| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 CrAccepted-AOC GORAKHPUR | UTTAR PRADESH | 273001 | ₹10.7 Cr | L1 | Accepted-AOC R |
| 2 | L2₹10.9 CrRejected-Finance 0 | ₹10.9 Cr | L2 | Rejected-Finance RBCM |
| 3 | L3₹11.8 CrRejected-Finance | ₹11.8 Cr | L3 | Rejected-Finance RBCM |
| 4 | L4₹14.6 CrRejected-Finance PROP PODDAR SONS SANJEEV PODDAR PODDAR SONS 19 GURUDWARA COMPLEX SEVOKE ROAD SEVOKE ROAD SILIGURI WESTBENGAL 734001 | JALPAIGURI | WEST BENGAL | 734001 | ₹14.6 Cr | L4 | Rejected-Finance RBCM |
| 5 | L5₹14.7 CrRejected-Finance | ₹14.7 Cr | L5 | Rejected-Finance RBCM |
Tender Value
₹16.8 Cr
EMD Value
₹30 L
Closing Date
16 Jan 2025, 12:00 pmClosed
basti circle
basti circle
JANPAD SIDDHARTHNAGAR ME BHARAT NEPAL ANTARRASHTRIYA SEEMA PER BARHNI BAYPASS 04 LEN MARG KE NIRMAN KA KARYA
2024_CEUBZ_988393_1
5574/4E Nivida-basti Circle/2024 dt. 06.12.2024
Open Tender
Civil Works
455 days
basti circle
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,254
₹30 L
basti circle
1 Aug 2025
31 Dec 2024
16 Jan 2025
31 Dec 2024
16 Jan 2025
31 Dec 2024
2 Jan 2025
Amount
Clearing jungle including uprooting of rank, vegetations, grass, bush, wood trees and saplings of girth upto 30 Cm. Measured at a height of 1 metre above ground level and removal of rubbish upto distance of 50 m. outside the periphery of area cleared.. Analysis of rate on the basis of item 41 of CPWD analsis of 1S55 schedule)
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.
Construction of Embankment and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of sub-grade with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (27.078+29.176)/2
Construction of granular sub-base by providing Close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller to achieve the desired density, complete as per technical clause 401
Providing, laying, spreading and compacting graded stone aggregate in layers wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to Stabilized wet mix mcacdam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC Cement+3.50% Emulsion in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of Morth specification. (ETA)
Providing and applying tack coat with bitumen VG-10 by pressure distributor at the rate of 0.30 kg per sqm on the prepared Bituminous/Granular surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and applying tack coat with bitumen VG-10 by pressure distributor at the rate of 0.25 kg per sqm on the prepared Bituminous/Granular surface cleaned with mechanical broom.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M15 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
Construction of Median and Island (earth work) above road level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures, spread, graded and compacted as per clause 408
Construction of earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of K.C Drain
Consrruction of Chute Drain Work @ 20 Mtr C/c
Construction of 900 mm & 600 Hume Pipe Culvert Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side as per MORD 11.1 (Rates are exclusive of GST to be paid extra)
Providing concrete for plain concrete (1:3:6) M-10 grade in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. (Rates are exclusive of GST to be paid extra)
Class 150 sub-class 'A' brick in cement mortar 1:3 cement & approved course sand mortor in foundation and super structure including supply of all material, labour, T&P etc. required for proper completion of work, As per SI No 307 (Rates are exclusive of GST to be paid extra)
Stuck pointing with cement morter consisting of 1 part of cement and two part of fine sand of 1:25 FM on brick work including racking the joints washing and celaning and supply of all material labour T&P etc. required for proper completion of work (Rates are exclusive of GST to be paid extra)
Providing and laying of Hume pipe 900 mm dai Including cartage
Providing and laying of Hume pipe 600 mm dai Including cartage
M/S RAJ CONSTRUCTION (BID ID -4858776)
M/s Nirbhay Constructions (BID ID -4841676)
NIRANJAN LAL SHYAM SUNDER (BID ID -4854602)
PODDAR AND SONS (BID ID -4857378)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf