Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹74,257.50Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹75,930.77+₹1,673.27 (2.25%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹76,732.75+₹2,475.25 (3.33%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹76,930.77+₹2,673.27 (3.60%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹77,029.78+₹2,772.28 (3.73%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹99,000
EMD Value
₹4,950
Closing Date
13 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
Construction of Lane with drain from main road to Jamia Masjid at Zabgulla Sukhnag Budgam
2026_RDPR_317104_17
NIT_17_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
SUKHNAG
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹4,950
29 Aug 2026
21 Jul 2026
14 Aug 2026
21 Jul 2026
13 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work in excavation by Mech means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shaftswells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 3.02 | Cum | 256.85 | ₹775.69 |
| - | Providing and laying of stone soling hand packed complete Job including by MT incl. plum. | 2.92 | Cum | 937 | ₹2,736.04 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.97 | Cum | 5,202.9 | ₹5,046.81 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 7.82 | Cum | 5,733.6 | ₹44,836.75 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 42.76 | Sqm | 286.35 | ₹12,243.75 |
| - | CEMENT PLASTER (IN FINE SAND)
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 4 fine sand) | 54.9 | Sqm | 266.2 | ₹14,614.38 |
| - | Carraige of stone aggregate, 40 mm from 15 kms | 0.87 | Sqm | 374.49 | ₹325.81 |
| - | Carraige of stone aggregate, 20 mm from 15 kms | 7.04 | cum | 344.49 | ₹2,425.21 |
| - | Carraige of sand from 15 kms | 3.95 | cum | 344.49 | ₹1,360.74 |
| 0_) | Carraige of stone soling from Source to Site. | 2.92 | cum | 349.42 | ₹1,020.31 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_1037554.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .