Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5 LAccepted-AOC | 1 | Accepted-AOC Generally found in order |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
27 Jun 2022, 11:00 amClosed
EE/D/kadayanallur
O/o.Executive Engineer/Distribution/Kadayanallur 625711
Execution of Contract towards Extension of supply works for effecting of new services of agriculture and natural calamities works of kadayanallur sub division of kadayanallur division.
2022_EB_236691_1
kdnlr ETW005/22-23
Open Tender
Electrical and Maintenance Works
Works
kadayanallur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,000
Yes
19 Oct 2022
20 Jun 2022
28 Jun 2022
20 Jun 2022
27 Jun 2022
20 Jun 2022
Amount
Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles
Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles
Rocky ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles
Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles
Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
Normal ground- Erection of 9M & 9.14M poles
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
Rocky ground- Erection of 9M & 9.14M poles
Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists
Normal ground- Erection of above 9.14M poles & 36' length RS Joists
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists
Rocky ground- Erection of above 9.14M poles & 36' length RS Joists
Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for 42' length RS Joists
Normal ground- Erection of 42' length RS Joists
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for 42' length RS Joists
Rocky ground- Erection of 42' length RS Joists
Transporting of poles from road side to pole pit - 7.32m, 7.5m, 8m, 8.23m RCC pole
Transporting of poles from road side to pole pit - 9m, 9.14m RCC/PSC pole
Transporting of poles from road side to pole pit - RSJ 36' Pole
Transporting of poles from road side to pole pit - RSJ 42' and above
Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole
Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole
Loading and Unloading of poles - RS Joists, tubular & rail pole (above 9.14m)
Concreting of poles as per Board Standards (2'*2'*5'). The material such as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.)
Coping of pole (0.6m*0.6m*0.35m)
Concreting of stay (o.3m * 0.3m * 1.5m) including materials except cement
Coil earthing per pole & pole earthing
Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
Normal ground- Erection of stay set
Rocky ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
Rocky ground- Erection of stay set
Loading unloading of line Materials
Fixing of V & Channel cross arm 5.5' (pin point/cut point)and insulator including transporting of materials from road side to site
Fixing of V & Channel cross arm 4.5' (pin point/cut point)and insulator including transporting of materials from road side to site
Fixing of V & Channel cross arm 3.5' (pin point/cut point)and insulator including transporting of materials from road side to site
Fixing of LT 3Phase cross arm and insulator including transporting of materials from road side to site
Fixing of LT 1Phase cross arm and insulator including transporting of materials from road side to site
Fixing of HT LT TI fitting and insulator including transporting of materials from road side to site
Erection of HT Side arm with stud including transporting of materials from road side to site
Erection of LT Side arm with stud including transporting of materials from road side to site
Fixing of insulator (per location) including transporting of materials from road side to site
Erection of 11 KV disc and insulator including transporting of materials from road side to site
Fixing of Tapping channel X arm including transporting of materials from road side to site
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 11KV 7/2.59 ACSR (1Span/Wire)
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 11KV 7/3.35 ACSR (1Span/Wire)
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 11KV 7/4.09 ACSR (1Span/Wire)
For HT line clear works for For 7/2.59 ACSR (1Span/Wire)
For HT line clear works for For 7/3.35 ACSR (1Span/Wire)
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR, 7/2.50 AAAC
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR,7/3.15 AAAC
For LT line clear works for For 7/2.59 ACSR (1Span/Wire)
For LT line clear works for For 7/3.35 ACSR (1Span/Wire)
Guarding per span length- Spilt Neutral Guarding
Guarding per span length- Flat Guarding (2 wires)
Guarding per span length- Flat Guarding (4 wires)
Guarding per span length- Flat Guarding (6 wires)
Guarding per span length- Fixing of one earthing device with stud
Erection of transformer/dismantling upto 200KVA
Erection of Transformer Metering set
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder
Erection of feeder cable with open type fuse unit - for each addl feeder
Erection of feeder cable -Bus bar arrangement with open type
Loading & unloading of Distribution transformer below 250KVA
Loading & unloading of Distribution transformer 250KVA
Fabrication,erection and excavation for center support etc for 250/500 DT including transporting
Painting of SC Number including painting
Manufacturing of clamps 50*8 mm
Manufacturing of clamps 65*10 mm
Alteration of clamps
Street light switching pont arrangement
Drilling less than 23mm holes per hole/slatted hole
Cutting of channel
Cutting of Flat
Cutting of Angle
RSJ pole cutting
Tubular pole cutting
Rail pole cutting
Fabrication of lightning arrestor frame
LT-Changing of pin point to cut point
HT-Changing of pin point to cut point
Erection of service connection materials-1Ph service
Erection of service connection materials-3Ph service
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
Dismantling of poles without concrete in damaged condition including grill separation etc.,
Providing jumpering at cut point
complete replacement of worn out earth wire per structure
Labour for manufacturing of open type fuse unit (Materials supplied by board)
Manufacturing of HG fuse stool incl. materials
Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees Each labour/head/day
Tree clearence in HT or LT location- For coconut trees and Palmrah trees Each labour/head/day
Painting-Double pole Transformer structure materials (Double coat) Excluding cost of paint
Painting-Double pole Transformer structure materials (Double coat) including cost of paint
Painting-Pole (Colour washing with distember) 2 Nos Excluding cost of paint
Painting-Pole (Colour washing with distember) 2 Nos including cost of paint
For Transformer only ( Double coat) with paint
Numbering of poles with backround color paint
Numbering of Distribution Trnasformer (Painting and writing of name board size-1-1/4*1 incl cost of paint and MS sheet
Writing in seating channel (Paint to be supplied by contractor)
Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by contractor
Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by contrcator
Set right of leaning HT pole/LT pole including x arms, TI fittings
Transformer structure erection-Excavation of structure pole pits (2 Nos)
Transformer structure erection-Erection of structure poles ( 2 Nos)
Transformer structure erection-Excavation of stay pits(4Nos)
Transformer structure erection-Erection of stay set (4Nos)
Transformer structure erection-Concreting of structure poles incl.materials mass concrete with coping
Transformer structure erection-Concreting of stays (4Nos) incl.materials
Erection of Structure materials-Top Channel
Erection of Structure materials-Transformer seating channel and belting angle
Erection of Structure materials-AB switch (Complete)
Erection of Structure materials-HG fuse (Complete)
Erection of Structure materials-Jumpering
Erection of Structure materials-HT LAS
Erection of Structure materials-LT LAS
Erection of Structure materials- Transformer LT cable wiring/LT Bus Bar
Erection of Structure materials-Erection of LT open type fuse unit including cable jumbering upto the line including cutting welding,bending,fabrication etc
Earthing system-Excavation of 4 Nos. earth pits
Earthing system-Excavation of earth wire trenches and paving of earth wire, Erection of 4 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection
Earthing system-Mason works for earth pits 4 nos (cement supplied by Contractor)
Earthing system-Painting of transformer structure 2 coats including paint cost
Earthing system-Painting with Distember paint on poles with paint cost
Earthing system-Spreading yard jelly and cut stone and bricks including material
Earthing system-Writing of name board and target board
Transporting of structure materials ABS,HG fuse,cable etc except pole
Fixing of danger board (labour only)
Erection of Tapping structure-Excavation of structure pole pit.
Erection of Tapping structure-Erection of structure pole.
Erection of Tapping structure-Excavation of stay pit.
Erection of Tapping structure-Erection of stay set.
Erection of Tapping structure-Concreting of pole including mass concrete with coping
Erection of Tapping structure-Concreting of stay.
Erection of Structure materials-Top channel
Erection of Structure materials-AB switch (complete)
Erection of Structure materials-Assemble, operating pipe fixing etc., fixing of cross bracing
Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure.
Earthing system-Mason works for earth pit (including material)
Colour coating on poles with iron materials including paint and distember
Transporting of 42' twin RSJ pole from roadside pole pit
Fabrication of 42' Twin RSJ pole, Materials supplied by Board.
Excavation & Erection of Twin 42'2' fabricated RSJ pole
Concreting of 42' twin RSJ pole
Loading & unloading of 42' twin RSJ pole
Resagging
Dismantling of 7.5m /8m pole with out damage
Dismantling of 9.14m pole/ RSJ with out damage
Dismantling of stay set complete
Replacement of detoriated stay rod
Replacement of RSJ/Tubular poles below 30 feet
Replacement Of RSJ/Tubular poles aove 30 feet
Dismantling of detoriated cables of various size(95,120,185 sq.mm) from DT,LT bushing to LT open type clamp and erection of suitable lug at both ends
Replacement of new 10' earth pipe replacing the corroded earth pipe and renewal of earthing including burying , looping and binding
Mass Concrete for poles on the line ( All Materials including cement Ratio 1:2:4) ( 1 Loc ( 0.72 m3) (0.65*0.65*1.65 m,0.6*0.6*0.35 Cum)
Sleeve Concrete for poles on the line ( All Materials including cement Ratio 1:2:4) ( 1 Loc ( 0.202 ) (0.5*0.45*0.9M)
Providing of Spacers in LT Lines
Hiring of JCB
Hiring of Crane
Exceeding 1 Hour for every hour
Transporting of Charges of DT / Line materials using private vehicle upto 20 KM ( Up and Down)
Beyond 20 KM for every KM
Single pole structure -Excavation of structure pole pit 3’ x 6’ by using JCB or Manual
Single pole structure -Transportation of pole from road side to pole pit by using JCB or Manual
Single pole structure -Erection of poles by using JCB or Manual
Single pole structure -Excavation of stay pit by JCB or Manual
Erection of stay set complete
Mass concreting for structure
Stay Concrete
Single pole structure -Erection of Structure materials- Tapping channel
Single pole structure -Erection of Structure materials- Transformer Bed Stucture
Single pole structure -Erection of AB switch
Single pole structure -Erection of H.G. Fuse
Single pole structure -Structure earthing complete with 3 pits and earth loops
Single pole structure -Fixing of MCD Box
Single pole structure -HT-LAS fixing
Single pole structure -LT-LAS fixing
Single pole structure -HT jumpering complete
Single pole structure -Painting of all clamps and other iron materials and painting of stucture pole
Single pole structure -LT cable arrangement
Single pole structure -Fixing of danger board
Erection of Double Pole Transformer structure-Excavation of structure pole pits (2 No's)
Erection of Double Pole Transformer structure - Erection of structure poles (2 No's)
Erection of Double Pole Transformer structure - Excavation of stay pits (4 No's)
Erection of stay set (4 Nos)
Erection of Double Pole Transformer structure - Concreting of structure poles including materials Mass Concrete with Copping
Concreting of stays (4 Nos) including all material
Erection of Structure materials -Top channel
Erection of Structure materials -Transformer seating channel and belting angle
Erection of Structure materials- AB switch (complete)
Erection of Structure materials- HG Fuse (complete)
Jumpering
HT LAS
LT LAS
Transformer LT cable wiring / LT Bus Bar
Erection of LT Open type fuse unit including cable jumbering up to the line including cutting welding bending ,fabrication etc
Earthing system - Excavation of 4 Nos. earth pits
Earthing system -Excavation of earth wire trenches and paving of earth wire, Erection of 3 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection
Earthing system -Mason works with Bricks for 4 Nos.earth pits and structure pole coping (cement supplied by Contractor)
Earthing system -Painting of transformer structure 2 coats including paint Cost
Earthing system -Painting with Distember paint on poles including paint Cost
Spreading yard jelly and cut stone and bricks including material
Writing of name board and target board including paint Cost
Transporting of Structure materials ABS,HG Fuse,cable etc Except Pole
Fixing Of Danger Board
Dismantling charges
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .