Loading…
Loading…
Tender Value
₹15 L
EMD Value
₹32,000
Closing Date
5 Sept 2026, 11:00 pm
Directorate of Municipal Administration
SHRUTHI B V
081922344441
CONSTRUCTION OF PIPE DRAIN AND OTHER WORKS IN SHIVARAM KARANTHA PARK IN WARD NO 25
DMA/2026-27/OW/WORK_INDENT61575
DMA/2026-27/OW/WORK_INDENT61575
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Davanagere
2 documents required · 2 mandatory
₹500
₹32,000
20 Aug 2026
20 Aug 2026
5 Sept 2026
CONSTRUCTION OF PIPE DRAIN AND OTHER WORKS IN SHIVARAM KARANTHA PARK IN WARD NO 25
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED)
pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work ...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting Each deposited layer by ramming after watering with a lea...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural ...
Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint...
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manuf...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work. Ref to MoRT&H : IRC - 301
Providing and fixing RCC name board of size 1.35x0.60x0.04 m fixed in reinforced cement concrete poles of size 0.10x0.10x2.60m in cement concrete M 20 proportion ...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding. For Earth retaining structures( vol-01 P NO 112 SL NO 11 ) FOUNDATION 3% OF FINISHED RATE OF CONCRETE
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding. For Earth retaining structures( vol-01 P NO 112 SL NO 11 ) PLINTH 50% OF FINISHED RATE OF CONCRETE
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding. For Earth retaining structures( vol-01 P NO 112 SL NO 11 ) COLUMN 70% OF FINISHED RATE OF CONCRETE
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-1- 61575 OTHERS.doc
Tender Document • 1.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].