Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹44.2 LAdmitted-Finance | -42.05% | ₹44.2 L | L1 | Admitted-Finance |
| 2 | L2₹49.6 L+₹5.4 L (12.2%)Admitted-Finance | -35.00% | ₹49.6 L+₹5.4 L (12.2%) | L2 | Admitted-Finance |
| 3 | L3₹49.8 L+₹5.6 L (12.8%)Admitted-Finance | -34.65% | ₹49.8 L+₹5.6 L (12.8%) | L3 | Admitted-Finance |
| 4 | L4₹49.9 L+₹5.8 L (13.0%)Admitted-Finance | -34.50% | ₹49.9 L+₹5.8 L (13.0%) | L4 | Admitted-Finance |
| 5 | L5₹50.9 L+₹6.7 L (15.1%)Admitted-Finance | -33.30% | ₹50.9 L+₹6.7 L (15.1%) | L5 | Admitted-Finance |
Tender Value
₹76.2 L
EMD Value
₹1.8 L
Closing Date
7 Apr 2026, 4:00 pmClosed
Executive Engineer construction division Leh.
Executive Engineer construction division Leh.
Construction of Community Hall at Chemday Dho Balance Work
2026_PWD_18652_2
185 of CDL Leh of 2025-26
Open Tender
Civil Works - Buildings
Percentage
120 days
Leh
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Executive Engineer construction division Leh.
₹1.8 L
10 Apr 2026
18 Mar 2026
8 Apr 2026
19 Mar 2026
7 Apr 2026
19 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil | - | cum | 208.42 | - |
| 2 | Ordinary rock | - | cum | 1,095.42 | - |
| 3 | Dumping Stone including cost of stone. in Horizontal on level | - | cum | 953.03 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 5,725.33 | - |
| 5 | Providing and fixing up to floor five level precast cement concrete solid block,including hoisting and setting in position with cement mortar 1:3 (1 cement : 3coarse sand), cost of required centering, shuttering complete :1:3:6 (1 Cement : 3 coarse sand :6 aggregate) | - | cum | 14,111.48 | - |
| 6 | Pebble dash plaster upto 10 m height above ground level with a mixture of washed pebble or crushed stone 6 mm to 12.5 mm nominal size, dashed over and including fresh plaster in two layers under layer 12 mm cement plaster 1:4 (1 cement : 4 coarse sand) and top layer 10 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 10% finely grounded hydrated lime by volume of cement. | - | sqm | 727.89 | - |
| 7 | CEMENT PLASTER (IN FINE SAND) 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) | - | sqm | 310.19 | - |
| 8 | 6 mm cement plaster to ceiling of mix 1:3 (1 cement : 3 fine sand) | - | cum | 257.87 | - |
| 9 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. | - | sqm | 239.53 | - |
| 10 | Finishing walls with water proofing cement paint of required shade on New work (Two or more coats applied @ 3.84 kg/10 sqm) | - | sqm | 100.07 | - |
stage.html
html • 0.04 MB
techsummary_44701.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_44701.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .