| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 CrAccepted-AOC 8TH FLOOR WEST AVE KALYANI NAGAR PUNE 411006 | PUNE | PUNE | MAHARASHTRA | 411006 | ₹6.4 Cr Quoted ₹6.7 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹6.7 Cr+₹1.9 L (0.29%)Rejected-Finance | ₹6.7 Cr+₹1.9 L (0.29%) | L2 | Rejected-Finance HIGH |
| 3 | L3₹6.8 Cr+₹7.0 L (1.05%)Rejected-Finance | ₹6.8 Cr+₹7.0 L (1.05%) | L3 | Rejected-Finance HIGH |
Tender Value
₹6.4 Cr
EMD Value
₹6.4 L
Closing Date
16 Jun 2026, 6:00 pmClosed
Chief Officer
Rahata Municipal Council,TaRahata Dist Ahilyanagar
Development of Bajartal at Rahata Municipal Council
2026_DMA_1307198_2
RMC/Civil/8/316/2026
Open Tender
Civil Works
Percentage
270 days
Rahata Municipal Council, TaRahata Dist Ahilyanagar
Please refer Tender documents.
8 documents required · 8 mandatory
₹20,000
₹6.4 L
Rahata Municipal Council,TaRahata Dist Ahilyanagar
2 Sept 2026
9 Jun 2026
18 Jun 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Gabian wall
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 1,210 | Sqm | 12.38 | ₹14,979.8 |
| 2 | Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. | 9 | Cum | 1,496.85 | ₹13,471.65 |
| 3 | Providing, constructing coffer dam in river basin / dam storages as per type design including excavation, filling the middle portion with B. C. soil (in gunny bags if required). Providing impervious / semipervious materials on both side of B.C. soil (in gunny bags if required) including ramming, compacting to the satisfaction of Engneer-in-charge, till the completion of work including dismantling coffer dam after completion of works and disposing off the material as directed by the Engineer-in-charge. Note:- Pay line maximum- Top width payble shall be 2 m. and maximum payble side slopes shall be 1.5 horizontal to 1 vertical. if if the constructed top width of the side slops are less, then the measurements at actual are payble. Extra top width or flatter slopes are not payable. contractor is free to use ballies, plastic sheets, piles, pipes, C.G.I. sheets for supporting hearting materials instead of impervious/ semipervious hearting materials for which no extra payments shall be payble. 30% payment shall be withheld for dismantling of coffer dam. this foot note shall appear in tender condition | 385 | Cum | 826.18 | ₹3,18,079.3 |
| 4 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means | 1,028.5 | Cum | 246.55 | ₹2,53,576.68 |
| 5 | Excavation for foundation in hard murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete.
a) Upto 1.50m lift Normal Rate | 121 | Cum | 248.62 | ₹30,083.02 |
| 6 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | 36.3 | Cum | 442.56 | ₹16,064.93 |
| 7 | Excavation for foundation in Hard rock by blasting including trimming and leveling the bed by chiseling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum, watering, ramming, etc. complete. (Lift upto 1.5m) By Mechanical Means | 24.2 | Cum | 903.33 | ₹21,860.59 |
| 8 | Disposal of materials obtained from road cutting for a lead of over 5 KM | 251 | Cum | 260.19 | ₹65,307.69 |
| 9 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 10.0 to 19.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) | 2,000 | Per Hr | 230.05 | ₹4,60,100 |
| 10 | Filling in plinth and floors with approved excavated material in 15cm. to 20cm. Layers including watering and compacting etc. complete. | 1,089 | Cum | 123.79 | ₹1,34,807.31 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
TenderBajartal.pdf
Tender Documents • 0.83 MB
BOQ_2243348.xls
BOQ • 0.37 MB
prebidbajartal.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .