Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 CrAdmitted-Finance | ₹8.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.3 Cr+₹3.6 L (0.44%)Admitted-Finance BHULI E BLOCK SEC 4 BANK MORE DHANBAD | ₹8.3 Cr+₹3.6 L (0.44%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S AMIT PRASAD L1 | Neha Construction L2 |
|---|---|---|---|---|---|
| 1.00MODEL-1A WITHOUT SOURCE-5 | |||||
| 2.00Solar Photovoltaic (SPV) Solar Submersible D.C. Water Motor Pump | |||||
| 3.00Designing, Supplying, Installation, Testing & Commissioning with all tools & Parts of following Solar Photovoltaic (SPV) Solar Submersible D.C. Water Motor Pump Suitable for minimum 125mm x 115mm bore well as per MNRE Guideline with following specifications & accessories. | |||||
| 4.00SPV arrays contains specified No of same capacity type & specification modules connected to series or parallel to obtained the required voltage & current the power output of individual PV modules should be minimum 200 watt peak. | |||||
| 5.00i) The SPV modules should be as per IEC-61215 and IEC 61730 part 1.0) | |||||
| 6.00ii) All external parts of motor pump used in submersible pump which are in contact of water is stainless steel grade 303 or higher as required. | |||||
| 7.00iii) The PV modules should be mounted on metallic structure of adequate strength and appropriate design which can withstand load of modules & High wind pressure up to 200Km/h. | |||||
| 8.00iv) The module mounting structure should be hot dip galvanized according to IS 4759. | |||||
| 9.00v) To enhance the performance of SPV water pumping system & arrangement for seasonal tilt angle Adjustment should be provided | |||||
| 10.00vi) Necessary arrangement should be provided in controller automatic start-run-stop through out the day with water level detection system. (As per MNRE Specification) | |||||
Tender Value
₹7.9 Cr
EMD Value
₹7.9 L
Closing Date
24 Nov 2021, 5:00 pmClosed
Executive Engineer D W and S D Hazaribag
Executive Engineer D W and S D Hazaribag
Construction of Cluster wise Single Village Water Supply Schemes based on Solar Energy Based Mini Rural Pipe Water Supply Schemes house connection with 05 Years O M under D W and S D, Hazaribag Head JJM HZB_SVS_Cluster _Tatijhariya_01C
2021_DWSD_52716_3
HZB/JJM/SVS_Cluster/22/ 2021-22(1st call)
Open Tender
Civil Works
Turn-key
270 days
HAZARIBAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Executive Engineer D W and S D Hazaribag
₹7.9 L
Engineer in Chief D W and S D Jharkhand Ranchi
19 Feb 2022
1 Nov 2021
26 Nov 2021
1 Nov 2021
24 Nov 2021
3 Nov 2021
3 Nov 2021
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_70428.xls
BOQ • 0.63 MB
Technical_1C.pdf
Tender Documents • 2.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .