Loading…
Loading…
Tender Value
₹8.4 L
EMD Value
₹20,900
Closing Date
11 Sept 2026, 4:00 pmDue today
Public Works Department
MAHADEVASWAMY N
Annual Maintenance of NH209 Achalu to Yedamaranahally via Honganidoddi to join Kodihalli sathanuru road at ch 0.00km to 10.00km in Kanakapura tq, Bengaluru south dist
PWD/2026-27/RD/WORK_INDENT40668
PWD/2026-27/RD/WORK_INDENT40668
Open
Roads
Electronic Documents, First(One Cover)
PWD Special Division Office Ramanagara
1 document required · 1 mandatory
₹500
₹20,900
4 Sept 2026
31 Aug 2026
11 Sept 2026
Annual Maintenance of NH209 Achalu to Yedamaranahally via Honganidoddi to join Kodihalli sathanuru road at ch 0.00km to 10.00km in Kanakapura tq, Bengaluru south dist
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with ...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Additionalities for formwork, centering, scaffolding charges shall be added on percentage to the finished concrete for drain walls 35 % (PWD SR VOL- 1 Addendum Percentage Additionalities for Formwork,...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw1-40668.doc
Tender Document • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .