will be allowed at the rate of 12.31% per unit of the whole item
Manufacturing, providing and fitting of new CI wearing ring/neck ring entirely as per requirement to diffuser and impeller shoulder rings. The job involves machining of neck ring both internally as well as externally to fit in the pump casing as well as on impeller shoulder. The rate will be allowed at the rate of 17.31% per unit of the whole item
Fabrication, providing and fitting of agitator of the pump.The pump agitator to be casted out of abrasion resistant cast iron. The rate will be allowed at the rate of 13.85% per unit of the whole item
Fabrication, providing and fitting of spacer for agitator.The spacer to be fabricated out of cast steel AISI 410. The rate will be allowed at the rate of 17.31% per unit of the whole item
Fabrication, providing and fitting of impeller key and agitator key. The keys to be fabricated out of AISI 304 and as per sample. The rate will be allowed at the rate of 6.92% per unit of the whole item
Installation of the pump after carrying out the above repairs by way of lowering the pump with the help of gantry mechanism and other tools and tackles.The job includes refitting the column pipes, bends, connecting with the delivery line and then testing the unit on full load.Providing and fitting of rubber gaskets, nuts and bolts of appropriate size is included in the job. The rate will be allowed at the rate of 16.15% per unit of the whole item
Rate of Compelete job From S. No. 13 to 13.08
Repairs to 800/600 mm ND rising main by way of:
Excavation of the loose soil at the site of leakage so as to expose the leaking rising main. The job includes formation of the pit to uncover the pipe and making working space using appropriate excavator. (Normal Excavator) The rate will be allowed at the rate of 2.54% per unit of the whole item
Excavation of the loose soil at the site of leakage so as to expose the leaking rising main. The job includes formation of the pit to uncover the pipe and making working space using appropriate excavator. (Poclan Excavator) The rate will be allowed at the rate of 6.35% per unit of the whole item
Close timbering in pit/ trench including strutting, shouring and packing cavities wherever required. The rate will be allowed at the rate of 1.40% per unit of the whole item
Dewatering of the trench/ pit by way of operating the submersible pumping unit on DG set. All the tools and tackles required for the job is to be arranged by the firm. The rate will be allowed at the rate of 0.63% per unit of the whole item
Dismantling the PCC block of the bund on the road side using machine operated concrete breaker. The concrete breaker to be operated by the skilled person well versed with the job. The rate will be allowed at the rate of 2.54% per unit of the whole item
Cleaning of the pipe along its circumference at the leaking spots using manual labours.The job includes formation of the working space/platform under the excavated trench under the pipe.All the tools and tackles including shovels, ladders, buckets etc required for carrying out the job is included in the job. The rate will be allowed at the rate of 10.16% per unit of the whole item
Repairs to rising mains/delivery manifold by way identifying the leakage spots & cutting of windows of appropriate size at the required places using oxy-acetylene gas cutter for welding of the cracked portion of the delivery manifold/rising mains from inside. The job includes cleaning of the leaked spots of the rising main from paint, rust and other foreign bodies and then welding of cracked/leaking spots inside as well as outside by arc welding using Adore made welding electrodes. The process is made continuous unless leaking spots are made leak proof. The job further includes welding back of already cut windows in two runs by using electric arc welding using Adore electrodes, making it complete leakage proof. The job further includes welding of 8 mm thick MS piece at the leaking spot after cutting it as per the joint profile. All the tools and tackles required for carrying out the work to be arranged by the firm. After carrying out the work, testing of the delivery manifold/rising mains for any leakage on full load is included in the job. The rate will be allowed at the rate of 31.75% per unit of the whole item
Fabrication , Providing , Fitting of MS Plate 10mm thick to be used over the damaged spot of the pipe. The rate will be allowed at the rate of 0.19% per unit of the whole item
Repairs to the rising main by way of welding at the leakage spot of delivery manifold of 800mm dia rising main at WSS Tangnar-II. The job includes draining all the water from the rising main by way of opening the wash out of the rising main prior to which the pumping units were shut off. The job includes hiring of dewatering pump for dewatering the accumulated water in the pit at the work place. The job includes cleaning of the leaked spots of the rising main from paint, rust and other foreign bodies and then welding of cracked/leaking spots by arc welding using Adore electrodes.The process is made continuous unless leaking spots are made leak proof.All the tools and tackles required for carrying out the work is to be arranged by the firm.After carrying out the work,testing of the delivery manifold for any leakage on full load is included in the job.The rate will be allowed at the rate of 12.70% per unit of the whole item
Repair to wash out system
Repairs to wash out system of the 800 mm N.D rising main located at the bund on the road side by way of dewatering of the accumulated water in the sluice chamber, which is about 22 feet deep, using dewatering pump to be arranged by the firm. The job includes repairs to the 300 mm sluice valve by way of extracting the sluice valve from the system and then replacement of damaged sluice nut by fabrication, providing and fitting of new sluice nut as per sample. The job includes fitting of sluice valve in the wash out system. The rate will be allowed at the rate of 19.05% per unit of the whole item
Providing and fitting of extension rod fabricated out of GI pipe of 6m long and 25mm dia for the operation of the Sluice valve of wash out system. The extension rod shall be provided with the arrangement at the lower end to fix with the sluice rod /spindle and at the upper end to hold the operating wheel to be fabricated out of MS material as per the requirement. The rate will be allowed at the rate of 12.70% per unit of the whole item
Rate of Compelete job From S no. 14 to 15.02
Providing/Fitting of DI Sluice Valves in place of damaged ones at WSS Tangnar Stage 1/ 2 as per the specifications given below:
SLUICE VALVE: Size : 150 mm PN rating : 1.6 Construction: Resilient seated sluice valve for water application. Straight pocket less body passage with inside stem screw Features: Low torque due to plastic sliding caps on the wedge. Operation with hand wheel. Material of Construction: Body and Bonnet: Ductile Iron EN-JS 1030 (GGG-40) Wedge: Ductile Iron EN-JS 1030 (GGG-40) with fully lined EPDM Stem: Stainless Steel Stem sealing: Toroidal NBR sealing ring Stem Nut: Brass Surface: Epoxy powder coating inside and outside Make:-VAG/Kirloskar/Sigma flow/Talis The job includes modification of the existing flanges and pipeline as per site requirement and dewatering of sluice chamber by using dewatering pump.All the tools and tackles, skilled labour required in the execution of the job shall be arranged by the firm. The rate will be allowed at the rate of 5.70% per unit of the whole item
Providing and fitting of Sluice Valves to the washout of the rising main as per the specifications given below: SLUICE VALVE: Size : 300 mm PN rating : 2.5 Construction: Resilient seated sluice valve for water application. Straight pocket less body passage with inside stem screw Features: Low torque due to plastic sliding caps on the wedge. Operation with hand wheel. Material of Construction: Body and Bonnet: Ductile Iron EN-JS 1030 (GGG-40) Wedge: Ductile Iron EN-JS 1030 (GGG-40) with fully lined EPDM Stem: Stainless Steel Stem sealing: Toroidal NBR sealing ring Stem Nut: Brass Surface: Epoxy powder coating inside and outside Make:-VAG/Kirloskar/Sigma flow/Talis The job includes modification of the existing flanges and pipeline as per site requirement and dewatering of sluice chamber by using dewatering pump. All the tools and tackles, nuts bolts & skilled labour required in the execution of the job shall be arranged by the firm. The rate will be allowed at the rate of 17.54% per unit of the whole item
Providing and fitting of Sluice Valves to the delivery lines of each pumping unit at stage-2 as per the specifications given below: SLUICE VALVE: Size : 400 mm PN rating : 2.5 Construction: Resilient seated sluice valve for water application. Straight pocket less body passage with inside stem screw Features: Low torque due to plastic sliding caps on the wedge. Operation with hand wheel. Material of Construction: Body and Bonnet: Ductile Iron EN-JS 1030 (GGG-40) Wedge: Ductile Iron EN-JS 1030 (GGG-40) with fully lined EPDM Stem: Stainless Steel Stem sealing: Toroidal NBR sealing ring Stem Nut: Brass Surface: Epoxy powder coating inside and outside Make:-VAG/Kirloskar/Sigma flow/Talis The job includes modification of the existing flanges and pipeline as per site requirement and dewatering of sluice chamber by using dewatering pump. All the tools and tackles, nuts bolts & skilled labour required in the execution of the job shall be arranged by the firm. The rate will be allowed at the rate of 39.47% per unit of the whole item
Providing/Fitting of DI Air release Valves in place of damaged ones at WSS Tangnar Stage-I/ II
Providing and fitting of DN80 ARV(air release valve) to the 400mm dia MS rising main with 80mm diaMS pipe attachment as per site requirement. The ARV shall have following specifications:- i) valve type -single chamber, single orifice. ii) End connection -Flanged ends to IS 1538 iii) Working pressure -PN 1.6. iv) Working temperature -70C v) Test pressure -Body /seat 2.5xPN. vi) Sealing ring -EPDM. vii) Construction -ductile iron with stainless steel floats. viii) Coating -epoxy with corrosion resistance. ix) Make -VAG/Sigma flow/IVC/Talis The rate will be allowed at the rate of 5.48% per unit of the whole item
Providing and fitting of DN50 ARV (air release valve) to the 600mm dia MS rising main. The ARV shall have following specifications:- i) valve type -single chamber, single orifice. ii) End connection -Flanged ends to IS 1538 iii) Working pressure -PN 1.6. iv) Working temperature -70C v) Test pressure -Body /seat 2.5xPN. vi) Sealing ring -EPDM. vii) Construction -ductile iron with stainless steel floats. viii) Coating -epoxy with corrosion resistance. ix) Make -VAG/Sigma flow/IVC/Talis The rate will be allowed at the rate of 4.39% per unit of the whole item
Providing and fitting of DN150 ARV (air release valve) to the 800 mm dia MS rising main. The ARV shall have following specifications:- i) valve type -single chamber, single orifice. ii) End connection -Flanged ends to IS 1538 iii) Working pressure -PN 1.6. iv) Working temperature -70C v) Test pressure -Body /seat 2.5xPN. vi) Sealing ring -EPDM. vii) Construction -ductile iron with stainless steel floats. viii) Coating -epoxy with corrosion resistance. ix) Make -VAG/Sigma flow/IVC/Talis The rate will be allowed at the rate of 10.96% per unit of the whole item
Providing and fitting of DN150 ARV (air release valve) to the 800 mm dia MS rising main. The ARV shall have following specifications:- i) valve type -single chamber, single orifice. ii) End connection -Flanged ends to IS 1538 iii) Working pressure -PN 2.5 iv) Working temperature -70C v) Test pressure -Body /seat 2.5xPN. vi) Sealing ring -EPDM. vii) Construction -ductile iron with stainless steel floats. viii) Coating -epoxy with corrosion resistance. ix) Make -VAG/Sigma flow/IVC/Talis The rate will be allowed at the rate of 16.45% per unit of the whole item
Rate of Compelete job From S No. 16 To 17.04
Providing and fitting of high tensile strength Galvanized nuts and bolts in place of damaged ones of following sizes
18 mm dia. 125 mm long. The rate will be allowed at the rate of 5.88% per unit of the whole item
24 mm dia 125mm long. The rate will be allowed at the rate of 8.91% per unit of the whole item
24 mm dia 175 mm long. The rate will be allowed at the rate of 11.59% per unit of the whole item
30 mm dia 125 mm long. The rate will be allowed at the rate of 17.47% per unit of the whole item
30 mm dia 150 mm long. The rate will be allowed at the rate of 21.39% per unit of the whole item
40 mm dia. 150 mm long. The rate will be allowed at the rate of 24.06% per unit of the whole item
18mm dia 175 mm long. The rate will be allowed at the rate of 10.70% per unit of the whole item
Rate of Compelete job From 18 to 18.07
Repairs to 15 ton Overhead Crane by way of:
Dismantling the overhead travelling crane by way of disconnecting the power supply to the electric motors of the crane, opening the fasteners and then lifting travelling part of the crane with the help of hydra to be provided by the firm and then placing it at the safer place inside the pump station. All the tools and tackles and technical personnel is to be arranged by the firm. The rate will be allowed at the rate of 4.15% per unit of the whole item
Repairs to clutch assembly by way of dismantling the same using special tools and tackles at workshop and then extracting the damaged shaft from it. The job includes fabrication, providing and fitting of new shaft to be fabricated of SS-410 and as per sample. The job involves turning, finishing, gear formation etc.to be performed at the workshop on lathe machine and gear formation machine. The job also includes replacement of broken gear as per sample. The job further includes assembling of the clutch assembly. The rate will be allowed at the rate of 8.65% per unit of the whole item
Repairs to the electrical system of the gantry by way of rewinding of 15 HP motor coupled to wire drum assembly. The job includes dismantling the motor using special tools and tackles and then extraction of damaged stator windings and rewinding the stator coil using standard grade copper wire.The rate will be allowed at the rate of 5.19% per unit of the whole item
Dismantling the wire rope drum and then extracting the damaged sling rope and then providing and fitting of new sling rope in place of damaged one. The diameter and length of the sling rope shall be 25 mm and 40 m respectively. The job further includes assembling of the wire drum assembly after carrying out the servicing of the other parts of the assembly. The rate will be allowed at the rate of 8.65% per unit of the whole item
Fitting of wire drum, gear box, clutch assembly and electric motors and placing the whole assembly back on the gantry with the help of hydra to be provided by the firm. Connecting the power supply to the motors of the hydraulic crane and then testing of the travelling crane on full load. The job also includes carriage of clutch assembly from site to workshop and back. The rate will be allowed at the rate of 4.15% per unit of the whole item
Cost on a/c of hiring charges of hydra. The rate will be allowed at the rate of 1.38% per unit of the whole item
Repairs to 7.5 ton Overhead Crane by way of:
Dismantling the overhead travelling crane by way of disconnecting the power supply to the electric motors of the crane, opening the fasteners and then lifting travelling part of the crane with the help of hydra to be provided by the firm and then placing it at the safer place inside the pump station. All the tools and tackles and technical personnel is to be arranged by the firm. The rate will be allowed at the rate of 4.15% per unit of the whole item
Repairs to clutch assembly by way of dismantling the same using special tools and tackles at workshop and then extracting the damaged shaft from it. The job includes fabrication, providing and fitting of new shaft to be fabricated of SS-410 and as per sample. The job involves turning, finishing, gear formation etc.to be performed at the workshop on lathe machine and gear formation machine. The job also includes replacement of broken gear as per sample. The job further includes assembling of the clutch assembly. The rate will be allowed at the rate of 6.92% per unit of the whole item
Repairs to the electrical system of the gantry by way of rewinding of 7.5 HP motor coupled to wire drum assembly. The job includes dismantling the motor using special tools and tackles and then extraction of damaged stator windings and rewinding the stator coil using standard grade copper wire. The rate will be allowed at the rate of 2.77% per unit of the whole item
Dismantling the wire rope drum and then extracting the damaged sling rope and then providing and fitting of new sling rope in place of damaged one. The diameter and length of the sling rope shall be 16 mm and 40 m respectively. The job further includes assembling of the wire drum assembly after carrying out the servicing of the other parts of the assembly. The rate will be allowed at the rate of 4.15% per unit of the whole item
Fitting of wire drum, gear box, clutch assembly and electric motors and placing the whole assembly back on the gantry with the help of hydra to be provided by the firm. Connecting the power supply to the motors of the hydraulic crane and then testing of the travelling crane on full load. The job also includes carriage of clutch assembly from site to workshop and back. The rate will be allowed at the rate of 4.15% per unit of the whole item
Cost on a/c of hiring charges of hydra. The rate will be allowed at the rate of 1.38% per unit of the whole item
Repairs to 5 ton Overhead Crane by way of:
Dismantling the overhead travelling crane by way of disconnecting the power supply to the electric motors of the crane, opening the fasteners and then lifting travelling part of the crane with the help of hydra to be provided by the firm and then placing it at the safer place inside the pump station. All the tools and tackles including hydra and technical personnel is to be arranged by the firm. The rate will be allowed at the rate of 2.77% per unit of the whole item
Repairs to clutch assembly by way of dismantling the same using special tools and tackles at workshop and then extracting the damaged shaft from it. The job includes fabrication, providing and fitting of new shaft to be fabricated of SS-410 and as per sample. The job involves turning, finishing, gear formation etc.to be performed at the workshop on lathe machine and gear formation machine. The job also includes replacement of broken gear as per sample. The job further includes assembling of the clutch assembly. The rate will be allowed at the rate of 5.19% per unit of the whole item
Repairs to the electrical system of the gantry by way of rewinding of 5 HP motor coupled to wire drum assembly. The job includes dismantling the motor using special tools and tackles and then extraction of damaged stator windings and rewinding the stator coil using standard grade copper wire. The rate will be allowed at the rate of 2.08% per unit of the whole item
Dismantling the wire rope drum and then extracting the damaged sling rope and then providing and fitting of new sling rope in place of damaged one. The diameter and length of the sling rope shall be 12 mm and 40 m respectively. The job further includes assembling of the wire drum assembly after carrying out the servicing of the other parts of the assembly. The rate will be allowed at the rate of 4.15% per unit of the whole item
Fitting of wire drum, gear box, clutch assembly and electric motors and placing the whole assembly back on the gantry with the help of hydra to be provided by the firm. Connecting the power supply to the motors of the hydraulic crane and then testing of the travelling crane on full load. The job also includes carriage of clutch assembly from site to workshop and back. The rate will be allowed at the rate of 2.77% per unit of the whole item
Cost on a/c of hiring charges of hydra for 01 day is included in the job. The rate will be allowed at the rate of 1.38% per unit of the whole item
Servicing of the Overhead Cranes by way of disconnecting the power supply to the electric motors of the crane and carrying out mechanical servicing of the gantry which includes cleaning and greasing of all the moving parts. The job also includes tightening of all the nuts and bolts and replacement of damaged nuts and bolts of the gantry. The job also includes tightening of all the nuts and bolts of the sling rope drum and replacement of damaged U-clamps. The job also includes checking of the sling rope from any kind of damage or any entanglement. The job further includes checking of any kind of damages to supporting guy wire and supports/locks of power cable. Load testing of the over- head crane is also included in the job.
15-ton capacity. The rate will be allowed at the rate of 11.07% per unit of the whole item
7.5-ton capacity. The rate will be allowed at the rate of 8.65% per unit of the whole item
5-ton capacity. The rate will be allowed at the rate of 6.23% per unit of the whole item
Rate of Compelete job From S no. 19 to 22.03
Repairs to DI Sluice Valve/NRV at WSS Tangnar Stage-I / II
Repairs to 300 mm ND sluice valve installed in the washout line by way of dewatering the sluice chamber using dewatering pump to be arranged by the firm and then dismantling the said sluice valve from the washout line by opening of the nuts bolts, cutting of rusted/damaged nut bolts using gas torch. The job includes cutting of the flange joint of the pipe using gas torch & extracting the sluice valve using chain pulley block and other tools and tackles required as per the site conditions. The job further includes replacement of 02 no. damaged washers of flanged joint of sluice valve by new RI cloth washer & complete fitting back the sluice valve in the washout line through electric arc welding using Adore make welding electrodes and tightening the flanges using new nuts, bolts , washers to be provided by the contracting firm. The job also includes testing the same for any leakages at flanged joints on full load. The rate will be allowed at the rate of 5.77% per unit of the whole item
Repairs to 400 mm ND sluice valve installed in the delivery line of the individual pumping unit by way of opening of the nuts bolts, cutting of rusted/damaged nut bolts using gas torch. The job includes cutting of the flange joint of the pipe using gas torch & extracting the sluice valve using chain pulley block and other tools and tackles required as per the site conditions. The job further includes replacement of 02 no. damaged washers of flanged joint of sluice valve by new RI cloth washer & complete fitting back the sluice valve in the delivery line through electric arc welding using Adore make welding electrodes and tightening the flanges using new nuts, bolts, washers to be provided by the contracting firm. The job also includes testing the same for any leakages at flanged joints on full load. The rate will be allowed at the rate of 6.93% per unit of the whole item
Repairs to 300 mm ND sluice valve of washout of rising main by way of dewatering the sluice chamber using dewatering pump and then dismantling the top of the sluice valve and then fabrication, providing and fitting of new gun metal spindle along with gun metal wedge in place of damaged one. The job includes turning, finishing and thread cutting of spindle and wedge as per the sample. The job includes replacement of metallic packing of the gland, P/F of nuts and bolts & finally re-assembling of the sluice valve and finally testing it on load. The rate will be allowed at the rate of 10.16% per unit of the whole item
Repairs to 400 mm ND sluice valve of washout of rising main by way of dewatering the sluice chamber using dewatering pump and then dismantling the top of the sluice valve and then fabrication, providing and fitting of new gun metal spindle along with gun metal wedge in place of damaged one. The job includes turning, finishing and thread cutting on spindle and wedge as per the sample The job includes replacement of metallic packing of the gland, P/F of nuts and bolts & finally re-assembling of the sluice valve and finally testing it on load. The rate will be allowed at the rate of 11.55% per unit of the whole item
Repairs to 800 mm ND rising main by way of preparing the work place by earth excavation at the site , dismantling the ND 700 mm NRV from the rising main by way of opening of the nuts bolts, cutting of rusted/damaged nut bolts using gas torch and extracting the NRV from the rising mains using tripod stand, chain pulley block. The job includes cutting of the flange joint of the pipe using gas torch & extracting the NRV.The job includes replacement of 02 no. damaged washers of flanged joints of 700 mm NRV by new RI cloth washers. The job further includes fitting of NRV back with the rising main using new high tensile nuts/bolts & washers to be provided by the firm and finally testing of the rising main for any leakages at flanged joints of NRV on full load. All the tools and tackles including DG set, gas cutter, welding machine, dewatering pump etc required for completion of job in all respect is to be arranged and brought to the site by the contracting agency. The rate will be allowed at the rate of 18.48% per unit of the whole item
Repairs to 600 mm ND rising main by way of preparing the work place by earth excavation at the site if required, dismantling the ND 600 mm NRV from the rising main by way of opening of the nut’s bolts, cutting of rusted/damaged nut bolts using gas torch and extracting the NRV from the rising mains using tripod stand, chain pulley block. The job includes replacement of 02 no. damaged washers of flanged joints of 700 mm NRV by new RI cloth washers. The job further includes fitting of NRV back with the rising main using new high tensile nuts/bolts & washers to be provided by the firm and finally testing of the rising main for any leakages at flanged joints of NRV on full load. All the tools and tackles including DG set, gas cutter, welding machine, dewatering pump etc required for completion of job in all respect is to be arranged and brought to the site by the contracting agency. The rate will be allowed at the rate of 11.55% per unit of the whole item
Repairs to 400 mm ND NRV installed in the delivery line of the individual pumping unit by way of opening of the nuts bolts, cutting of rusted/damaged nut bolts using gas torch. The job includes cutting of the flange joint of the pipe using gas torch & extracting the NRV using chain pulley block and other tools and tackles required as per the site conditions. The job further includes replacement of 02 no. of damaged washers of flanged joint of NRV by new RI cloth washer & complete fitting back the NRV in the delivery line through electric arc welding using Adore make welding electrodes and tightening the flanges using new nuts, bolts, washers to be provided by the contracting firm. The job also includes testing the same for any leakages at flanged joints on full load. The rate will be allowed at the rate of 6.93% per unit of the whole item
Repairs to ND 700mm NRV/expansion flanged joint installed in the rising main by way of dewatering the rising main by operating the washout. The job includes cleaning of the leaked spots of the rising main from paint, rust and other foreign bodies and then welding of cracked/leaking spots by arc welding using Adore make welding electrodes. The process is made continuous unless leaking spots are made leak proof. All the tools and tackles including mobile DG set, welding set etc required for carrying out the work is to be arranged by the firm. The job also includes testing the same for any leakages at flanged joints on full load. The rate will be allowed at the rate of 16.17% per unit of the whole item
Repairs to 800 mm ND expansion joint of the rising main by way of dewatering the rising main by operating the washout. The job includes disassembling the MS gland of the leaking expansion joint by cutting the worn out/rusted nuts and bolts and then providing and fitting of 25 sq.mm packing of Dunlop make and then assembling the expansion joint and providing and fitting of new nuts and bolts in place of damaged ones. All tools and tackles required for carrying out the job is to be arranged and brought to site by the contracting agency and finally testing of the expansion joint after carrying out the above repairs works. The rate will be allowed at the rate of 12.47% per unit of the whole item
Rate of Compelete job from S No. 23 to 23.09
providing of 12mm palmative packing
providing of Gasket sheet (4 mm)
providing of Dhoti Cloth (1 Mtr X 3 Mtr)
M/S GERMAN MECH ELECTRO ENGG
SHAWL ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .