| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.4 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹24.8 L+₹1.3 L (5.74%)Rejected-Finance NOT AVAILABLE | FARIDABAD | HARYANA | 121004 | L2 | Rejected-Finance L2 | |
| 3 | L3₹25.0 L+₹1.6 L (6.78%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹25.4 L+₹1.9 L (8.16%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹25.7 L+₹2.3 L (9.84%)Rejected-Finance VILL BANOUN PO JABRI TEHSIL DISTT SHIMLA HP | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | NOKH RAM SHARMA L5 | Yog Raj L2 | Bharat Singh Verma L4 | PAWAN SETH L1 | Rahul Thakur L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches,etc. in earth work in all kinds of soil such as pick work, jumper work,blasting work, hard blasting and chiselling etc. stacking the excavated soil not more than 3 mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into plinths sides of foundations etc.then disposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lifts.complete in all respect and to the entire satisfaction of the Engineer-in-charge. | 3.6 | Cum. | 320 ₹1,152 Lowest | 350 ₹1,260 | 338 ₹1,216.8 | 721 ₹2,595.6 | 325 ₹1,170 |
| 2.00 | Excavation in drains and channels etc. in earth work for pipes upto all depth in all classification of earth work such as pick work, jumper work, saturated soil i/c balling or pumping out water , blasting soft /hard rock or chiseling soft/ hard rock where blasting is prohibited in all lifts including jungle clearance wherever required, trimming and dressing of sides, levelling of beds to correct grade including shoring /struting, planking, timbering and dewatering wherever required stacking the useable /unusable material/soil seperately and after laying,jointing and testing of pipes ,returning the useable soil in treches in 15 cm layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads and lifts including restoration of un-metalled surfaces to its original condition and including cost of diversion for traffic, night signals, fixing caution boards,crossing over trenches for access to houses, fencing etc. complete in all respect whithin all leads and lifts as per direction of the Engineer-in-charge. | 887.5 | Cum. | 320 ₹2,84,000 | 320 ₹2,84,000 | 308 ₹2,73,350 | 251 ₹2,22,762.5 | 250 ₹2,21,875 Lowest |
| 3.00 | Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 0.9 | Cum. | 7,200 ₹6,480 | 4,000 ₹3,600 Lowest | 5,800 ₹5,220 | 7,621 ₹6,858.9 | 6,500 ₹5,850 |
| 4.00Providing and laying cement concrete work 1:11/2: 3(M20) (1cement:1 1/2sand:3 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-charge. | ||||||||
| 4.01 | Foundations footings, bases of columns and the like and mass concrete. | 0.43 | Cum. | 11,000 ₹4,730 | 7,000 ₹3,010 Lowest | 9,000 ₹3,870 | 12,201 ₹5,246.43 | 9,000 ₹3,870 |
| 4.02 | Walls (any thickness) but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level. | 0.69 | Cum. | 11,000 ₹7,590 | 8,000 ₹5,520 Lowest | 9,000 ₹6,210 | 12,151 ₹8,384.19 | 9,000 ₹6,210 |
| 4.03 | Suspended floors, roofs, landings,shelves and their supports balconies, beams, girders, bressumers and cantilevers upto floor two level. | 0.13 | Cum. | 11,000 ₹1,430 | 8,000 ₹1,040 Lowest | 9,000 ₹1,170 | 12,351 ₹1,605.63 | 9,000 ₹1,170 |
| 5.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting , strutting and propping etc. with wooden, battens, and ballies, height of propping and centring below supporting floor to ceiling not exceeding 3 mtrs.and removal of the same for insitu reinforced concrete and plain concrete work in complete in all respect i/c all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | ||||||||
| 5.01 | Foundations footings, basis of columns and the like and mass concrete. | 1.02 | Sqmt. | 300 ₹306 | 280 ₹285.6 | 100 ₹102 Lowest | 301 ₹307.02 | 150 ₹153 |
| 5.02 | Vertical surfaces such as walls (any thickness) ,partitions and the like including attached pillasters,buttresses, plinth and string courses and the like. | 10.76 | Sqmt. | 290 ₹3,120.4 | 370 ₹3,981.2 | 400 ₹4,304 | 411 ₹4,422.36 | 285 ₹3,066.6 Lowest |
Tender Value
₹30.0 L
EMD Value
₹60,100
Closing Date
26 Aug 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division No-I Kasumpati Shimla-9(HP)
.
2026_HPIPH_141254_1
Kasumpti/ shimla/ LWSS Durgapur/ Rs. 30.03
Open Tender
Civil Works - Water Works
Item Rate
180 days
Kasumpti
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
EE Jal Shakti Division No-I Kasumpati Shimla-9
₹60,100
14 Sept 2026
14 Aug 2026
26 Aug 2026
14 Aug 2026
26 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches,etc. in earth work in all kinds of soil such as pick work, jumper work,blasting work, hard blasting and chiselling etc. stacking the excavated soil not more than 3 mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into plinths sides of foundations etc.then disposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lifts.complete in all respect and to the entire satisfaction of the Engineer-in-charge. | 3.6 | Cum. | 100 | ₹360 |
| 2 | Excavation in drains and channels etc. in earth work for pipes upto all depth in all classification of earth work such as pick work, jumper work, saturated soil i/c balling or pumping out water , blasting soft /hard rock or chiseling soft/ hard rock where blasting is prohibited in all lifts including jungle clearance wherever required, trimming and dressing of sides, levelling of beds to correct grade including shoring /struting, planking, timbering and dewatering wherever required stacking the useable /unusable material/soil seperately and after laying,jointing and testing of pipes ,returning the useable soil in treches in 15 cm layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads and lifts including restoration of un-metalled surfaces to its original condition and including cost of diversion for traffic, night signals, fixing caution boards,crossing over trenches for access to houses, fencing etc. complete in all respect whithin all leads and lifts as per direction of the Engineer-in-charge. | 887.5 | Cum. | 100 | ₹88,750 |
| 3 | Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 0.9 | Cum. | 100 | ₹90 |
| 4Providing and laying cement concrete work 1:11/2: 3(M20) (1cement:1 1/2sand:3 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-charge. | |||||
| 4.01 | Foundations footings, bases of columns and the like and mass concrete. | 0.43 | Cum. | 100 | ₹43 |
| 4.02 | Walls (any thickness) but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level. | 0.69 | Cum. | 100 | ₹69 |
| 4.03 | Suspended floors, roofs, landings,shelves and their supports balconies, beams, girders, bressumers and cantilevers upto floor two level. | 0.13 | Cum. | 100 | ₹13 |
| 5Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting , strutting and propping etc. with wooden, battens, and ballies, height of propping and centring below supporting floor to ceiling not exceeding 3 mtrs.and removal of the same for insitu reinforced concrete and plain concrete work in complete in all respect i/c all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | |||||
| 5.01 | Foundations footings, basis of columns and the like and mass concrete. | 1.02 | Sqmt. | 100 | ₹102 |
| 5.02 | Vertical surfaces such as walls (any thickness) ,partitions and the like including attached pillasters,buttresses, plinth and string courses and the like. | 10.76 | Sqmt. | 100 | ₹1,076 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
form8.pdf
Tender Documents • 0.91 MB
Terms.pdf
Tender Documents • 0.05 MB
6.pdf
Tender Documents • 0.19 MB
BOQ_209649.xls
BOQ • 0.29 MB
Corigendum.pdf
PDF • 1.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .