| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-AOC | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹29.0 L+₹1.4 L (5.01%)Rejected-Finance RZ 140 A EAST SAGARPUR STREET NO 7 8 NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L2 | Rejected-Finance OTHER THAN L1 | |
| 3 | L3₹29.1 L+₹1.5 L (5.31%)Rejected-Finance FUG FARM VIEW APARTMENTS KHASRA NO 40 SATBARI CHATARPUR HAUZ KHAS SOUTH DELHI NEW DELHI 110074 | NEW DELHI | SOUTH DELHI | DELHI | 110074 | L3 | Rejected-Finance OTHER THAN L1 | |
| 4 | L4₹29.9 L+₹2.3 L (8.44%)Rejected-Finance A 3 257 JANAKPURI NEW DELHI 110058 | WEST DELHI | DELHI | 110058 | L4 | Rejected-Finance OTHER THAN L1 | |
| 5 | L5₹30.8 L+₹3.2 L (11.5%)Rejected-Finance THIRD FLOOR RIGHT SIDE H NO 835 KAPASHERA NEW DELHI 110037 | NEW DELHI | NEW DELHI | DELHI | 110037 | L5 | Rejected-Finance OTHER THAN L1 |
| Sl No | Description | Qty | Unit | Deven Associates L2 | SALUJA CONSTRUCTION CO L6 | jain associates L1 | M/S ADHIKARI CONSTRUCTION CO. L4 | M/S DK Constructions co. L7 | RS GREEN INDIA CONSTRUCTION L5 | R S ENGINEERS L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 metre depth and getting out in any type of soil for taking out/laying of pipe complete all as specified and as directed | 715 | CUM | 89 ₹63,635 | 70 ₹50,050 Lowest | 110 ₹78,650 | 99 ₹70,785 | 100 ₹71,500 | 100 ₹71,500 | 111 ₹79,365 |
| 2.00 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc. 25 cm thick complete all as specified and directed. | 643 | CUM | 9 ₹5,787 Lowest | 50 ₹32,150 | 50 ₹32,150 | 9 ₹5,787 Lowest | 80 ₹51,440 | 80 ₹51,440 | 61 ₹39,223 |
| 3.00 | Removal of excavated material from site to a distance not exceeding 50 meters away and depositing where directed at a level not exceeding 1.5 meters above the starting point complete all as specified and directed. | 71 | CUM | 49 ₹3,479 | 40 ₹2,840 | 150 ₹10,650 | 9 ₹639 Lowest | 100 ₹7,100 | 80 ₹5,680 | 179 ₹12,709 |
| 4.00 | M&L Boring holes under road pavement by bocky manually in any type of soil upto 200 mm bore complete all as specified and directed by Engr-in-Charge.
(Note:-Location & depth of trenchless boring is as directed by EIC. | 100 | RM | 299 ₹29,900 | 500 ₹50,000 | 380 ₹38,000 | 399 ₹39,900 | 1,700 ₹1,70,000 | 500 ₹50,000 | 213 ₹21,300 Lowest |
| 5.00Supply, laying jointing, testing of DI pipe with class-K-7 spigot socketed ends, conforming to IS-8329 laid in trenches including providing route indicators of suitable height and laying at spacing of @ 50m center to center at GL mentioning name of contractor, date of execution & CA No with name of work & rubber gasket (Tyton) joints with jointing material & route indicators of the following sizes including taking down of existing CI/DI pipe complete all as specified and directed by Engineer-in-Charge. Note 1: - Excavation & earth work shall be measured and paid seperately under respective items of BOQ. Note 2:- Contractors will provide route indicators mild steel body with top 150 mm plate 3mm thick and height not less than 300mm above finished GL at suitable intervals as directed by EIC. Cost of route indicators shall be deemed included in quoted unit rates. Note 3:- Layout plan for laying of DI pipe shall be given by EIC in writing. Note 4 :- Cost of Rubber gasket joints (Tyton Joint) included in quoted unit rates. | ||||||||||
| 5.01 | 80 mm bore | 400 | RM | 899 ₹3,59,600 | 990 ₹3,96,000 | 700 ₹2,80,000 Lowest | 799 ₹3,19,600 | 955 ₹3,82,000 | 800 ₹3,20,000 | 799 ₹3,19,600 |
| 5.02 | 100 mm bore | 500 | RM | 999 ₹4,99,500 | 1,050 ₹5,25,000 | 820 ₹4,10,000 Lowest | 1,059 ₹5,29,500 | 1,275 ₹6,37,500 | 900 ₹4,50,000 | 948 ₹4,74,000 |
| 5.03 | 150 mm bore | 900 | RM | 1,299 ₹11,69,100 | 1,500 ₹13,50,000 | 1,176 ₹10,58,400 | 1,149 ₹10,34,100 Lowest | 1,800 ₹16,20,000 | 1,280 ₹11,52,000 | 1,322 ₹11,89,800 |
| 5.04 | 200 mm bore | 110 | RM | 1,099 ₹1,20,890 Lowest | 1,800 ₹1,98,000 | 1,550 ₹1,70,500 | 1,499 ₹1,64,890 | 2,200 ₹2,42,000 | 1,680 ₹1,84,800 | 1,655 ₹1,82,050 |
| 6.00 | Material and Labour for DI fittings/specials such as Tees, bends (any type, radius and angle) tapers any type, collars, tail pieces, caps and plugs upto 200 mm dia sizes confirming to IS: 9523 complete all as specified and directed by Engr-in-Charge. | 175 | KG | 79 ₹13,825 | 100 ₹17,500 | 60 ₹10,500 | 149 ₹26,075 | 145 ₹25,375 | 100 ₹17,500 | 51 ₹8,925 Lowest |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
17 Sept 2025, 6:00 pmClosed
GE(U)(W/S) DELHI CANTT
GE(U)(W/S) DELHI CANTT 110010
REPAIR/MAINTENANCE/REPLACEMENT OF WATER PIPE LINE AT RRRC AREA, LORRY ROAD, ARMY TRAINING AREA, DK PART-I IN THE AREA OF AGE (U) WATER SUPPLY NO-II UNDER GE (U) WATER SUPPLY, DELHI CANTT-10
2025_MES_726770_1
GE/WS/Token No-22 OF 2025-26
Open Tender
Civil Works
Item Rate
180 days
GE(U)(W/S) DELHI CANTT 110010
AS PER NIT AND TENDER DOCUMENTS
6 documents required · 6 mandatory
₹500
GE(U)(W/S) DELHI CANTT
₹90,000
31 Oct 2025
20 Aug 2025
19 Sept 2025
20 Aug 2025
17 Sept 2025
4 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .