Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.8 LAccepted-AOC | ₹24.8 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹24.9 LRejected-AOC NO 2 325 SOUTH STREET Z KULATHUR POST ANDIMADAM TALUK ARIYALUR DISTRICT | ARIYALUR | TAMIL NADU | ₹24.9 L | L2 | Rejected-AOC L2 Rejected |
| Sl No | Description | Qty | Unit | Shuruthi Engineering L2 | CHANDRASEKARAN C L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 702 | Cum | 7 ₹4,914 | 6.3 ₹4,422.60 |
| 2.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 117 | Cum | 143 ₹16,731 | 140.4 ₹16,426.80 |
| 3.00 | Collection and supply of gritty gravel from approved quarry including cost and conveyance of all materilas to site including all labour charges | 49.8 | Cum | 595 ₹29,631 | 591.1 ₹29,436.78 |
| 4.00 | Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 25mm using 13.20mm IRC size HBG metal | 11.45 | Cum | 5,063 ₹57,971.35 | 5,034 ₹57,639.30 |
| 5.00 | Providing and applying Tack Coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2.50kg/10sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 503specification. | 5,962.5 | Sqm | 35 ₹2.1 L | 34.4 ₹2.1 L |
| 6.00 | Providing and laying Bituminious concrete to 25/30/40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 149.07 | Sqm | 11,950 ₹17.8 L | 11,911.6 ₹17.8 L |
| 7.00 | Supplying and fixing of Hectameter Stone | 7 | No | 574.6 ₹4,022.20 | 574.6 ₹4,022.20 |
| 8.00 | Supplying and fixing of Kilometer Stone | 1 | No | 2,197 ₹2,197 | 2,197 ₹2,197 |
| 9.00 | Provision for Name board | 1 | No | 4,500 ₹4,500 | 4,500 ₹4,500 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work} | 1 | GST Amount (in Rupees) | 3,79,807.3 ₹3.8 L | 3,77,895.04 ₹3.8 L |
Tender Value
₹25.0 L
EMD Value
₹24,990
Closing Date
16 Feb 2026, 4:00 pmClosed
The Block Development Officer(BP)
Panchayat Union, Ariyalur
Renovation of BT road from Periyanagalur to Mannuli road in Thelur Panchayat
2026_RDTN_658599_1
RC.No.A4/2495/2024, Date.06.02.2026
Open Tender
Civil Works - Roads
90 days
Ariyalur
As per tender document
5 documents required · 5 mandatory
₹0
₹24,990
24 Mar 2026
16 Feb 2026
16 Feb 2026
16 Feb 2026
16 Feb 2026
16 Feb 2026
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of gritty gravel from approved quarry including cost and conveyance of all materilas to site including all labour charges
Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 25mm using 13.20mm IRC size HBG metal
Providing and applying Tack Coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2.50kg/10sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 503specification.
Providing and laying Bituminious concrete to 25/30/40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Supplying and fixing of Hectameter Stone
Supplying and fixing of Kilometer Stone
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
TechnicalBid1.pdf
Tender Documents • 0.41 MB
PriceBid1.pdf
Tender Documents • 0.12 MB
BOQ_790103.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid