Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹31.4 L+₹87,644.72 (2.87%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹32.9 L+₹2.3 L (7.52%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S USHA ENTERPRISES L3 | TECHCON ENGINEERS L2 | THE UNIVERSAL CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 10.00 | PART - A (Routine Maintenance of Compressor )Daily/Shift-wise maintenance of 07 No’s Air compressors, compressed air system round the clock | 730 | Job | 1,333 ₹9,73,090 | 1,275 ₹9,30,750 | 1,240 ₹9,05,200 Lowest |
| 20.00 | Part-B (Preventive & Breakdown Maintenance) Preventive /Breakdown Maintenance ofInter-cooler/After-cooler | 20 | Job | 988 ₹19,760 | 945 ₹18,900 | 919 ₹18,380 Lowest |
| 30.00 | Part-B (Preventive & Breakdown Maintenance) Preventive /Breakdown Maintenance of Pre-filter and After-filter | 8 | Job | 1,982 ₹15,856 | 1,895 ₹15,160 | 1,844 ₹14,752 Lowest |
| 40.00 | Part-B (Preventive & Breakdown Maintenance) Preventive /Breakdown Maintenance of Dryer, valves & accessories | 8 | Job | 1,725 ₹13,800 | 1,650 ₹13,200 | 1,605 ₹12,840 Lowest |
| 50.00 | Part-B (Preventive & Breakdown Maintenance) Preventive /Breakdown Maintenance ofAir Receivers | 14 | Job | 2,296 ₹32,144 | 2,196 ₹30,744 | 2,136 ₹29,904 Lowest |
| 60.00 | Part-B (Preventive & Breakdown Maintenance) Preventive/Breakdown maintenance of air compressors valves | 200 | Job | 130 ₹26,000 | 124 ₹24,800 | 121 ₹24,200 Lowest |
| 70.00 | Part-B (Preventive & Breakdown Maintenance) Inspection and attending leakage and breakdown of LP/HP of piston of compressor | 20 | Job | 2,478 ₹49,560 | 2,370 ₹47,400 | 2,306 ₹46,120 Lowest |
| 80.00 | Part-B (Preventive & Breakdown Maintenance) Inspection and attending leakage and breakdown of LP/HP cylinder linercylinder liner of compressor | 4 | Job | 7,451 ₹29,804 | 7,147 ₹28,588 | 6,952 ₹27,808 Lowest |
| 90.00 | Part-B (Preventive & Breakdown Maintenance) Servicing and attending fault of lub oil system including all parts e.g. filter cooler, strainer, pump pipe line. | 10 | Job | 2,292 ₹22,920 | 2,126 ₹21,260 | 2,068 ₹20,680 Lowest |
| 100.00 | Part-B (Preventive & Breakdown Maintenance) Decoupling, alignment and coupling of plant air compressor motor with compressor. | 6 | Job | 5,581 ₹33,486 | 5,338 ₹32,028 | 5,193 ₹31,158 Lowest |
Tender Value
₹28.6 L
EMD Value
₹58,000
Closing Date
23 Sept 2025, 4:00 pmClosed
SE O and MC I BTPS Anpara
Office of SE O and MC I BTPS Anpara
Routine Preventive and breakdown maintenance operation general upkeep and overhauling of Plant Air and Instrument Air Compressor IHI Japan make and its accessories and Ventilation System installed at BTPS
2025_RVUNL_1067020_1
T-01/CAD/BTPS/2025-26
Open Tender
Repair and Maintenance Works
Fixed-rate
730 days
Anpara
As per PQC
2 documents required · 2 mandatory
₹1,180
Dy CAO CFA and BO BTPS Anpara
₹58,000
15 Oct 2025
21 Aug 2025
25 Sept 2025
21 Aug 2025
23 Sept 2025
21 Aug 2025
Amount
PART - A (Routine Maintenance of Compressor )Daily/Shift-wise maintenance of 07 No’s Air compressors, compressed air system round the clock
Part-B (Preventive & Breakdown Maintenance) Preventive /Breakdown Maintenance ofInter-cooler/After-cooler
Part-B (Preventive & Breakdown Maintenance) Preventive /Breakdown Maintenance of Pre-filter and After-filter
Part-B (Preventive & Breakdown Maintenance) Preventive /Breakdown Maintenance of Dryer, valves & accessories
Part-B (Preventive & Breakdown Maintenance) Preventive /Breakdown Maintenance ofAir Receivers
Part-B (Preventive & Breakdown Maintenance) Preventive/Breakdown maintenance of air compressors valves
Part-B (Preventive & Breakdown Maintenance) Inspection and attending leakage and breakdown of LP/HP of piston of compressor
Part-B (Preventive & Breakdown Maintenance) Inspection and attending leakage and breakdown of LP/HP cylinder linercylinder liner of compressor
Part-B (Preventive & Breakdown Maintenance) Servicing and attending fault of lub oil system including all parts e.g. filter cooler, strainer, pump pipe line.
Part-B (Preventive & Breakdown Maintenance) Decoupling, alignment and coupling of plant air compressor motor with compressor.
PART - C (Overhauling Maintenance of Compressor) Overhauling maintenance Plant air compressor
PART - C (Overhauling Maintenance of Compressor) Overhauling maintenance Instrument air compressor
PART - C (Overhauling Maintenance of Compressor) Overhauling maintenance of Air Dryer, Pre-filter, After-filter
PART - C (Overhauling Maintenance of Compressor) Painting & polishing of Plant air compressor
PART - C (Overhauling Maintenance of Compressor) Painting & polishing of Instrument air compressor
PART - C (Overhauling Maintenance of Compressor) Painting & polishing of Air Dryer, Pre-filter, After-filter
PART - C (Overhauling Maintenance of Compressor) Servicing, repairing of valve seats of valves & NRVs of Instrument & Plant Air Line. (Size-75mm-200mm)
PART-D (Routine Maintenance Work of Ventilation System) Operation of ventilation system /equipment installed at T.G. Hall, Switch Gear Rooms. CW Pump House, Compressor House, Lifts machine rooms etc. of 2X500 MW BTPS Anpara. (Except Coal handling and simulator building)
PART-D (Routine Maintenance Work of Ventilation System) Cleaning of Aluminum viscous air filters covering whole area of BTPS except Coal Handling & Training simulator(600x600x25), (600x500x25), (500x500x25) mm
PART-D (Routine Maintenance Work of Ventilation System) Cleaning of Aluminum viscous air filters covering whole area of BTPS except Coal Handling & Training simulator(600x300x25) mm
PART-D (Routine Maintenance Work of Ventilation System) Cleaning of Aluminum viscous air filters covering whole area of BTPS except Coal Handling & Training simulator(300x300x25) mm
PART-D (Routine Maintenance Work of Ventilation System) Cleaning of Aluminum viscous air filters covering whole area of BTPS except Coal Handling & Training simulator Size (600x600x25), (600x500x25),(500x500x25) mm
PART-D (Routine Maintenance Work of Ventilation System) Cleaning of Aluminum viscous air filters covering whole area of BTPS except Coal Handling & Training simulator Size (200x200x25) mm
PART-D (Routine Maintenance Work of Ventilation System) Cleaning of panels, birds’ screens, silencers, wall cowls, duct, grills etc. with equipment / system as per scope of work.
PART-D (Routine Maintenance Work of Ventilation System) Cleaning of metallic filter Size:540mmx540mmx50 mm (28X12 Job)
PART-D (Routine Maintenance Work of Ventilation System) Cleaning of fabric filter Size:540mmx540mmx50 mm (28X12 Job)
PART - E (Breakdown Maintenance of Ventilation System) Complete overhauling of Exhaust/ supply centrifugal fans of capacity ranging from 1800 to 16500 CMH (0.75 to 5.5KW)
PART - E (Breakdown Maintenance of Ventilation System) Complete overhauling of Exhaust/supply Tube Axial fans of capacity ranging from 116 to 21900 CMH (0.65 to 3.7 KW)
PART - E (Breakdown Maintenance of Ventilation System) Complete overhauling of Exhaust/supply propeller fans of capacity ranging from 190 to 11400 CMH (0.2 to 1.5 KW)
PART - E (Breakdown Maintenance of Ventilation System) Complete overhauling of Roof extractor unit fans of capacity ranging from 2700 to 48000CMH (0.4 to 7.5 KW
PART - E (Breakdown Maintenance of Ventilation System) Complete overhauling of Ventilation Fan of DFA System (0.75 to 1.1 KW)
PART - E (Breakdown Maintenance of Ventilation System) Complete overhauling and Repairing of fabric filters
TECHCON ENGINEERS (BID ID -5545712)
M/S USHA ENTERPRISES (BID ID -5551709)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .