| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.2 LAccepted-AOC | ₹35.2 L Quoted ₹35.6 L | L1 | Accepted-AOC Accepted due to lowest rate quoted |
| 2 | L2₹39.4 L+₹3.8 L (10.6%)Rejected-Finance | ₹39.4 L+₹3.8 L (10.6%) | L2 | Rejected-Finance Rejected due to highest rate quoted |
| 3 | L3₹44.2 L+₹8.6 L (24.2%)Rejected-Finance A 47D RAM DUTT ENCLAVE UTTAM NAGAR NEW DELHI 110059 | WEST | DELHI | 110059 | ₹44.2 L+₹8.6 L (24.2%) | L3 | Rejected-Finance Rejected due to highest rate quoted |
| 4 | L4₹44.5 L+₹8.9 L (24.9%)Rejected-Finance | ₹44.5 L+₹8.9 L (24.9%) | L4 | Rejected-Finance Rejected due to highest rate quoted |
| 5 | L5₹45.5 L+₹9.9 L (27.8%)Rejected-Finance | ₹45.5 L+₹9.9 L (27.8%) | L5 | Rejected-Finance Rejected due to highest rate quoted |
| Sl No | Description | Qty | Unit | M/s.sagar enterprises L1 | akhil enterprises L3 | MAA VAISHNO INDUSTRIES L2 | M/S DABAS CONSTRUCTIONS L5 | Mohd Talha L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of roof treatment any thickness including APP, roof tiles, screed bed or plastering and remove the rubist materials outside MOD land at a dumping place marked by any state govt/municipalities etc any distance complete all as specified and directed. | 1,950 | Sqm | 2 ₹3,900 Lowest | 40 ₹78,000 | 5 ₹9,750 | 50 ₹97,500 | 10 ₹19,500 |
| 2.00 | M&L 15 mm thick cement plaster in CM (1:4) mixed with WPC as per manufacturer’s instructions @ 3% by weight of cement on concrete surfaces, finished even and smooth without using extra cement complete all as specified and directed. Note : WPC shall be measured and paid separately. | 1,750 | Sqm | 100 ₹1,75,000 Lowest | 180 ₹3,15,000 | 145 ₹2,53,750 | 200 ₹3,50,000 | 100 ₹1,75,000 Lowest |
| 3.00 | Supply only intergral water proofing compound ISI Marked complete all as specified | 500 | Kg | 20 ₹10,000 Lowest | 100 ₹50,000 | 20 ₹10,000 Lowest | 500 ₹2,50,000 | 50 ₹25,000 |
| 4.00 | M&L for water proofing treatment of roof consisting as under:- (a) Applying a tack coat of industrial bitumen 85/25 at the rate of 1.20 kg per sqm over a coat of primer @ 0.30 litre/ sq.m including preparation of roof surfaces (b) A layer of 3mm thick APP polymeric membrane of weight not less than 3.60 kg/sqm, reinforced with polyester non-woven polyester fabric (weight not less than 160gm/sqm), duly sealed at over laps & joints with flame (by torch application) all as per manufacturer’s instructions complete all as specified and directed. | 500 | Sqm | 300 ₹1,50,000 Lowest | 400 ₹2,00,000 | 500 ₹2,50,000 | 400 ₹2,00,000 | 400 ₹2,00,000 |
| 5.00 | Material and labour for roof treatment as follows:- (a) Applying one coat of SBR latex based bond coat using Latex Plus of Berger or equivalent after mixing with water and cement in ratio of 1:4:7 to improve the bonding between residual and PU coat. Allow to dry bond coat for 4-6 hours before applying PU coat and surface to be cleaned before applying PU coat (b) Applying two coats of single component, cold applied, water based polyurethane modified acrylic dispersion with highly elastic and UV resistant water proofing treatment to the roof with HS PU Roofkoat of Berger or Equivalent at 0.6 kg/per Sqm for each coat without dilution confirming to ASTM D 6083-97a (Standard Specification for Liquid Applied Acrylic Coating used In Roofing)Each coat should allow to dry 4-6 hours and sandwiching 40gsm Geo-textile between two coats. Spread 40gsm Geo textile over 1st coat when coat is wet condition The component shall have a density of 1.25 to 1.3kg/per Litre, having tensile strentgh of 1.5N/mm2, having elongation of 350% with solid content not less than 60% in 2 coats . SRI value should be more than 100. the quoted rate shall include surface prepartion,repair the crack in mother slab by chasing with cutting machine and fill the same with polymerized mortar in CM 1:4 admixed with latex agent of reputed manufacture, making coving at Junction, bore packing, treatment of construction joints completely as per manufacurer's specification and direction of the Engineer In Charge.
Make: Berger or Equivalent NOTE:- The above treatment shall be got carried out by the authorised applicator of the manufacturer approved by the GE | 1,250 | Sqm | 700 ₹8,75,000 | 750 ₹9,37,500 | 700 ₹8,75,000 | 450 ₹5,62,500 Lowest | 600 ₹7,50,000 |
| 6.00 | M&L for applying two coat of bitumenous aluminium paint over APP membrane complete all as specified and directed | 500 | Sqm | 20 ₹10,000 Lowest | 100 ₹50,000 | 50 ₹25,000 | 280 ₹1,40,000 | 50 ₹25,000 |
| 7.00 | Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) of any description in any position not specifically provided complete all as specified and directed. | 1 | Cum | 500 ₹500 | 100 ₹100 | 10 ₹10 Lowest | 300 ₹300 | 100 ₹100 |
| 8.00 | M&L Providing, reinforced cement concrete (1:2:4) type B-1 (using 20 mm graded stone aggregate) as in chajjas and the like etc complete all as specified and directed. | 1 | Cum | 6,500 ₹6,500 | 5,000 ₹5,000 | 6,000 ₹6,000 | 250 ₹250 Lowest | 5,000 ₹5,000 |
| 9.00 | M&L for TMT bars 10mm dia and over cut to length bent to shape required including cranking bending spirally for hopping for columns,hooking ends and binding with and including MS wire (annealed) not less than 0.90 mm dia confirming to TMT bars complete all as specified. | 100 | Kg | 80 ₹8,000 Lowest | 95 ₹9,500 | 90 ₹9,000 | 120 ₹12,000 | 100 ₹10,000 |
| 10.00 | M&L for form work to soffits of suspended slabs such as roof slabs, florslabs, landings and similar work not exceeding 200 mm thick rough finished in flat surface complete all as specified. | 12 | Sqm | 200 ₹2,400 Lowest | 350 ₹4,200 | 200 ₹2,400 Lowest | 300 ₹3,600 | 800 ₹9,600 |
Tender Value
₹46 L
EMD Value
₹92,000
Closing Date
12 Aug 2026, 6:00 pmClosed
GE (AF) GURGAON
GE (AF) GURGAON
REPAIR MAINTAINENECE OF ROOF TREATMENT WORK REPLACEMENT OF AC/CGI SHEET FALSE CEILING ALUMINIUM WORK ROLLING SHUTTER CAMOUFLAGE AND GATE AND CERTAIN MISC WORK AT CERTAIN PLACES AT AF STN ARJANGARH AND UNDER GE (AF) GURGAON
2026_MES_778837_1
GE/GUR-/NIT-50/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE (AF) GURGAON
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) GURGAON
₹92,000
11 Sept 2026
15 Jul 2026
14 Aug 2026
15 Jul 2026
12 Aug 2026
29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of roof treatment any thickness including APP, roof tiles, screed bed or plastering and remove the rubist materials outside MOD land at a dumping place marked by any state govt/municipalities etc any distance complete all as specified and directed. | 1,950 | Sqm | - | - |
| 2 | M&L 15 mm thick cement plaster in CM (1:4) mixed with WPC as per manufacturer’s instructions @ 3% by weight of cement on concrete surfaces, finished even and smooth without using extra cement complete all as specified and directed. Note : WPC shall be measured and paid separately. | 1,750 | Sqm | - | - |
| 3 | Supply only intergral water proofing compound ISI Marked complete all as specified | 500 | Kg | - | - |
| 4 | M&L for water proofing treatment of roof consisting as under:- (a) Applying a tack coat of industrial bitumen 85/25 at the rate of 1.20 kg per sqm over a coat of primer @ 0.30 litre/ sq.m including preparation of roof surfaces (b) A layer of 3mm thick APP polymeric membrane of weight not less than 3.60 kg/sqm, reinforced with polyester non-woven polyester fabric (weight not less than 160gm/sqm), duly sealed at over laps & joints with flame (by torch application) all as per manufacturer’s instructions complete all as specified and directed. | 500 | Sqm | - | - |
| 5 | Material and labour for roof treatment as follows:- (a) Applying one coat of SBR latex based bond coat using Latex Plus of Berger or equivalent after mixing with water and cement in ratio of 1:4:7 to improve the bonding between residual and PU coat. Allow to dry bond coat for 4-6 hours before applying PU coat and surface to be cleaned before applying PU coat (b) Applying two coats of single component, cold applied, water based polyurethane modified acrylic dispersion with highly elastic and UV resistant water proofing treatment to the roof with HS PU Roofkoat of Berger or Equivalent at 0.6 kg/per Sqm for each coat without dilution confirming to ASTM D 6083-97a (Standard Specification for Liquid Applied Acrylic Coating used In Roofing)Each coat should allow to dry 4-6 hours and sandwiching 40gsm Geo-textile between two coats. Spread 40gsm Geo textile over 1st coat when coat is wet condition The component shall have a density of 1.25 to 1.3kg/per Litre, having tensile strentgh of 1.5N/mm2, having elongation of 350% with solid content not less than 60% in 2 coats . SRI value should be more than 100. the quoted rate shall include surface prepartion,repair the crack in mother slab by chasing with cutting machine and fill the same with polymerized mortar in CM 1:4 admixed with latex agent of reputed manufacture, making coving at Junction, bore packing, treatment of construction joints completely as per manufacurer's specification and direction of the Engineer In Charge.
Make: Berger or Equivalent NOTE:- The above treatment shall be got carried out by the authorised applicator of the manufacturer approved by the GE | 1,250 | Sqm | - | - |
| 6 | M&L for applying two coat of bitumenous aluminium paint over APP membrane complete all as specified and directed | 500 | Sqm | - | - |
| 7 | Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) of any description in any position not specifically provided complete all as specified and directed. | 1 | Cum | - | - |
| 8 | M&L Providing, reinforced cement concrete (1:2:4) type B-1 (using 20 mm graded stone aggregate) as in chajjas and the like etc complete all as specified and directed. | 1 | Cum | - | - |
| 9 | M&L for TMT bars 10mm dia and over cut to length bent to shape required including cranking bending spirally for hopping for columns,hooking ends and binding with and including MS wire (annealed) not less than 0.90 mm dia confirming to TMT bars complete all as specified. | 100 | Kg | - | - |
| 10 | M&L for form work to soffits of suspended slabs such as roof slabs, florslabs, landings and similar work not exceeding 200 mm thick rough finished in flat surface complete all as specified. | 12 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TenderDocuments50.pdf
Tender Documents • 0.51 MB
BOQ_872317.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .