| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹1.1 Cr+₹3.7 L (3.37%)Rejected-Finance | ₹1.1 Cr+₹3.7 L (3.37%) | L2 | Rejected-Finance Highest Rate |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
5 Jul 2023, 3:00 pmClosed
Additional Collector (Dev)/Project Director
DRDA Office, 2nd Floor, New Collectorate, Thanjavur
Thanjavur District - Package No.06 - Strengthening and 5 years Maintenance of 4 Road works in Budalur Block under MGSMT - 2022-2023.
2023_RDTN_330841_1
DIPR/2987/Tender/2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Budalur
As per Tender document
9 documents required · 9 mandatory
₹0
₹1.1 L
31 Aug 2023
23 Jun 2023
5 Jul 2023
23 Jun 2023
5 Jul 2023
23 Jun 2023
Amount
Part.1. Strengthening and 5 years maintenance of Strengthening of Sukkambar road in Kovilady Panchayat Km 0/0-0/830,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A.
Picking the existing B.T surface and sectioning upto 50 mm - 100 mm thick including all labour charges including all labour charges etc,. complete.
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Collection and Supply of Soling U.S.gravel from approved quarry including cost and conveyance to worksite to standard departmental gauge for taking pre-measurement and all other labour charges for spreading complete with standard specifications etc., comp
Providing and laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sq.m area, thickness of 2.5 mm is exclusive of surface apllied glass beads as per IRC : 35. The finished surface to be level , uniform and free from streaks and holes etc complete as per MORT &H specification No.803.
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete.
Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete.
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost.
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part.2. Strengthening and 5 years maintenance of Maickelpatti atrangarai salai in Maickelpatti Panchayat Km 0/0-1/040,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A.
Picking the existing B.T /mettaled surface and sectioning upto 50 mm - 100 mm thick including all labour charges including all labour charges etc,. complete.
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.
Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Collection and Supply of Soling U.S.gravel from approved quarry including cost and conveyance to worksite to standard departmental gauge for taking pre-measurement and all other labour charges for spreading complete with standard specifications etc., comp
Providing and laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sq.m area, thickness of 2.5 mm is exclusive of surface apllied glass beads as per IRC : 35. The finished surface to be level , uniform and free from streaks and holes etc complete as per MORT &H specification No.803.
Supplying and fixing Kilo Metre stones including painting and lettering as directed by the departmental officers etc., complete.
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete.
Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete.
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost.
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part.3. Strengthening and 5 years maintenance of Thiruchenampoondi Monndrukumili Elankattipadugai salai in Thirchenampoondi Panchayat Km 0/0-1/400
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Picking the existing B.T /mettaled surface and sectioning upto 50 mm - 100 mm thick including all labour charges including all labour charges etc,. complete.
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.
Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Collection and Supply of Soling U.S.gravel from approved quarry including cost and conveyance to worksite to standard departmental gauge for taking pre-measurement and all other labour charges for spreading complete with standard specifications etc., comp
Providing and laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sq.m area, thickness of 2.5 mm is exclusive of surface apllied glass beads as per IRC : 35. The finished surface to be level , uniform and free from streaks and holes etc complete as per MORT &H specification No.803.
Supplying and fixing Kilo Metre stones including painting and lettering as directed by the departmental officers etc., complete.
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete.
Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete.
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost.
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part.4. Strengthening and 5 years maintenance of Koothur-Komakudi road in Vittalapuram Panchayat Km 0/0-0/310
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A.
Picking the existing B.T /mettaled surface and sectioning upto 50 mm - 100 mm thick including all labour charges including all labour charges etc,. complete.
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.
Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Collection and Supply of Soling U.S.gravel from approved quarry including cost and conveyance to worksite to standard departmental gauge for taking pre-measurement and all other labour charges for spreading complete with standard specifications etc., comp
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle etc. complete complying with the standard specificaiton
Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Retro-Reflectorised Traflic Signs (with definition board) Type IV - Providing and erecting of Retro-Reflectorised Cautionary, Mandatory and Informatory signs (with definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTMD 4956-09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2. lOm from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrète 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 (as per MORT&H Specification No.801)
Cautionary sign board
Providing and laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sq.m area, thickness of 2.5 mm is exclusive of surface apllied glass beads as per IRC : 35. The finished surface to be level , uniform and free from streaks and holes etc complete as per MORT &H specification No.803.
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete.
Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete.
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost.
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}.
CSB CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .