Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹53.4 LAccepted-AOC MIG 80 R P NAGAR KORBA CG | KORBA | KORBA | CHHATTISGARH | L-1 | Accepted-AOC The work is being awarded to the L-1 bidder BHAKULAL SAHU, vide Ref. No. SECL/GM/KSA/C/22-23/768, Dtd 06.03.2023. | |
| 2 | L-2₹50.2 L+₹5.0 L (11.0%)Rejected-Finance BEHIND SUB POST OFFICE KORBA CG | KORBA | KORBA | CHHATTISGARH | L-2 | Rejected-Finance Rejected being L-2 bidder |
Tender Value
₹56.9 L
EMD Value
₹71,200
Closing Date
14 Oct 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER (CIVIL), SECL KUSMUNDA AREA
OFFICE OF THE STAFF OFFICER (CIVIL), SECL KUSMUNDA AREA P.O. KUSMUNDA COLLIERY 495454 DISTT. KORBA (CG) CONTACT No. 9425533008
Heightening of Wharf wall to control spillage coal on NK1 and NK2 siding at at Kusmunda Project of Kusmunda Area.
2022_SECL_257252_1
SECL/GM/KSM/CIVIL/ e-Tender/22-23/31 Dt 23.09.22
Open Tender
Civil Works - Others
Item Rate
120 days
KUSMUNDA AREA, SECL
AS PER NIT and TENDER DOCUMENT
5 documents required · 5 mandatory
₹71,200
6 Mar 2023
23 Sept 2022
17 Oct 2022
24 Sept 2022
14 Oct 2022
24 Sept 2022
24 Sept 2022 - 3 Oct 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
Total impact of GST for the purpose of CTC
M/s. B.Prasad & Co.
stage.html
html • 0.04 MB
technical_266013.pdf
PDF • 0.39 MB
techsummary_266013.pdf
PDF • 4.49 MB
finance_266013.pdf
PDF • 0.08 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_266013.pdf
PDF • 0.55 MB
AOC31.pdf
PDF • 5.22 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .